This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 24, 2007
The proposed Peel Deviation project involves the construction of 52.1 km of dual carriageway freeway-standard highway from the future freeway link north of Mandurah to the existing Perth-Bunbury Highway (Old Coast Road) at Lake Clifton. Read more...Last updated: August 9, 2007
The installation of a wet compression system and associated infrastructure within the existing Kemerton Power Station, and the construction of evaporation ponds and a water pipeline to deliver water from an existing offtake located about 4 kilometres to the east. The wet compression system will enable the power station to generate additional power at ambient temperatures above International Standards Organisation conditions by eliminating the sensitivity of the installed gas turbines to ambient... Read more...Last updated: July 12, 2007
The proposal is for the construction and operation of an ethanol bio-refinery on a 19 hectare site in the Kwinana Industrial Area. Read more...Last updated: June 6, 2007
The remediation of approximately 17 hectares of land, known as the Helena East Precinct and the Southern Embankment located centrally in the former Railway Workshops area, which includes relocation of contaminated soil to an area immediately east of the Police Operations Support Facility known as the Meat Industry Association Containment Cell. Read more...Last updated: April 22, 2007
The proposal is to raise the application rate for total nitrogen from 106 to 150 kg/ha/y to the area of irrigated trees on the tree farm. Inquiry under s46 into changes to Ministerial Statement 287 . The original proposal, assessed in 1992, calculated nitrogen loadings in the wastewater applied to the grass bays and the irrigated trees at the wastewater disposal site. The projected loadings were based on the wastewater treatment plant being upgraded to reduce nitrogen concentrations in the... Read more...Last updated: November 17, 2006
The proposal is for the remaining life of the mine (50+ years), located west of Jimblebar Creek on Mining Lease 266SA. It entails increasing the iron ore production rate at the mine from 8 million tonnes per annum (Mtpa) to approximately 12Mtpa, and the mining of the currently undeveloped deposits on either side of the existing operation, including both in-situ hard rock and detrital ores. Approximately 600 million tonnes of Marra Mamba iron ore have been identified within the mining envelope.... Read more...Last updated: October 31, 2006
The proposal involves the construction and operation of an approximately 2.8 million tonnes per annum mineral sands mine and concentrator plant on part Swan Location 128, 354 & 508, Lot 2; part Swan Location 128 & 340, Lot 3; part Swan Location 128, 354, 355, 506, Lot 9; Swan Location 506; portion of each of Swan Locations 354 & 508, Lot 1 and part Swan Location 511 & 536, Lot 7, near the intersection of Brand Highway and Dewar Road, approximately 2.5 kilometres north-west of... Read more...Last updated: June 30, 2006
The proposal is to develop a mineral sand mine one kilometre north of the township of Waroona, which is approximately 140 km south of Perth. The area for assessment has been identified as Mining Tenements M70/735, M70/797 and M70/1089. Read more...Last updated: June 29, 2006
The proponent proposes to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are nine separate looping sections proposed from CS 1 south of Karratha, to CS 9, north of Gingin. Looping is a process of duplicating an existing pipeline between compressor stations for a certain distance. Once the specified distance is reached, it then ties back to the parallel pipeline. This design... Read more...Last updated: June 23, 2006
Proposal to develop the Wallaby Gold Mine. Located on the shore of Lake Carey, a naturally occurring saline wetland approximately 27 km south-west of Laverton. The Wallaby Gold Mine Project includes development of an open cut gold mine, waste rock dumps and infrastructure to support mining on the northern shoreline of the lake. Gold ore produced at the mine will be transported via overland conveyor to an existing processing plant with tailings placed in both an extended and a new tailings... Read more...Last updated: May 25, 2006
The proposal is for residential development on the East Clontarf site, approximately 18ha in size. The site is bounded by Manning Road, Centenary Avenue and the Canning River. It is zoned Urban in the Metropolitan Region Scheme (MRS) and Residential in the City of South Perth Town Planning Scheme. The foreshore area adjacent to the proposed development is identified for protection as Bush Forever site 333 and reserved for Parks and Recreation in the MRS. Read more...Last updated: March 28, 2006
The proposal is for the developing of mining operations at the areas of Trilogy and Kundip, construction of a haul road, construction and operation of a processing plant, and disposal of tailings at the RAV 8 site. Read more...Last updated: January 25, 2006
Main Roads Western Australia (MRWA), propose to construct an On-ramp from Abernethy Road to Tonkin Highway, Kewdale. This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations as required by Section 44 of the, Environmental Protection Act 1986, to the Minister for the Environment, on the environmental factors relevant to the proposal. Read more...Last updated: January 24, 2006
Proposal by BHP Billiton Iron Ore Pty Ltd (BHPBIO) to expand existing mining operations at Orebody 25 Mine (OB25), within mining lease (ML) 244SA. Read more...Last updated: December 28, 2005
The proposal is to construct and operate a 23-kilometre pipeline from Kwinana Junction, in Kwinana to Hopelands (between Punrak Road and Henderson Road). This proposal is known as the Southern Looping Project, and comprises loop 10. The proponent has also referred a proposal to construct and operate a 194-kilometre pipeline from Compressor Station 1 south of Karratha, to Compressor Station 9, north of Gingin. This proposal, known as the Northern Looping Project , and comprising loops 1 to 9,... Read more...Last updated: December 5, 2005
The proposal is to expand Hamersley Iron's iron ore operations at Dampier Port from 95 million tonnes per annum (Mtpa) to 120 Mtpa. The Hamersley Iron Dampier Port operations include rail and port facilities, rail maintenance workshops, a 120MW power station, laboratories and other service and administrative functions. The port operations are located at two terminals – Parker Point (PP) and East Intercourse Island (EII). The proposal is to increase the capacity of the Parker Point terminal... Read more...Last updated: October 17, 2005
The proposal is to construct and operate a 330MW capacity advanced sub-critical coal-fired power station (known as Collie B) at the Collie Power Station Site, immediately adjacent to the existing ‘Collie A’ Power Station. It will be an advanced sub-critical coal fired base-load generation facility with a nominal generating capacity of up to 330MW. The Collie B Power Station will supply electricity to Western Power for the South West Interconnected System (SWIS) under the SWIS Power Procurement... Read more...Last updated: September 21, 2005
CSBP currently produces approximately 235,000 tpa of ammonium nitrate at its Kwinana operations which are located within the Kwinana Industrial Area. This proposal is to expand the ammonium nitrate production capacity to approximately 580,000 tpa by debottlenecking and duplicating its existing facilities. The expansion includes: duplication and/or debottlenecking of the existing 500 tpd nitric acid plant; duplication and/or debottlenecking of the existing 635 tpd ammonium nitrate reaction plant... Read more...Last updated: August 31, 2005
The City of Gosnells proposes to amalgamate 23 individual lots within Campbell Estate totalling 49.32ha, then subdivide this into three lots to create: a ‘core’ conservation area incorporating significant high quality wetlands (6.9ha); a ‘buffer’ to the conservation area that will also provide some stormwater management (2.38ha); and a residential development area (34.7ha). The remaining 10.68ha, which is included in the Campbell Road Estate ODP is not part of this proposal. Read more...Last updated: June 13, 2005
Wesfarmers Energy Limited proposes to construct and operate the 300MW Collie B Power Station on a site directly adjacent to the existing Collie A Power Station and located approximately 10km east-north-east of Collie. It will be a supercritical coal-fired base-load generation facility with a nominal generating capacity of approximately 300MW. The Collie B Power Station will supply electricity to the South West Interconnected System (SWIS). Read more...