This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: January 4, 2021
Hamersley Iron Pty. Limited (a wholly -owned subsidiary of Rio Tinto) proposes the development of a major iron ore mining operation in the central Pilbara region of Western Australia. The development will be centered around its Koodaideri deposits, located 110 kilometres west-north-west of Newman. The Proposal will involve the construction and operation of a greenfields mine and associated infrastructure. Mining will consist of open pits and supporting infrastructure, including a 167 kilometre... Read more...Last updated: January 4, 2021
Hamersley Iron Pty Limited propose to develop above and below water table iron ore deposits and associated infrastructure at Western Turner Syncline. The proposal also includes an infrastructure corridor connecting the mining operation to the existing Tom Price mine ore-processing facilities. Surplus water from mining below water table would be managed by use on site and controlled discharge to the environment. Clearing of up to 750 ha would be required. The proposal is located 20 km west of... Read more...Last updated: October 12, 2020
The Public Transport Authority (PTA) proposes to extend the existing Joondalup railway line by 7.3 kilometres from Butler Station to the suburb of Eglinton in the City of Wanneroo. The proposal is to construct and operate the rail extension and includes two new intermodal (rail, bus, ‘park and ride’, ‘kiss and ride’, walk and cycle) transit stations at Alkimos and Eglinton. The PTA will operate train services between Perth and Eglinton Stations and bus services from the Alkimos and Eglinton... Read more...Last updated: October 5, 2020
The proposal is to develop and operate an iron ore mine on the Blacksmith tenement located approximately 70 km north-west of Tom Price in the Pilbara region of Western Australia. Read more...Last updated: October 2, 2020
The proposal involves the development and operation of the Hope Downs 4 Iron Ore Mine (HD4), located in the Pilbara region in the shire of East Pilbara. It includes the development and operation of an above and below the water table greenfields iron ore mine and associated infrastructure. Ore from the HD4 proposal would be transported via a new railway to existing rail infrastructure near the existing Hope Downs 1 Iron Ore Mine then to port facilities on the coast. The mine would operate... Read more...Last updated: September 30, 2020
Proposal to mine iron ore from the Stage 2 project area on the southern slopes of the Chichester Range and develop a remote borefield and pipeline by Roy Hill Iron Ore Pty Ltd (RHIO). Read more...Last updated: September 16, 2020
BHP Billiton Nickel West (BHPB) proposes to develop the Mt Keith Satellite Project (the proposal), to the existing Mount Keith Mining Operations. The proposal is located approximately 80 km north of Leinster in the Shire of Leonora. The proposal includes clearing of up to 842 hectares of native vegetation (which is also fauna habitat) for two open pits, a Waste Rock Landform and a transport corridor, with minor ancillary infrastructure to support the mining process. Read more...Last updated: August 6, 2020
Section 46 change to conditions - Inquire into the suitability of the implementation conditions and whether any of them should be changed. Read more...Last updated: July 21, 2020
ACH Minerals proposes to develop the Kundip Mine Site located approximately 17 km south-east of Ravensthorpe in the Shire of Ravensthorpe. The proposal involves the development and operation of a gold and copper mine including open cut and underground mining, processing facilities, waste rock landforms, a tailings storage facility and associated infrastructure. The project will have an 8 year mine life and a disturbance area of 244.7 hectares including 197.8 hectares of native vegetation within... Read more...Last updated: July 9, 2020
Robe River Mining Co. Pty Limited (the proponent) proposes to develop the Mesa H deposit to sustain its iron ore production operations within the Robe Valley, Pilbara. The proposal is located approximately 16 km south west of Pannawonica. The proposal would include a total disturbance of 2,200 hectares to develop above and below water table open cut iron ore pits and associated infrastructure, including water management infrastructure. The proposal is located adjacent to the existing Mesa J... Read more...Last updated: June 26, 2020
The proposal is for the development and operation of the Parker Range Project, located in the Mount Caudan section of the Parker Range within the Shire of Yilgarn. It includes the development and operation of an above and below the watertable greenfields iron ore mine and associated infrastructure. An existing gazetted road (Parker Range Road) runs across the ore body. A gazetted bypass road would be required around the proposed mine site requiring approximately 10 ha of clearing. Ore from the... Read more...Last updated: June 3, 2020
Reward Minerals propose to develop the Lake Disappointment Potash Project (located approximately 320 km east of Newman). The proposal is to abstract brine from sediments and use solar evaporation ponds on the surface of the lake to create the potash product. The proposal would disturb 7,250 ha of land which includes 437 ha of vegetation, with the remainder of disturbance to the surface of Lake Disappointment. Read more...Last updated: May 5, 2020
The proposal is to develop an iron ore mine located approximately 68 kilometres south-east of Yalgoo and 30 kilometres north-east of the Greater Karara Iron Ore Project in the Shire of Yalgoo. Read more...Last updated: April 28, 2020
To develop and operate an iron ore mine, processing facilities and supporting infrastructure, 45 km south-south-east of Pannawonica in the Shire of Ashburton, and a 176 km haul road from the mine site to the customer delivery point near Cape Preston. Read more...Last updated: March 18, 2020
St Ives Gold Mining Company Pty Limited proposes to expand the existing open-cut and underground gold mining developments with 2,061 hectares (ha) of disturbance. The proposal is located in Lake Lefroy approximately 20 kilometres south east of Kambalda (Shire of Coolgardie). The revised proposal would include an additional disturbance of 5000 ha: additional lake-based disturbance of up to 2,000 ha; and additional land-based disturbance of up to 3,000 ha. Read more...Last updated: January 15, 2020
The proposal is to revise the Mining Area C operation (located approximately 90km WNW of Newman) to include a new satellite ore body which is located approximately 8 km to the south of the existing approved Mining Area C operations. The revised proposal would require the additional clearing of approximately 19,850 hectares of vegetation and mining below the water table. Read more...Last updated: November 26, 2019
The Proposal is located within the Pilbara Interim Biogeographic Regionalisation for Australia (IBRA) region and is located within the Fortescue and Hamersley IBRA subregions. The Approved Project (authorised by Ministerial Statement 933 , 1 February 2013) is an above the water table open cut mine and associated infrastructure, located on mining tenement M470/1439. This proposal is to mine below the water table. Read more...Last updated: October 14, 2019
The proposal involves the excavation and processing of a low-grade (2.7%) heavy mineral sands deposit near Keysbrook to produce 920,000 tonnes of Heavy Mineral Concentrate (HMC) over 8 years. An area of 30 hectares (ha) would be progressively mined at any time. Topsoil would be removed and stockpiled for use in rehabilitation. The ore would be excavated and unloaded into a dump hopper located on the pit floor. The ore would be conveyed to a screening plant where oversize material would be... Read more...Last updated: October 1, 2019
The proposal is for the works and operation of a wastewater treatment plant (WWTP) and woodlot reuse scheme for the first three years. This will enable monitoring and evaluation to be undertaken to determine a longer term strategy for development and operation of the scheme. The proposed works and operation for the first three years form part of planned Stage 1 of the scheme, which will extend to the year 2010. A further two stages (extending to 2040) are planned for the future. Read more...