Last updated: February 1, 2022
Changes to condition 7 to remove reference to the onsite brickmaking facility. Read more...Last updated: January 31, 2022
To build and operate a waste to energy plant on Lot 9500 Leath Road, Kwinana in the Kwinana Industrial Area. Read more...Last updated: November 25, 2021
Changes to condition 5 (relating to performance review), condition 9 (relating to stack emissions), and condition 11 (relating to decommissioning), in order to contemporise the conditions of the Statement and streamline its regulatory obligations. Read more...Last updated: November 23, 2021
Changes to Schedule 1 and Condition 12 (Odour Management) of Ministerial Statement 755 in order to: • Amend a key proposal characteristic in Schedule 1 regarding venting of odours. • Review the suitability of Condition 12 in light of the proposed change to Schedule 1 and having regard to the Licence requirements under Part V of the EP Act. Read more...Last updated: July 15, 2021
The proposal is for the construction and operation of a Lithium Hydroxide Refinery at Lot 15 Mason Road, Kwinana within the Kwinana Industrial Area, approximately 31 km south of the Perth Central Business District. The Proposal will process spodumene ore concentrate, to produce battery grade Lithium Hydroxide Monohydrate, primarily for use in Lithium ion batteries for electric vehicles. The proposal would require a total of 11.2 hectares of native vegetation clearing within a 76 hectare... Read more...Last updated: February 3, 2021
Main Roads WA is proposing to conduct works to upgrade approximately 1.5 kilometre (km) of High Street in the City of Fremantle, Western Australia. The upgrade from Stirling Highway to Carrington Street to a four lane dual carriageway is aimed at improving road safety. The works would require a total disturbance of approximately 20.1 hectares (ha), including 1.8 ha of the Fremantle Public Golf Course, Royal Fremantle Golf Club (Class A reserve) and 0.1 ha of the Fremantle Environmental Resource... Read more...Last updated: November 3, 2020
The construction, operation and maintenance of a nominal 320 megawatt combined cycle base load power plant at Kwinana, as documented in schedule 1 of the ministerial statement. Read more...Last updated: July 21, 2020
Changes to Environmental Commitment 2.2.1 related to condition 1 and condition 3, in order to change the authorised storage capacity of chlorine at the proposed site. Read more...Last updated: June 24, 2020
Inquiry under Section 46(3) of the, Environmental Protection Act 1986, (EP Act) on CSBP Limited’s (CSBP) proposal to debottleneck their Ammonia Plant from 650 to 745 tonnes per day (tpd). Read more...Last updated: January 20, 2020
Changes to condition 3 of Ministerial Statement 976 in order to extend the Time Limit for Authorisation for substantial commencement of the proposal. Read more...Last updated: October 14, 2019
The proposal involves the excavation and processing of a low-grade (2.7%) heavy mineral sands deposit near Keysbrook to produce 920,000 tonnes of Heavy Mineral Concentrate (HMC) over 8 years. An area of 30 hectares (ha) would be progressively mined at any time. Topsoil would be removed and stockpiled for use in rehabilitation. The ore would be excavated and unloaded into a dump hopper located on the pit floor. The ore would be conveyed to a screening plant where oversize material would be... Read more...Last updated: March 26, 2019
The proposal is to upgrade the Liquefied Petroleum Gas (LPG) extraction plant at Kwinana. The proposed upgrade will coincide with a reduction in the concentration of LPG available in natural gas from the North West Shelf and enable the proponent to maintain existing levels of production of LPG. Read more...Last updated: February 25, 2019
New Energy Corporation Pty Ltd propose to revise the Waste to Energy technology for their approved Waste to Energy and Materials Recovery Facility on Lot 1 Office Road, 3 kilometres north-east of Rockingham in the Rockingham Industrial Zone (Shire of Rockingham). Read more...Last updated: August 13, 2018
The proposal is to expand CSBP's Kwinana Ammonium Nitrate Production Facility (ANPF) by incorporating additional components into the existing facility and re-engineering (debottlenecking) some existing components in order to increase ammonium nitrate production capacity from 520,000 tpa to 936,000 tpa. Read more...Last updated: July 31, 2017
Elan Energy Matrix Pty Ltd proposes to construct and operate a Tyre Resource Recovery Facility to recycle used tyres at 9 Fargo Way Welshpool, approximately 12 kilometres southeast of Perth within a ‘General Industry’ zone in the City of Canning. The proposal will involve thermal processing of used tyres to produce carbon black (material derived from char), steel wire, oil and process gas using an indirect fired thermal conversion unit. The plant will be located within enclosed buildings.... Read more...Last updated: April 3, 2017
The Western Australian Planning Commission and the City of Armadale propose to develop a water-based recreation park incorporating an international rowing course and other facilities including a residential component on land situated on Lake Road in the City of Armadale. Read more...Last updated: January 23, 2017
This proposal is to amend conditions of Ministerial Statement 433 relating to dust where these emissions are appropriately regulated through part V of the EP Act. Read more...Last updated: September 6, 2016
The proposal is to develop a granite quarry in Gidgegannup, which is expected to yield up to 500,000 tonnes of rock per annum. The proposal is further documented in EPA Report 1375 and Ministerial Statement 861 . Read more...Last updated: April 26, 2016
The proposal is to construct and operate a Wood Waste to Energy Plant at the existing Hazelmere Recycling Centre on Part Lot 100 and Lot 301, Lakes Road, Hazelmere. Read more...