This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: October 29, 1999
Proposal to redevelop the Harvey and Stirling Reservoir system in order to divert an additional quantity of water from the Harvey Basin for the Perth Metropolitan Water Supply Scheme (PMWSS). The proposal involves the construction of a new pipeline from Harris Sam to Stirling Reservoir to enable transfer of water. Read more...Last updated: June 4, 1999
The Western Australian Planning Commission proposes to rezone the majority of the Forrestfield Marshalling Yards to "Industrial" from the current Metropolitan Region Scheme reservation of "Railways" and to relocate the "Important Regional Road" (Dundas Road) to a site within the Forrestfield Marshalling Yards. Read more...Last updated: April 27, 1999
The proposal is to subdivide lots 5,8,9 and 10 Haigh Road (Garden Street) and lots 15 and 16 Shreeve Road, Canning Vale (City of Gosnells) for residential purposes. The subdivision has a gross area of approximately 12 hectares. It includes approximately 150 single residential lots ranging in size from around 480 square metres to around 815 square metres, several duplex size lots, public open space and roads. Read more...Last updated: April 27, 1999
The proposal is to subdivide for residential purposes Lot 11 Bridge road and Lot 6 Haigh Road, Canning Vale. The subdivision has a gross area of approximately 3.2 hectares. It includes approximately 27 single residential lots ranging in size from around 540 square metres, several duplex size lots, public open space and roads. Read more...Last updated: February 17, 1999
The scope and objectives of the East Gnangara Environmental Water Provisions Plan encompassed a number of factors, including: identification of ecosystem components with high environmental and social values, determination of environmental water requirements (EWRs) and EWPs for each ecosystem component, determination of quantity of water available for public and private groundwater abstraction, computer modelling of differing abstraction scenarios to model likely impact of groundwater... Read more...