This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: August 23, 2022
Australian Gold Reagents Pty Ltd propose to increase production at the existing Kwinana sodium cyanide liquid plant from 91,000 tonnes per annum (tpa) to a total of 110,000 tpa; and to increase production of solid sodium cyanide from 45,000 tpa up to 60,000 tpa. The proposal also includes connecting the two existing thermal combustion units to allow waste gas from either plant during down time to be directed through a combined header to the operational thermal combustion unit for effective... Read more...Last updated: November 30, 2020
Austral Bricks is proposing the redevelopment of the Cardup Brickworks, which includes the expansion of the existing factory, increasing the design capacity from 200,000 to 250,000 tonnes per annum. The site is located in the southern extremity of Byford. Additional ancillary improvements include the installation of a new baghouse scrubber and a new primary crusher located in the floor of the pit. The proposal would include: Expanding the capacity from 200,000 to 250,000 tonnes per annum; ... Read more...Last updated: June 24, 2020
Inquiry under Section 46(3) of the, Environmental Protection Act 1986, (EP Act) on CSBP Limited’s (CSBP) proposal to debottleneck their Ammonia Plant from 650 to 745 tonnes per day (tpd). Read more...Last updated: May 18, 2020
Changes to condition 2 (Proponent Commitments), condition 4 (Compliance Audit and Performance Review), condition 5 (Decommissioning Plan), condition 6, (Review of Options for the Transport of Solid Sodium Cyanide), condition 7 (Transport of Solid Sodium Cyanide), condition 8 (Transport of Liquid Sodium Cyanide), condition 9 (Noise Management), condition 10 (Emissions Verification) and condition 11 (Cyanide Monitoring). Read more...Last updated: February 25, 2019
Wasterock Pty Ltd and Hazelland Pty Ltd propose to remediate a historical inert landfill located at Lot 20 Adelaide Street Hazelmere for future commercial use. The proposal would involve recontouring the existing site and capping it with clean fill. Read more...Last updated: July 18, 2016
Keppel Holdings proposes the development and operation of a mobile concrete batching plant at Lot 105 (No. 2) Clune Street, Bassendean. The proposal site is located within the Bassendean Industrial Area. The proposal includes the construction of buildings and associated car and truck parking. Read more...Last updated: July 12, 2007
The proposal is for the construction and operation of an ethanol bio-refinery on a 19 hectare site in the Kwinana Industrial Area. Read more...Last updated: October 17, 2005
Proposal by Wambo Power Ventures Pty Ltd (WPV) to construct and operate a 320 megawatt (MW) continuous base load, combined cycle gas turbine (CCGT) power station situated in Kwinana. Read more...Last updated: September 21, 2005
CSBP currently produces approximately 235,000 tpa of ammonium nitrate at its Kwinana operations which are located within the Kwinana Industrial Area. This proposal is to expand the ammonium nitrate production capacity to approximately 580,000 tpa by debottlenecking and duplicating its existing facilities. The expansion includes: duplication and/or debottlenecking of the existing 500 tpd nitric acid plant; duplication and/or debottlenecking of the existing 635 tpd ammonium nitrate reaction plant... Read more...Last updated: November 25, 2004
Australian Gold Reagents Pty Ltd (AGR) proposes a review of its Ministerial conditions relating to the manufacture, storage and transport of sodium cyanide in order to clarify their intent, remove obsolete or confusing aspects, update standard conditions and consolidate the relevant conditions into one Statement. Read more...Last updated: November 18, 2002
The proposal is to construct and operate a commercial scale HIsmelt Process Plant at Kwinana in Western Australia. The plant will be located at the site currently occupied by the existing HIsmelt Research and Development Facility (HRDF) within the northern portion of the Kwinana Industrial Area (KIA), 40km south of Perth. The Stage 1 plant will initially produce around 820,000 tonnes per annum of pig iron. If the Stage 1 plant is found to be technically and commercially viable, the proponent... Read more...Last updated: August 5, 2002
AGR is a joint venture between Wesfarmers CSBP Limited and Coogee Chemicals Pty Ltd which was formed to manufacture and market sodium cyanide. The AGR facility is located at Wesfarmers CSBP's fertiliser and chemicals complex in Kwinana (Figure 1). It currently operates two liquid sodium cyanide plants which have a combined production capacity of 50,000 tonnes per annum (tpa) of pure (100 percent) sodium cyanide, with the potential to expand to 70,000 tpa. These plants produce sodium... Read more...Last updated: March 18, 1998
The proposal is for the construction and operation of a 650 tonne per day ammonia plant, at CSBP Kwinana site (immediately to the east of the existing ammonia plant), which is located within the Kwinana heavy industry area about 33km south of Perth. Read more...Last updated: June 30, 1997
The proposal is to increase the production capacity of Tiwest's titanium dioxide plant at Kwinana. The proposal is to modify/expand the existing plant to allow an increase in production capacity from 80,000 tonne per annum (tpa) to 180,00 tpa of titanium dioxide pigment in three notional stages: Stage I: increase to 120,000 tpa, Stage 2: increase to 165,000 tpa and Stage 3: increase to nominally 180,000 tpa. The first and second stages of the expansion wilI require major modifications to... Read more...Last updated: September 28, 1995
Tiwest Joint Venture proposes to increase the production of finished titanium dioxide pigment at its Kwinana Pigment Plant from 64,000 to 80,000 tonnes per annum by undertaking a "debottlenecking" process. Read more...Last updated: August 19, 1994
The Tiwest Joint Venture (TJV), the proponent, proposes to increase the production of finished titanium dioxide pigment at its Kwinana Pigment Plant. The Tiwest Joint Venture has requested changes to Condition 1 of the Ministerial Statement of 26 April 1989, relating to the Pigment Plant. Condition 1 restricts the original plant to 54,000 tonnes per annum of finished titanium dioxide pigment, as assessed by the Environmental Protection Authority in Bulletin 373. The proponent now proposes to... Read more...