This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 25, 2024
Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. The EPA considered the Study of the Cumulative Impacts of Air Emissions in the Murujuga Airshed in its assessment of the Perdaman Urea Project. Read more...Last updated: November 25, 2024
The construction of facilities for the development of the Pluto Gas Field on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on the Burrup Peninsula. Extensive dredging will be undertaken adjacent to the export facility. Read more...Last updated: August 2, 2024
The Proposal will use combined onshore wind and solar energy of approximately 5.2 gigawatt (GW) capacity to produce green hydrogen which will be converted to an estimated 2 Million tonnes per annum (Mtpa) of green ammonia for export to emerging green energy markets. The Proposal is located within the Shire of Northampton, Western Australia (WA), approximately 20 km north of Kalbarri. The Proposal comprises the following major components: a wind and solar farm with a combined installed capacity... Read more...Last updated: April 24, 2024
The construction, operation and maintenance of a nominal 320 megawatt combined cycle base load power plant at Kwinana, as documented in schedule 1 of the ministerial statement. Read more...Last updated: March 7, 2024
The proposal is to expand CSBP's Kwinana Ammonium Nitrate Production Facility (ANPF) by incorporating additional components into the existing facility and re-engineering (debottlenecking) some existing components in order to increase ammonium nitrate production capacity from 520,000 tpa to 936,000 tpa. Read more...Last updated: February 5, 2024
Province Resources Ltd propose to use combined onshore wind and solar energy to produce green hydrogen and ammonia for export to the green energy market. The proposal is distributed across 3 distinct locations within the Shire of Carnarvon, Western Australia. The proposal will comprise the following major elements: • up to 945 ha (6.8 GW) of wind turbines and up to 10,000 ha of solar arrays (5.2 GW) • a new multiuser port facility with a material offloading facility and export terminal •... Read more...Last updated: November 27, 2023
Woodside Energy Ltd has provided a combined document that relates to both its Commonwealth referral (Environment Protection and Biodiversity Act 1999) and State referral (Environmental Protection Act 1986). The component within State Waters includes drilling and completion, installation, commissioning, operation, well repair and workover and decommissioning of subsea wells and associated infrastructure located in Western Australian State waters, to extract hydrocarbons from the Torosa reservoir... Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 in response to a request to change condition 3 - Time Limit for Proposal Implementation of Ministerial Statement 891 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 regarding amending the conditions of Ministerial Statement 858 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: June 19, 2023
Woodside Energy Technologies Pty Ltd propose to construct and operate H2Perth, a domestic and export scale hydrogen and ammonia production facility, located approximately 40 km south of Perth. The proposal is to be located primarily within the Rockingham Industrial Zone (RIZ) in the City of Rockingham, with elements also located within the City of Kwinana and on the multi-user Kwinana Bulk Jetty. The proposal would produce approximately 3250 megawatts of gaseous hydrogen and approximately 3.25... Read more...Last updated: June 7, 2023
The Ridley Magnetite Project (the Proposal) is located approximately 57 km east of Port Hedland. The proposal is located within a 14,181 ha Development Envelope with an indicative disturbance footprint of 7,406 ha. The proposal is for the mining and processing of iron ore to produce 3 Million tonnes per annum (Mtpa) of magnetite concentrate for export under Stage 1, with an increase to 16.5 Mtpa under Stage 2. The proposal includes a single pit (below water table), run-of-mine pad, concentrate... Read more...Last updated: July 21, 2022
Ongoing operation of the North West Shelf Project to enable the long-term processing of third party gas and fluids and North West Shelf Joint Venture field resources through the North West Shelf Project facilities until around 2070. Read more...Last updated: September 1, 2021
The proposal is for the construction and operation of a gas processing plant, onshore supply gas pipeline, onshore sales gas pipeline, and horizontal directionally drilled shore crossing. Read more...Last updated: June 9, 2021
VBX Limited propose to develop a bauxite mine located approximately 15 km west of the town of Kalumburu in the Kimberley. The proposal involves the mining of bauxite in the Kimberley and the use of a conveyor to transport processed ore to a barge-loading facility in Napier Broome Sound, and then trans-shipping of ore. Read more...Last updated: June 24, 2020
Inquiry under Section 46(3) of the, Environmental Protection Act 1986, (EP Act) on CSBP Limited’s (CSBP) proposal to debottleneck their Ammonia Plant from 650 to 745 tonnes per day (tpd). Read more...Last updated: June 18, 2020
Inquiry under s46 into changing the conditions (extension of time limit for proposal implementation) of Ministerial Statements 469, 774, 815 and 927. Read more...Last updated: May 18, 2020
Changes to condition 2 (Proponent Commitments), condition 4 (Compliance Audit and Performance Review), condition 5 (Decommissioning Plan), condition 6, (Review of Options for the Transport of Solid Sodium Cyanide), condition 7 (Transport of Solid Sodium Cyanide), condition 8 (Transport of Liquid Sodium Cyanide), condition 9 (Noise Management), condition 10 (Emissions Verification) and condition 11 (Cyanide Monitoring). Read more...Last updated: November 25, 2019
The Western Australian Water Corporation is proposing to construct the Perth Seawater Desalination Plant 2 (PSDP 2) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The PSDP2 Proposal will be located within the Kwinana Industrial Area, approximately 38 km south of the Perth Metropolitan Area, on Lot 1864, Riseley Road in Naval Base. PSDP2 will be developed in two stages (each with a... Read more...Last updated: May 23, 2019
Inquiry under s46 into the request for a number of substantial changes to the Ravensthorpe Nickel Project, located approximately 35 km east of Ravensthorpe, the subject of Ministerial Statement 509 . In summary, the proposed changes include: mining of additional ore reserves contained within the Shoemaker-Levy and Hale-Bopp deposits and a resulting increase in clearing within the Bandalup Corridor; changes to the processing of ore and the final product: a) deletion of nickel electrowinning,... Read more...