This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 21, 2015
The proposal is to upgrade the Pinjarra Alumina Refinery. The proposal involves an upgrading of the seed filtration facility to improve its efficiency in order to increase the alumina production by approximately 17% to approximately 4.2 million tonnes per annum. This will require an increase in the bauxite mining rate at Alcoa’s Huntly bauxite mine and additional bauxite grinding, slurry storage and calcination facilities. Read more...Last updated: August 7, 2015
The Minister for Environment requested the EPA inquire into the matter of changing the implementation conditions relating to the Orebody 18 Iron Ore Mine proposal, particularly the matter of setting a condition on the proposal that would require environmental offsets for the clearing of native vegetation. Inquiry under s46 relating to Ministerial Statement 439 and EPA Report 840 . Read more...Last updated: August 5, 2015
The proposal is to construct and operate an ammonia plant on the Burrup Peninsula, approximately 1300 kilometres north of Perth. The selected project site is located in the King Bay-Hearson Cove Industrial Area and is approximately 6 and 10 kilometres from the towns of Dampier and Karratha respectively. The site covers an area of about 72 hectares and the actual plant footprint and infrastructure (including a thermal desalination plant) will occupy an area of approximately 20 hectares. Read more...Last updated: May 1, 2015
The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal is further documented in Ministerial Statement 837 and EPA Report 1349 . This assessment deals with a request for a change to the Time... Read more...Last updated: April 30, 2015
To expand the liquefied natural gas (LNG) production capacity of the existing proposal from 15 million tonnes per annum (Mtpa) to 20 Mtpa (nominal). Read more...Last updated: March 4, 2015
The proposal is for the construction and operation the Kintyre uranium project. The proposal includes the open cut mining of uranium ore, processing, and the transport of uranium ore concentrate to the Port of Adelaide. The project is located 260km north-east of Newman in the East Pilbara region of Western Australia. Read more...Last updated: February 26, 2015
The Minister for Environment has requested that the EPA inquire into and report on the matter of changing the implementation conditions relating to Ministerial Statement 905 in order to: extend the time limit on shipments of lead carbonate through Fremantle Port (condition 3A); and reduce the amount of the financial assurance required and allow the release and reinstatement of the financial assurance in the event operations are suspended (condition 18). Read more...Last updated: January 20, 2015
To build and operate a Waste to Energy and Materials Recovery Facility on Lot 1 Office Road, 3 kilometres north-east of Rockingham in the Rockingham Industrial Zone. Read more...