This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 30, 2016
The Site is approximately 16.9 ha and is proposed to be remediated and regenerated. It was previously mined for building and construction sands and was later used as a licensed “inert” landfill. It has been reported that non-approved waste streams were disposed of at the Site. In October 2010 following a compliance inspection the Site was classified “Contaminated – Remediation Required” under Section 13 of the Contaminated Sites Act 2003 The proponent is proposing to redevelop the area by... Read more...Last updated: November 29, 2016
The proponent, Iron Bridge Operations Pty Ltd (a Joint Venture between FMG Iron Bridge Pty Ltd and Formosa Steel IB Pty Ltd), proposes to construct and operate new infrastructure within the existing Herb Elliot Port Facility, Fortescue Metals Group, Port Hedland. The proposal, Iron Bridge Port Facility, is designed to accept 10 Mtpa of magnetite concentrate slurry from the North Star Magnetite Project, whereupon the slurry would be dewatered and the concentrate product stored within a shed that... Read more...Last updated: September 19, 2016
The proposal is to develop a Waste Transfer and Resource Recovery Facility approximately 10 kilometres from Perth at 25 Jackson Street, Bassendean in the Bassendean Industrial Area. The proposal would include: a Materials Recovery Facility (MRF) for the processing of co-mingled recyclables; acceptance, short term stockpiling and baling of source separated recycled commodities; glass crusher for management of waste glass from the MRF; a metal shredder for the processing of metal commodities; a... Read more...Last updated: July 18, 2016
Keppel Holdings proposes the development and operation of a mobile concrete batching plant at Lot 105 (No. 2) Clune Street, Bassendean. The proposal site is located within the Bassendean Industrial Area. The proposal includes the construction of buildings and associated car and truck parking. Read more...