Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions
      • Ministerial Statements

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chairman's Determinations

    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • Infrastructure (13) Apply Infrastructure filter
  • Industrial (2) Apply Industrial filter
  • Oil and gas (2) Apply Oil and gas filter
  • Iron Ore (1) Apply Iron Ore filter
  • Nickel (1) Apply Nickel filter
  • Power generation (1) Apply Power generation filter

Filter by current status:

  • (-) Remove Ministerial Statement published filter Ministerial Statement published

Filter by preliminary environmental factors:

  • (-) Remove Air Quality filter Air Quality
  • (-) Remove Flora and Vegetation filter Flora and Vegetation
  • (-) Remove Marine Environmental Quality filter Marine Environmental Quality
  • Terrestrial Fauna (12) Apply Terrestrial Fauna filter
  • Social Surroundings (11) Apply Social Surroundings filter
  • Marine Fauna (8) Apply Marine Fauna filter
  • Benthic Communities and Habitats (7) Apply Benthic Communities and Habitats filter
  • Hydrological Processes (6) Apply Hydrological Processes filter
  • Coastal Processes (5) Apply Coastal Processes filter
  • Inland Waters Environmental Quality (5) Apply Inland Waters Environmental Quality filter
  • Terrestrial Environmental Quality (5) Apply Terrestrial Environmental Quality filter
  • Human Health (3) Apply Human Health filter
  • People (2) Apply People filter
  • Water (1) Apply Water filter

Filter by Proponent:

  • Minister for State Development (3) Apply Minister for State Development filter
  • Apache Energy Ltd (1) Apply Apache Energy Ltd filter
  • Apache Northwest Pty Ltd (1) Apply Apache Northwest Pty Ltd filter
  • API Management Pty Limited (1) Apply API Management Pty Limited filter
  • BHP Biliton Iron Ore (1) Apply BHP Biliton Iron Ore filter
  • Bluewaters Power 3 Pty Ltd (1) Apply Bluewaters Power 3 Pty Ltd filter
  • Chevron Australia (1) Apply Chevron Australia filter
  • Fortescue Metals Group Limited (1) Apply Fortescue Metals Group Limited filter
  • Griffin Power 3 Pty Ltd (1) Apply Griffin Power 3 Pty Ltd filter
  • Griffin Power Pty Ltd (1) Apply Griffin Power Pty Ltd filter
  • Hope Downs Management Services Pty Ltd (1) Apply Hope Downs Management Services Pty Ltd filter
  • Lanco Resources Australia Pty Ltd (1) Apply Lanco Resources Australia Pty Ltd filter
  • Minister for Resources Development (1) Apply Minister for Resources Development filter
  • Perdaman Chemicals and Fertilisers Pty Ltd (1) Apply Perdaman Chemicals and Fertilisers Pty Ltd filter
  • Ravensthorpe Nickel Operations Pty Ltd (1) Apply Ravensthorpe Nickel Operations Pty Ltd filter
  • Water Corporation (1) Apply Water Corporation filter
  • Water Corporation of Western Australia (1) Apply Water Corporation of Western Australia filter
  • Worsley Alumina Pty Ltd (1) Apply Worsley Alumina Pty Ltd filter

Filter by region:

  • Pilbara (7) Apply Pilbara filter
  • South West (4) Apply South West filter
  • Mid West (3) Apply Mid West filter
  • Perth (2) Apply Perth filter
  • Goldfields Esperance (1) Apply Goldfields Esperance filter
  • Kimberley (1) Apply Kimberley filter

Filter by last updated:

  • 2022 (1) Apply 2022 filter
  • 2021 (1) Apply 2021 filter
  • 2020 (2) Apply 2020 filter
  • 2019 (1) Apply 2019 filter
  • 2016 (2) Apply 2016 filter
  • 2015 (1) Apply 2015 filter
  • 2013 (3) Apply 2013 filter
  • 2012 (1) Apply 2012 filter
  • 2011 (1) Apply 2011 filter
  • 2009 (1) Apply 2009 filter
  • 2007 (1) Apply 2007 filter
  • 2003 (1) Apply 2003 filter
  • 2002 (1) Apply 2002 filter
  • 1996 (1) Apply 1996 filter
  1. Home
  2. Proposal search
  3. Air Quality
  4. Marine Environmental Quality
  5. Flora and Vegetation
  6. Ministerial Statement published

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Perdaman Urea Project

Last updated: January 24, 2022

Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. The EPA considered the Study of the Cumulative Impacts of Air Emissions in the Murujuga Airshed in its assessment of the Perdaman Urea Project. Read more...

Devil Creek Gas Development Project

Last updated: September 1, 2021

The proposal is for the construction and operation of a gas processing plant, onshore supply gas pipeline, onshore sales gas pipeline, and horizontal directionally drilled shore crossing. Read more...

Oakajee Deepwater Port, Oakajee, Shire of Chapman Valley (s46) [2171]

Last updated: June 18, 2020

Inquiry under s46 into changing the conditions (extension of time limit for proposal implementation) of Ministerial Statements 469, 774, 815 and 927. Read more...

