This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 18, 2023
The Brockman Syncline proposal is located approximately 60 km west-north west of Tom Price, in the central Pilbara region of Western Australia. The proposal includes up to 9,977 ha of native vegetation clearing to support the development of new and above and below water table mining areas in order to sustain mining at three existing operations; Nammuldi-Silvergrass Brockman 2 Brockman 4 The proposal includes, but is not limited to the following: Dewatering and surplus water management,... Read more...Last updated: September 13, 2023
Woodside Energy Ltd (Woodside) proposes to construct and operate the Woodside Solar Facility in the Maitland Strategic Industrial Area, located approximately 15 kilometres south-west of Karratha, in the Pilbara region of Western Australia. The proposal will generate electricity (up to 500 megawatts) from a large-scale solar photovoltaic (PV) farm and includes energy storage (battery) infrastructure. The Proposal is only for the infrastructure associated with the generation and storage of... Read more...Last updated: September 13, 2023
The Banksia Road Landfill is located in the Shire of Dardanup approximately 10 kilometres (km) from the City of Bunbury and 3.8 km south-east of the town of Dardanup. The Landfill is currently operating under a Licence issued through Part V of the Environmental Protection Act (Licence - L8904/2015/1) which allows for the acceptance of Liquid Waste; and Class II and Class III putrescible waste. The proposal would be a continuation of the current operations and including the establishment of... Read more...Last updated: September 8, 2023
The proposal is a derived proposal to expand existing mining operations at the Newman Hub in the Pilbara, previously authorised by Ministerial Statement (MS) 1105 Pilbara Expansion Strategic Proposal. This proponent proposes to expand the existing Orebody 32 above water table iron ore mine (currently authorised by MS 1037 Eastern Ridge Revised Proposal) in BHP’s Newman Hub to below the water table. The proposal is located 3.6 km northeast of Newman, and includes activities permitted to be... Read more...Last updated: September 8, 2023
BHP propose to expand existing mining operations at the Newman Hub in the Pilbara, approximately 2 kilometres (km) southwest of Newman. The Proposal is a derived proposal for mining operations at Newman (Western Ridge) authorised by the Pilbara Expansion Strategic Proposal, Ministerial Statement 1105. The proposal is to develop four iron ore deposits to expand BHP’s Newman Hub and includes: overburden storage areas ore and topsoil stockpiles haul and access roads overland conveyor 30 million... Read more...Last updated: September 7, 2023
The Proposal is for the above and below water table mining of iron ore from five open cut pits, located approximately 30 km north of Nullagine. The Proposal includes the development of mine pits and associated infrastructure including but not limited to crushing and screening facilities, waste landforms, run of mine pad, access roads, solar field, administration, accommodation camp, stockpile and laydown areas, borrow pits, groundwater bores and transfer infrastructure, explosives magazine,... Read more...Last updated: September 5, 2023
South32 Worsley Alumina Pty Ltd currently operates the Boddington Bauxite Mine (located approximately 5km south-west of Boddington), Worsley Refinery (located approximately 15 km north-west of Collie) and port operations at the Bunbury Port. The new proposal is for the: · expansion of the existing mining area and incorporation of new mining areas; · development of a bauxite transport corridor; · development of a contingency mining area and maintenance work at the Refinery; and · development of... Read more...Last updated: September 4, 2023
The Forest Management Plan 2024-2033 (FMP 2024-2033) is a statutory plan for the management of approximately 2,522,000 hectares of land and waters vested in the Conservation and Parks Commission in the south-west of Western Australia, in accordance with the, Conservation and Land Management Act 1984, (CALM Act) to fulfil the statutory purposes for which that land is reserved. The proposal is to undertake a range of management activities, the most significant being conservation reserve creation... Read more...Last updated: August 17, 2023
Mt Weld Mining Pty Ltd proposes to expand the Mt Weld Mine, which includes the construction and operation of a rare earths mine and processing plant, to its life of mine extent. The expansion proposes to increase the development envelope from the currently approved 505 hectares (ha) to 2,802 ha, to allow for expansion of infrastructure and activities, including: a staged transition from diesel fuelled power generation to gas hybrid renewable (including solar and battery energy storage, and... Read more...Last updated: August 15, 2023
