This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 6, 2016
Subdivision of various lots, Patterson Road, Rockingham identified In WAPC Subdivision Application 153179. Read more...Last updated: September 27, 2016
The proposal area is approximately 33.4 hectares of Lot 4 Underwood Ave in Shenton Park. Within this area the University intends to establish a conservation area (13.9 hectares), Public Open Space (2 hectares) and a development area (17.5 hectares). The development area includes approximately 13 hectares to be developed for residential purposes with the remainder of the area for “University purposes - future use and development”, as it is affected by odour from the Subiaco Wastewater Treatment... Read more...Last updated: September 6, 2016
The proposal is to develop a granite quarry in Gidgegannup, which is expected to yield up to 500,000 tonnes of rock per annum. The proposal is further documented in EPA Report 1375 and Ministerial Statement 861 . Read more...Last updated: September 1, 2016
The Public Transport Authority of Western Australia proposes the Forrestfield-Airport Link, a 9km extension of the Perth rail network from Bayswater to Forrestfield. Read more...Last updated: April 26, 2016
The proposal is to construct and operate a Wood Waste to Energy Plant at the existing Hazelmere Recycling Centre on Part Lot 100 and Lot 301, Lakes Road, Hazelmere. Read more...Last updated: October 22, 2015
The Port Kennedy Regional Recreation Centre – Becher Point, Stage 1 proposal is for the creation of a major public recreation area and conservation park at Port Kennedy. Stage 1 of the proposal included a hotel, marina, holiday accommodation, two golf courses, and conservation areas. This inquiry under s46 is in regard to changing and consolidating the conditions of Ministerial Statements 105 and 359 . Read more...Last updated: May 20, 2015
The proposal is for the extension of an existing quarry at The Lakes, approximately 16 kilometres east of Mundaring and 47 kilometres south-west of Northam on the Great Southern Highway. The proponent has been operating the existing quarry since 1990. The quarry provides crushed granite for a variety of uses, including concrete, road base and building products. The current quarry comprises an open pit, a crushing plant, noise attenuation bunds, product stockpiles, a water supply dam, a workshop... Read more...Last updated: February 20, 2015
The proposal is to discharge up to 30 megalitres per day (ML/day) of industrial wastewater, in addition to treated wastewater from Woodman Point and Cape Peron wastewater treatment plants and water from the Jervoise Bay Groundwater Recovery Scheme, to the Sepia Depression via the Cape Peron outlet line from the Kwinana Wastewater Reclamation Plant (KWRP); BP Refinery (Kwinana); CSBP Limited; Edison Mission Energy, and further unspecified sources. Read more...Last updated: February 18, 2015
Derived Proposal, : Lot 21 Alumina Road, East Rockingham identified in plan of subdivision titled Subdivision Concept Plan Lot 21 Alumina Road, East Rockingham dated 31 January 2014. Read more...Last updated: January 20, 2015
To build and operate a Waste to Energy and Materials Recovery Facility on Lot 1 Office Road, 3 kilometres north-east of Rockingham in the Rockingham Industrial Zone. Read more...Last updated: October 16, 2014
The proposal is to develop a mineral sands mine near the Keysbrook township. The proposal involves the extraction and processing of a low-grade heavy mineral sands deposit. This inquiry under s46 is in regard to a request for an extension of time for substantial commencement specified in Ministerial Statement 810 . Read more...Last updated: June 18, 2014
Subdivision of Lot 500 Patterson Road, East Rockingham identified in plan of subdivision titled Rockingham Industry Zone Subdivision Plan Lot 500 Patterson Road, Rockingham (Rockingham Amended Plan dated 7 August 2013). Inquiry under section 46(4) into the implementation conditions of Ministerial Statement 863 . Read more...Last updated: April 22, 2014
The Port Kennedy Regional Recreation Centre proposal was assessed by the EPA in 1989, approved by the Minister for the Environment in Ministerial Statement 105 , and received further government endorsement in the, Port Kennedy Development Agreement Act 1992, . During that time active consideration was being given to shifting part of the area proposed for conservation. Following the completion of the EPA's assessment and while the conditions were being set, this possible change was... Read more...Last updated: April 2, 2014
The proposal is to create a major public recreation and conservation park venue for the community of Western Australia at a key coastal site in the Perth metropolitan region. Read more...Last updated: February 12, 2014
Proposal by Ocean Dunes Pty Ltd to develop a recreational resort complex incorporating an 18 hole dune links type golf course of international competition standard, marina and beach resort and a residential estate on a 245 ha coastal site at Eglinton, some 45 mins north of the Perth Central Business District. Read more...Last updated: December 6, 2013
Extract sand from mining tenement ML70/326, Lot 5892 Maralla Road, Bullsbrook. Inquiry under s46 to change the conditions of Ministerial Statement 24. Read more...Last updated: November 19, 2012
Existing quarry operations (Pioneer No.1) are located on freehold land owned by Pioneer at Lot 11, Neuman Road, Heme Hill in the Shire of Swan. It is proposed to relocate the operation to a new site (Pioneer No.2), within the freehold property, 1.5 kilometres east of the present site in a valley behind the main ridge of the Darling Scarp. Pioneer No.2 is expected to be operational within three years of the date that all necessary approvals have been obtained. The new site has at least 100 years... Read more...Last updated: August 1, 2011
The proposal is to increase the mine dewatering rate up to 50 Gigalitres per annum and to inject surplus water into two brackish and one saline injection zones at the Christmas Creek Mine. Read more...Last updated: April 21, 2011
The proposal is to develop a granite quarry in Gidgegannup, which is expected to yield up to 500,000 tonnes of rock per annum. Read more...Last updated: March 24, 2011
Proposal to deepen the Fremantle Inner Harbour, Entrance Channel and the Deep Water Channel, and further reclamation at Rous Head by Fremantle Ports. Read more...