This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 19, 1997
The proposal is to manage an additional 67 ,500m 3 of contaminated material as part of the rehabilitation of former industrial land at McCabe Street, Mosman Park . Clean-up of this industrial land commenced in 1995 and has been subject to three previous assessments (EPA Bulletins 324, 699 and 807). The proponents are seeking to amend the existing conditions of approval ( Ministerial Statement 338 ) under Section 46 of the, Environmental Protection Act 1986, to allow for disposal of the... Read more...Last updated: December 12, 1997
The proposal is to establish the Geraldton Steel Plant (GSP) at Oakajee, 23km north of Geraldton. The GSP will be located within the planned Oakajee Industrial Estate in the Shire of Chapman Valley. The proposal will consist of the following main components: a pellet plant in which the majority of iron ore is converted to pellets suitable for direct reduction; two direct reduction plants for the reduction of pelletised iron ore to direct reduced iron; three electric arc furnaces and tlu·ee... Read more...Last updated: November 21, 1997
The proposal is to establish Class IV waste disposal cells at the proponent's existing Red Hill Waste Disposal Facility. These waste cells would provide for the disposal of low hazard wastes, including contaminated soils and household hazardous wastes, within the Perth metropolitan area. The facility is located approximately 12 km north east of Midland on Toodyay Road, Red Hill. Read more...Last updated: August 28, 1997
The proposal is for a staged development of a 120 hectare prawn farm at Heron Point, approximately 35 kilometres south of Exmouth in Exmouth Gulf. Read more...Last updated: July 15, 1997
Main Roads of Western Australia has proposed to build further portions of the Roe Highway from Welshpool Road, Beckenham to South Street, Canning Vale. Main Roads has indicated that Roe Highway will provide access to areas of manufacturing concentration and access to the termini of National Highways, airports, ports, freight forwarding centres and major rail heads. In summary, Roe Highway along with Reid and Tonkin Highways, will join other arterial roads to provide easy access to these... Read more...Last updated: June 30, 1997
The initial proposal by Worsley to develop the Boddington Gold Mine approximately 12km north-west of the town of Boddington was the subject of an EPA evaluation in 1985 (EPA 1985). An Environmental Management Programme was prepared and submitted in 1987 and the mine was commissioned in July 1987. Since that time environmental approvals have been given by the Minister for the Environment for two expansions of throughput, an additional water supply reservoir, the mining of basement and supergene... Read more...Last updated: June 30, 1997
The proposal is to increase the production capacity of Tiwest's titanium dioxide plant at Kwinana. The proposal is to modify/expand the existing plant to allow an increase in production capacity from 80,000 tonne per annum (tpa) to 180,00 tpa of titanium dioxide pigment in three notional stages: Stage I: increase to 120,000 tpa, Stage 2: increase to 165,000 tpa and Stage 3: increase to nominally 180,000 tpa. The first and second stages of the expansion wilI require major modifications to... Read more...Last updated: May 19, 1997
The proposal is to to expand NufarmCoogee Pty Ltd's Chlor-alkali Plant at Kwinana to allow an increase in chlorine gas production to 42,000 tonnes per annum (tpa) through the installation of a new electrolysis processing circuit. Storage of chlorine held on site will rise from a nominal 50 tonnes to 150 tonnes. Read more...Last updated: December 7, 1996
The main components of the proposal are: a Conservation and Foreshore Reserve of approximately 23.9ha along the Mandurah Channel frontage of the development site; approximately 500 single residential waterside lots (R 15 and R20) established along the margins of 33ha of canal waterways, which will be linked with the existing canal system within the Port Mandurah Stage 1 development and the Mandurah Channel; two areas of communal (group) housing development (R 40) covering 2. 7ha and providing... Read more...Last updated: November 6, 1996
The proposal is to dredge two channels to connect the Swan River with an internal artificial water body. Construction of the channel will involve: dredging of one 15m wide, 1 m deep channel through the System 6 area and near shore sandbars at the northern end of the wetland; the excavation of a 55m wide channel to -2.5m AHD, through the southern end of the tip site; plus the dredging of a 320m long, 55m wide navigation channel to -2.5m AHD through river shallows to connect with the main deep... Read more...Last updated: October 22, 1996
