This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 21, 2016
Note: In the matter of The Wilderness Society of WA (Inc) –v- Minister for Environment [2013] WASC, the Supreme Court of Western Australia found the Minister’s agreement decision invalid because the EPA’s decision to report was invalid., The proposal is a strategic environmental assessment for a common user LNG hub precinct for future Browse Basin gas processing in the Kimberley Region. Read more...Last updated: May 1, 2015
The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal is further documented in Ministerial Statement 837 and EPA Report 1349 . This assessment deals with a request for a change to the Time... Read more...Last updated: June 18, 2014
The proposal is to construct and operate a coal handling and export facility within the Bunbury Port Inner Harbour in the south-west region of Western Australia. Read more...Last updated: June 26, 2013
Chevron Australia Pty Ltd, as operator for the Gorgon Joint Venturers, proposes to extract, pipe, liquefy and export 10 million tonnes per annum of natural gas from the Greater Gorgon and Jansz gas fields using facilities offshore and on Barrow Island, Western Australia. Read more...Last updated: January 30, 2013
The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...Last updated: January 22, 2013
The proposal is for the construction of a deepwater port. Inquiry under s46 regarding changing condition 9 of Ministerial Statement 469 . Read more...Last updated: February 28, 2012
The proposal is to construct and operate the Outer Harbour Development which includes landside and marine infrastructure for the handling and export of iron ore from BHPBIO’s operations. The Boodarie stockyard infrastructure will supply an overland conveyor to a transfer pad located to the west of the existing Finucane Island facilities. A piled jetty will transfer ore material to the ship loaders located at the piled wharf. Read more...Last updated: March 14, 2011
The proposal is to construct and operate iron ore handling and storage facilities and ancillary infrastructure required to develop and operate a 45 million tonne per annum iron ore export facility at Oakajee, 24km north of Geraldton. Read more...Last updated: January 20, 2011
The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal also involves the construction and operation of an approximately 63 kilometre long wastewater discharge pipeline following the same... Read more...Last updated: December 1, 2009
The proposal is to construct a deepwater port to service fully loaded Panamax sized vessels (65 000 DWT) at Oakajee, approximately 23 kilometres north of Geraldton. Three site locations (north, south and central) and two different design options (inshore and off-shore) were considered in developing the proposal. The design option favoured by the proponent is an in-shore port design at the northern sector. The port study area is approximately 23 kilometres north of Geraldton. The port will... Read more...Last updated: March 20, 2008
The proposal is to establish materials stockpiling and handling facilities with a capacity of approximately 4 million tonnes at Cape Preston, approximately 60km west-south-west of Dampier. Read more...Last updated: November 13, 2007
This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors and principles relevant to the proposal by the Water Corporation to construct, operate and maintain a new Wastewater Treatment Plant (WWTP) and ocean outfall at Alkimos. The proposal is to develop the plant in stages up to an operational capacity of 160ML/day beyond 2050. There are two proposed sites for the WWTP, Site A and Site B... Read more...Last updated: October 17, 2005
The proposal is to construct and operate a 330MW capacity advanced sub-critical coal-fired power station (known as Collie B) at the Collie Power Station Site, immediately adjacent to the existing ‘Collie A’ Power Station. It will be an advanced sub-critical coal fired base-load generation facility with a nominal generating capacity of up to 330MW. The Collie B Power Station will supply electricity to Western Power for the South West Interconnected System (SWIS) under the SWIS Power Procurement... Read more...Last updated: September 21, 2005
CSBP currently produces approximately 235,000 tpa of ammonium nitrate at its Kwinana operations which are located within the Kwinana Industrial Area. This proposal is to expand the ammonium nitrate production capacity to approximately 580,000 tpa by debottlenecking and duplicating its existing facilities. The expansion includes: duplication and/or debottlenecking of the existing 500 tpd nitric acid plant; duplication and/or debottlenecking of the existing 635 tpd ammonium nitrate reaction plant... Read more...Last updated: November 17, 2004
The Environmental Protection Authority (EPA) has been required by the Minister for the Environment to provide further assessment on the proposal by James Point Pty Ltd (JPPL) to construct and operate a private container and general cargo Port (referred to as the Stage 1 Port) to the north of James Point in Cockburn Sound. See the original assessment here . Read more...Last updated: May 26, 2003
The proposal involves the construction and operation of a 30 GL desalination plant at one of two locations in the Kwinana Industrial Area. The alternative sites are at the Kwinana Power Station (KPS) or on the corner of Patterson and Office Roads, East Rockingham. Read more...Last updated: December 6, 2002
Proposal by Hope Downs Management Services Pty Ltd (hereafter referred to as HDMS) to construct a rail line and port facilities to support the development of an iron-ore mine, based on the Hope 1 Deposit. Read more...Last updated: November 18, 2002
The proposal is to construct and operate a commercial scale HIsmelt Process Plant at Kwinana in Western Australia. The plant will be located at the site currently occupied by the existing HIsmelt Research and Development Facility (HRDF) within the northern portion of the Kwinana Industrial Area (KIA), 40km south of Perth. The Stage 1 plant will initially produce around 820,000 tonnes per annum of pig iron. If the Stage 1 plant is found to be technically and commercially viable, the proponent... Read more...Last updated: January 24, 2001
The proposal is for a regional waste processing facility within the Kwinana Heavy Industrial Estate. The site is located on the Swan Coastal Plain approximately 30 kilometres south west of the Perth Central Business District and 3 kilometres north-west of the Town of Kwinana. The site is a large undeveloped piece of land which is adjacent to the British Petroleum (BP) refinery. The nearest residences are located to the north east in Hope Valley (approximately 2.6 kilometres) and to the east in... Read more...Last updated: September 18, 2000
Proposal to construct a gas to synthetics plant on the Burrup peninsula. Read more...