This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: January 28, 2019
The Water Corporation is proposing to divert wastewater from the Bullsbrook Waste Water Treatment Plant (WWTP) to the Beenyup WWTP, 20 km away. A new pipeline will be installed predominantly along the Great Northern Highway to the Millhouse Road Pump Station in Ellenbrook. The pipeline alignment traverses Main Roads WA and local government road reserves. The alignment is adjacent to Ellen Brook Nature Reserve, several Bush Forever Sites and intersects Bush Forever site 300 at Ellen Brook,... Read more...Last updated: January 17, 2019
The proposal is to undertake a trial of the SMART drumlines as a non-lethal shark hazard mitigation tool in Western Australian conditions. In doing so, it is proposed to catch, tag, relocate and release white sharks. The proposal is located in waters offshore from Gracetown (offshore from Shire of Augusta Margaret River), in the Ngari Capes Marine Park. The duration of the trial will be for 15 months. Where possible, the proposed WA SMART drumline project has been aligned with the NSW SMART... Read more...Last updated: January 11, 2019
City of Karratha are proposing a trial which involves a total of 7,000m 3 of sand renourishment at Dampier Palms Beach using clean coarse sand from the Extraction Area, south of Hampton Oval. Placement of the sand will occur on the beachface, mostly between mean sea level and highest astronomical tide, at two sites either side of a minor rock control at Dampier Palms Beach. The renourishment is proposed to occur in two stages, with: An initial trial renourishment of nominally 3,000m³ based on... Read more...