This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 11, 2018
The proposal is for the construction and operation of a technical ammonium nitrate production facility (TANPF) on Site D within the King Bay/Hearson Cove Industrial Estate on the Burrup Peninsula. The proposal is located approximately 13 kilometres north-west of Karratha. Read more...Last updated: April 4, 2018
Griffin Power Pty Ltd, proposes to construct and operate a 200MW coal-fired power station known as the Bluewaters Power Station Phase II (Bluewaters II) adjacent to the proposed Bluewaters Power Station (Bluewaters I) on a site located approximately 4km north-east of Collie. It would be a subcritical coal-fired base-load generation facility with a nominal generating capacity of up to 200MW. The Bluewaters II Power Station would supplement the Bluewaters I Power Station and supply electricity... Read more...Last updated: November 24, 2017
Section 46 Change to Conditions withdrawn 24 November 2017. Read more...Last updated: April 3, 2017
The Western Australian Planning Commission and the City of Armadale propose to develop a water-based recreation park incorporating an international rowing course and other facilities including a residential component on land situated on Lake Road in the City of Armadale. Read more...Last updated: January 23, 2017
This proposal is to amend conditions of Ministerial Statement 433 relating to dust where these emissions are appropriately regulated through part V of the EP Act. Read more...Last updated: January 9, 2017
Toro proposes to revise the Approved Project by developing Millipede and Lake Maitland uranium deposits and developing associated infrastructure. The Proposed Extension would result in the additional direct disturbance of approximately 1,582 hectares (ha) within an additional Development Envelope of approximately 3,891 ha. The Proposed Extension would include open mine pits at Millipede and Lake Maitland, in-pit tailings storage facility (TSF) at Millipede, accommodation village, workshop, run-... Read more...Last updated: December 16, 2016
The proposal is to mine four poly-metallic deposits containing commercial concentrations of uranium and to produce uranium oxide concentrate and other metal concentrates including copper, zinc, nickel and cobalt, approximately 240km east-northeast of Kalgoorlie. The proposal also includes the construction of associated mine infrastructure consisting of mine dewatering and reinjection infrastructure (including borefields and pipelines), non-mineralised overburden landforms, run of mine stockpile... Read more...Last updated: November 30, 2016
The Site is approximately 16.9 ha and is proposed to be remediated and regenerated. It was previously mined for building and construction sands and was later used as a licensed “inert” landfill. It has been reported that non-approved waste streams were disposed of at the Site. In October 2010 following a compliance inspection the Site was classified “Contaminated – Remediation Required” under Section 13 of the Contaminated Sites Act 2003 The proponent is proposing to redevelop the area by... Read more...Last updated: November 29, 2016
The proponent, Iron Bridge Operations Pty Ltd (a Joint Venture between FMG Iron Bridge Pty Ltd and Formosa Steel IB Pty Ltd), proposes to construct and operate new infrastructure within the existing Herb Elliot Port Facility, Fortescue Metals Group, Port Hedland. The proposal, Iron Bridge Port Facility, is designed to accept 10 Mtpa of magnetite concentrate slurry from the North Star Magnetite Project, whereupon the slurry would be dewatered and the concentrate product stored within a shed that... Read more...Last updated: September 27, 2016
The construction and operation of the Wagerup Alumina Refinery to a maximum capacity of 4.7 million tonnes per annum and its associated bauxite mining. Inquiry under s46 regarding amendment of the conditions of Ministerial Statement 728. Read more...Last updated: September 6, 2016
The proposal is to develop a granite quarry in Gidgegannup, which is expected to yield up to 500,000 tonnes of rock per annum. The proposal is further documented in EPA Report 1375 and Ministerial Statement 861 . Read more...Last updated: July 18, 2016
Keppel Holdings proposes the development and operation of a mobile concrete batching plant at Lot 105 (No. 2) Clune Street, Bassendean. The proposal site is located within the Bassendean Industrial Area. The proposal includes the construction of buildings and associated car and truck parking. Read more...Last updated: September 21, 2015
The proposal is to upgrade the Pinjarra Alumina Refinery. The proposal involves an upgrading of the seed filtration facility to improve its efficiency in order to increase the alumina production by approximately 17% to approximately 4.2 million tonnes per annum. This will require an increase in the bauxite mining rate at Alcoa’s Huntly bauxite mine and additional bauxite grinding, slurry storage and calcination facilities. Read more...Last updated: August 7, 2015
The Minister for Environment requested the EPA inquire into the matter of changing the implementation conditions relating to the Orebody 18 Iron Ore Mine proposal, particularly the matter of setting a condition on the proposal that would require environmental offsets for the clearing of native vegetation. Inquiry under s46 relating to Ministerial Statement 439 and EPA Report 840 . Read more...Last updated: August 5, 2015
The proposal is to construct and operate an ammonia plant on the Burrup Peninsula, approximately 1300 kilometres north of Perth. The selected project site is located in the King Bay-Hearson Cove Industrial Area and is approximately 6 and 10 kilometres from the towns of Dampier and Karratha respectively. The site covers an area of about 72 hectares and the actual plant footprint and infrastructure (including a thermal desalination plant) will occupy an area of approximately 20 hectares. Read more...Last updated: April 30, 2015
To expand the liquefied natural gas (LNG) production capacity of the existing proposal from 15 million tonnes per annum (Mtpa) to 20 Mtpa (nominal). Read more...Last updated: March 4, 2015
The proposal is for the construction and operation the Kintyre uranium project. The proposal includes the open cut mining of uranium ore, processing, and the transport of uranium ore concentrate to the Port of Adelaide. The project is located 260km north-east of Newman in the East Pilbara region of Western Australia. Read more...Last updated: January 20, 2015
To build and operate a Waste to Energy and Materials Recovery Facility on Lot 1 Office Road, 3 kilometres north-east of Rockingham in the Rockingham Industrial Zone. Read more...