Pilbara Iron Ore and Infrastructure Project: Port and North - South Railway (Stage A) (s46) [2231]

Last updated: June 3, 2020

S46 change - Removal of Condition 17: Dust Management Read more...

Ravensthorpe Nickel Project (s46)

Last updated: May 23, 2019

Inquiry under s46 into the request for a number of substantial changes to the Ravensthorpe Nickel Project, located approximately 35 km east of Ravensthorpe, the subject of Ministerial Statement 509 . In summary, the proposed changes include: mining of additional ore reserves contained within the Shoemaker-Levy and Hale-Bopp deposits and a resulting increase in clearing within the Bandalup Corridor; changes to the processing of ore and the final product: a) deletion of nickel electrowinning,... Read more...

Browse Liquefied Natural Gas Precinct

Last updated: December 21, 2016

Note: In the matter of The Wilderness Society of WA (Inc) –v- Minister for Environment [2013] WASC, the Supreme Court of Western Australia found the Minister’s agreement decision invalid because the EPA’s decision to report was invalid., The proposal is a strategic environmental assessment for a common user LNG hub precinct for future Browse Basin gas processing in the Kimberley Region. Read more...

Bunbury Berth 14A Expansion Project

Last updated: December 6, 2016

The proposal is to construct and operate a coal handling and export facility within the Bunbury Port Inner Harbour in the south-west region of Western Australia. Read more...

Bluewaters Power Station Expansion - Phase III and Phase IV (s46)

Last updated: May 1, 2015

The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal is further documented in Ministerial Statement 837 and EPA Report 1349 . This assessment deals with a request for a change to the Time... Read more...

Gorgon Gas Development Barrow Island Nature Reserve

Last updated: June 26, 2013

Chevron Australia Pty Ltd, as operator for the Gorgon Joint Venturers, proposes to extract, pipe, liquefy and export 10 million tonnes per annum of natural gas from the Greater Gorgon and Jansz gas fields using facilities offshore and on Barrow Island, Western Australia. Read more...

Anketell Point Port Development, Antonymyre, Shire of Roebourne

Last updated: January 30, 2013

The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...

Oakajee Deepwater Port (s46) [1950]

Last updated: January 22, 2013

The proposal is for the construction of a deepwater port. Inquiry under s46 regarding changing condition 9 of Ministerial Statement 469 . Read more...

Port Hedland Outer Harbour Development

Last updated: February 28, 2012

The proposal is to construct and operate the Outer Harbour Development which includes landside and marine infrastructure for the handling and export of iron ore from BHPBIO’s operations. The Boodarie stockyard infrastructure will supply an overland conveyor to a transfer pad located to the west of the existing Finucane Island facilities. A piled jetty will transfer ore material to the ship loaders located at the piled wharf. Read more...

Bluewaters Power Station Expansion - Phase III and Phase IV

Last updated: January 20, 2011

The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal also involves the construction and operation of an approximately 63 kilometre long wastewater discharge pipeline following the same... Read more...

Oakajee deepwater port, Oakajee, Shire of Chapman Valley

Last updated: December 1, 2009

The proposal is to construct a deepwater port to service fully loaded Panamax sized vessels (65 000 DWT) at Oakajee, approximately 23 kilometres north of Geraldton. Three site locations (north, south and central) and two different design options (inshore and off-shore) were considered in developing the proposal. The design option favoured by the proponent is an in-shore port design at the northern sector. The port study area is approximately 23 kilometres north of Geraldton. The port will... Read more...

Alkimos Wastewater Treatment Plant Site B

Last updated: November 13, 2007

This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors and principles relevant to the proposal by the Water Corporation to construct, operate and maintain a new Wastewater Treatment Plant (WWTP) and ocean outfall at Alkimos. The proposal is to develop the plant in stages up to an operational capacity of 160ML/day beyond 2050. There are two proposed sites for the WWTP, Site A and Site B... Read more...

Perth Metropolitan Desalination Proposal

Last updated: May 26, 2003

The proposal involves the construction and operation of a 30 GL desalination plant at one of two locations in the Kwinana Industrial Area. The alternative sites are at the Kwinana Power Station (KPS) or on the corner of Patterson and Office Roads, East Rockingham. Read more...

Hope Downs Iron Ore Project - Rail and Port Facility, Pilbara

Last updated: December 6, 2002

Proposal by Hope Downs Management Services Pty Ltd (hereafter referred to as HDMS) to construct a rail line and port facilities to support the development of an iron-ore mine, based on the Hope 1 Deposit. Read more...

Expansion of alumina production from 2.0 million tonnes per annum to 3.5 million tonnes per annum at Worsley refinery, and associated bauxite mining activities at Boddington

Last updated: July 2, 1996

The proposal is to expand alumina production from 2.0 million tonnes per annum to 3.5 million tonnes per annum at the Worsley Alumina Refinery, Collie, and undertake associated bauxite mining activities at Boddington. Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
+618 6364 7000
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2022 Government of Western Australia. All rights reserved.