Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • Infrastructure (6) Apply Infrastructure filter
  • Industrial (2) Apply Industrial filter
  • Bauxite (1) Apply Bauxite filter
  • Oil and gas (1) Apply Oil and gas filter
  • Power generation (1) Apply Power generation filter

Filter by current status:

  • Ministerial Statement published (8) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (2) Apply Decision on whether to assess has been published filter
  • Environmental Scoping Document approved (1) Apply Environmental Scoping Document approved filter

Filter by preliminary environmental factors:

  • (-) Remove Air Quality filter Air Quality
  • (-) Remove Coastal Processes filter Coastal Processes
  • (-) Remove Social Surroundings filter Social Surroundings
  • Benthic Communities and Habitats (8) Apply Benthic Communities and Habitats filter
  • Flora and Vegetation (8) Apply Flora and Vegetation filter
  • Marine Environmental Quality (8) Apply Marine Environmental Quality filter
  • Terrestrial Fauna (8) Apply Terrestrial Fauna filter
  • Marine Fauna (6) Apply Marine Fauna filter
  • Human Health (3) Apply Human Health filter
  • Inland Waters (2) Apply Inland Waters filter
  • Landforms (1) Apply Landforms filter
  • Subterranean Fauna (1) Apply Subterranean Fauna filter
  • Terrestrial Environmental Quality (1) Apply Terrestrial Environmental Quality filter

Filter by Proponent:

  • Minister for State Development (2) Apply Minister for State Development filter
  • Burrup Nitrates Pty Ltd (1) Apply Burrup Nitrates Pty Ltd filter
  • Chevron Australia Pty Ltd (1) Apply Chevron Australia Pty Ltd filter
  • James Point Pty Ltd (1) Apply James Point Pty Ltd filter
  • Minister for Resources Development (1) Apply Minister for Resources Development filter
  • Murchison Hydrogen Renewables Pty Ltd as trustee for Murchison Hydrogen Renewables Project Trust (1) Apply Murchison Hydrogen Renewables Pty Ltd as trustee for Murchison Hydrogen Renewables Project Trust filter
  • NWIOA Ops. Pty Ltd trading as North West Infrastructure (1) Apply NWIOA Ops. Pty Ltd trading as North West Infrastructure filter
  • NWIOA Ops. Pty Ltd (trading as North West Infrastructure) (1) Apply NWIOA Ops. Pty Ltd (trading as North West Infrastructure) filter
  • Perdaman Chemicals and Fertilisers Pty Ltd (1) Apply Perdaman Chemicals and Fertilisers Pty Ltd filter
  • VBX Limited (1) Apply VBX Limited filter

Filter by region:

  • Pilbara (5) Apply Pilbara filter
  • Mid West (4) Apply Mid West filter
  • Kimberley (1) Apply Kimberley filter
  • Perth (1) Apply Perth filter

Filter by last updated:

  • 2022 (3) Apply 2022 filter
  • 2021 (1) Apply 2021 filter
  • 2020 (1) Apply 2020 filter
  • 2018 (1) Apply 2018 filter
  • 2017 (1) Apply 2017 filter
  • 2015 (1) Apply 2015 filter
  • 2013 (1) Apply 2013 filter
  • 2009 (1) Apply 2009 filter
  • 2004 (1) Apply 2004 filter
  1. Home
  2. Proposal search
  3. Air Quality
  4. Social Surroundings
  5. Coastal Processes

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Multi-User Iron Ore Export (Landside) Facility Port Hedland (S46) [2349]

Last updated: September 5, 2022

The requested change relates to condition 3 of Ministerial Statement 1056 (as relevant to Ministerial Statement 891) for an extension to the Time Limit for Proposal Implementation for the proposal approved under MS 891. Read more...

Murchison Hydrogen Renewables Project

Last updated: May 16, 2022

The Proposal will use combined onshore wind and solar energy of approximately 5.2 gigawatt (GW) capacity to produce green hydrogen which will be converted to an estimated 2 Million tonnes per annum (Mtpa) of green ammonia for export to emerging green energy markets. The Proposal is located within the Shire of Northampton, Western Australia (WA), approximately 20 km north of Kalbarri. The Proposal comprises the following major components: a wind and solar farm with a combined installed capacity... Read more...

Perdaman Urea Project

Last updated: January 24, 2022

Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. The EPA considered the Study of the Cumulative Impacts of Air Emissions in the Murujuga Airshed in its assessment of the Perdaman Urea Project. Read more...

Wuudagu Bauxite Project

Last updated: June 9, 2021

VBX Limited propose to develop a bauxite mine located approximately 15 km west of the town of Kalumburu in the Kimberley. The proposal involves the mining of bauxite in the Kimberley and the use of a conveyor to transport processed ore to a barge-loading facility in Napier Broome Sound, and then trans-shipping of ore. Read more...

Oakajee Deepwater Port, Oakajee, Shire of Chapman Valley (s46) [2171]

Last updated: June 18, 2020

Inquiry under s46 into changing the conditions (extension of time limit for proposal implementation) of Ministerial Statements 469, 774, 815 and 927. Read more...

Technical Ammonium Nitrate Production Facility, Burrup Peninsula

Last updated: June 11, 2018

The proposal is for the construction and operation of a technical ammonium nitrate production facility (TANPF) on Site D within the King Bay/Hearson Cove Industrial Estate on the Burrup Peninsula. The proposal is located approximately 13 kilometres north-west of Karratha. Read more...

Multi-user Iron Ore Export (Landside) Facility, Port Hedland (s. 46)

Last updated: January 31, 2017

The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 in response to a request to change condition 3 - Time Limit for Proposal Implementation of Ministerial Statement 891 . Read more...

Gorgon Gas Development Fourth Train Expansion Proposal

Last updated: April 30, 2015

To expand the liquefied natural gas (LNG) production capacity of the existing proposal from 15 million tonnes per annum (Mtpa) to 20 Mtpa (nominal). Read more...

Oakajee Deepwater Port (s. 46) [1950]

Last updated: January 22, 2013

The proposal is for the construction of a deepwater port. Inquiry under s46 regarding changing condition 9 of Ministerial Statement 469 . Read more...

Oakajee deepwater port, Oakajee, Shire of Chapman Valley

Last updated: December 1, 2009

The proposal is to construct a deepwater port to service fully loaded Panamax sized vessels (65 000 DWT) at Oakajee, approximately 23 kilometres north of Geraldton. Three site locations (north, south and central) and two different design options (inshore and off-shore) were considered in developing the proposal. The design option favoured by the proponent is an in-shore port design at the northern sector. The port study area is approximately 23 kilometres north of Geraldton. The port will... Read more...

James Point Stage One Port, Kwinana (s101)

Last updated: November 17, 2004

The Environmental Protection Authority (EPA) has been required by the Minister for the Environment to provide further assessment on the proposal by James Point Pty Ltd (JPPL) to construct and operate a private container and general cargo Port (referred to as the Stage 1 Port) to the north of James Point in Cockburn Sound. See the original assessment here . Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2023 Government of Western Australia. All rights reserved.