The proposal is to develop a nickel/cobalt ore mining and processing operation 50km north-west of Kalgoorlie and 9km east of Ora Banda. Read more...Last updated: October 22, 1996
The proposal is to develop the Bulong Nickel Cobalt Laterite Project. The proposed nickel/cobalt ore mining and processing operation is located approximately 30km east of Kalgoorlie, in Western Australia. The project involves the establishment of open cut mine pits, a processing plant and associated infrastructure. The project will produce refined products of nickel and cobalt. Read more...Last updated: June 6, 1996
The proposed nickel/cobalt ore mining and processing operation is located near the former gold mining centre of Murrin Murrin, approximately 60km east of Leonora, in Western Australia. The project involves the establishment of open cut mine pits, a processing plant and associated infrastructure. The project will produce refined products of nickel and cobalt as well as an ammonium sulphate by-product. Read more...Last updated: May 8, 1996
The proposal is to develop an upgraded tailings storage facility (TSF) at the Mt Keith nickel mine, located approximately 100 kilometres north of Leinster in the north-eastern Goldfields region of Western Australia Mining. Processing of nickel ore commenced at Mt Keith in 1994. To date, two conventional paddock storage type tailings cells have been used to store tailings, and the proponent has approval to construct an additional two cells. In 1990, a feasibility study into centralised thickened... Read more...Last updated: April 9, 1996
The proponent, Tiwest Joint Venture (Tiwest), seeks an amendment to the environmental conditions of Ministerial Statement 59 under Section 46 of the, Environmental Protection Act 1986, , to allow the synthetic rutile plant at Chandala an increase in nameplate production from 130,000 to 200,000 tonnes per annum (tpa) of synthetic rutile. The plant was originally assessed by the Environmental Protection Authority (EPA) in December 1988 and was approved by the Minister for the Environment to build... Read more...Last updated: March 26, 1996
The proposal is to construct and operate a Direct Reduction/Hot Briquetted Iron plant near Cape Lambert in the Pilbara region of Western Australia. The proposed plant will utilise conventional and commercially proven ore concentration, pelletising and gas-based shaft furnace direct reduction technologies to convert Pilbara iron ore (fines and lump) into HBI. The production capacity of the plant is expected to be 3.6 million tonnes per year (Mtpa) of HBI. The project may be developed in stages... Read more...Last updated: March 15, 1996
The proposal is to place contaminated materials into an enlarged portion of an engineered containment cell located onsite at McCabe Street in Mosman Park. The proponent wishes to increase the size of the containment cell and to amend the environmental conditions of Ministerial Statement 338 relating to removal of drainage outfalls at the site. This is the inquiry under s46 into the requested amendments. Read more...Last updated: August 3, 1995
The proposal is for a bypass road around the urban areas of Busselton. The selected alignment has the potential for significant impacts on the Broadwater wetland suite, which has been recommended for conservation of its natural values in Recommendation 1.2 of the System One report (Environmental Protection Authority, 1973). Currently, all major roads servicing the region converge on Busselton and pass through the centre of the town as Bussell Highway. The Shire of Busselton and Main Roads... Read more...Last updated: November 21, 1994
Multiplex Constructions Pty Ltd are proposing a major residential development intended to provide some 3,650 residential lots on 495 ha of land located at Egerton, about 20km from Perth in the North East Corridor. Read more...Last updated: October 25, 1994
An alignment for the Perth-Darwin National Highway from Reid Highway to Muchea and a future public transport corridor have been included by the State Planning Commission in a major amendment to the Metropolitan Region Scheme for the North East Metropolitan Corridor (Amendment No. 950/33). The amendment proposes to reserve land necessary to accommodate the future highway and an adjacent public transit corridor. In view of the environmental issues associated with the highway proposal, the... Read more...