Change to condition 1 commitment 1, updating the commitment to be in line with requirements under the Aboriginal Heritage Act 1972 and the Heritage Agreement in place between AGID and the local Traditional Owners (Buurabalayji Thalanyji Aboriginal Corporation (BTAC)). Read more...Last updated: August 11, 2023
The proposal is to construct a nominal 260MW peaking power plant, consisting of: two open cycle air-cooled gas turbine generator sets; standby liquid fuel storage (1.5ML of ultra low sulphur diesel); and ancillary buildings and plant. The plant will predominantly use natural gas, and will operate as a peaking plant for meeting short duration, high power demands for electricity. The plant may also operate as spinning reserve, using gas at a very low load in anticipation of high demand. The... Read more...Last updated: August 10, 2023
The Western Australian Water Corporation is proposing to construct the Alkimos Seawater Desalination Plant (ASDP) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The ASDP Proposal will be located within the Alkimos Water Precinct (Lot 1050 Marmion Avenue), approximately 40 km north of the Perth, within the northwest corridor, north of Quinns Rock beach and south of Yanchep beach.... Read more...Last updated: July 31, 2023
The proposal will provide additional port facilities at Port Hedland to receive and stockpile the product from emerging miners, specifically the various mines owned by the proponent’s shareholders, and load this product onto ships for export. Each of the shareholders is exploring and developing new iron ore projects in the Pilbara, with one company actively mining ore and exporting through the existing facilities in the Port of Port Hedland. The current shareholders of the proponent are Atlas... Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 in response to a request to change condition 3 - Time Limit for Proposal Implementation of Ministerial Statement 891 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 31, 2023
This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 25, 2023
AGI Operations Pty Limited propose to construct and operate a gas processing plant and pipeline associated with the development of the West Erregulla gas field, located approximately 230 kilometres (km) north-east of Perth, and 50 km south-east of Dongara, Western Australia. The processing plant will process gas produced from third party owned upstream wells. The processed gas will then be transported via a new interconnecting pipeline to the Dampier to Bunbury Natural Gas Pipeline (DBNGP). The... Read more...Last updated: July 16, 2023
VRX Silica Ltd propose to develop a silica sand mine in the Geraldton Sandplain bioregion of Western Australia, approximately 270 km north of Perth. The proposal would include a total disturbance of 412.2 hectares of native vegetation and will involve sequential mining of sand 8 – 15 metres below the soil surface. Vegetation and topsoil will be relocated to rehabilitation areas using the Vegetation Direct Transfer method. Mining will be undertaken in sections by removing blocks (typically 150m... Read more...Last updated: July 4, 2023
In 1998 Main Roads Western Australia (Main Roads) referred Stages 2, 3 and 4 of the Karratha – Tom Price Road, now called the Manuwarra Red Dog Highway (the Original Proposal), to the Environmental Protection Authority (EPA). The EPA assessed the Original Proposal and published EPA Report 1159. Ministerial Statement (MS) 677 was published in 2005. Construction of Stage 2 was completed in 2008. Stage 3 of the Original Proposal is currently under construction and is expected to be completed in... Read more...Last updated: July 3, 2023
The Proposal is located in the Pilbara region of Western Australia within a development envelope of 20,821 ha and clearing no more than 1,564 ha. Onslow Infraco Pty Ltd (herein MRL a wholly owned subsidiary of Mineral Resources Limited) is proposing to develop: • A fully sealed private haul road, approximately 125km in length • Gas pipeline and ancillary haul road infrastructure. • Storage and bulk handling of ore at the Port of Ashburton. • Dredging a dedicated berthing pocket adjacent to the... Read more...Last updated: June 26, 2023
Karara Mining Limited is seeking to revise its existing Karara Iron Ore Mine, located 320 km north-northeast of Perth in the Midwest Region of Western Australia. The revised proposal includes additional ground disturbance to support the revised Life of Mine strategy, including a revised development envelope, extension of the tailings storage facility and waste rock landform, incorporation of the areas previously approved under the Mungada Iron Ore Project (MIOP) (MS 806) and areas required for... Read more...