This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: February 2, 2022
The requested changes relate to condition 3 of Statement 1041 (as relevant to Statement 826) for an extension to the Time Limit of Authorisation for Proposal Implementation. Read more...Last updated: February 2, 2022
Conditions 6-12, 9-1 to 9-5 inclusive, and 12-1 to 12-8 inclusive of Ministerial Statement 873 are to be removed from the statement and conditions 9-1 to 9-5 inclusive and conditions 12-1 to 12-8 inclusive are to be transferred into a new ministerial statement. The change will facilitate the transfer of conditions relevant to the operation of port facilities from Chevron Australia Pty Ltd to the Pilbara Ports Authority via this new Ministerial Statement. Read more...Last updated: January 25, 2022
Dredging of approximately 3,900,000 cubic metres of material for two new berth pockets and extensions to the existing departure channel and swing basin at Harriet Point and Stanley Point; disposal of dredged material at dredged material management areas. Read more...Last updated: January 24, 2022
Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. The EPA considered the Study of the Cumulative Impacts of Air Emissions in the Murujuga Airshed in its assessment of the Perdaman Urea Project. Read more...Last updated: December 21, 2021
K plus S Salt Australia Pty Ltd is seeking approval to construct and operate a 3.5 million tonnes per annum (Mtpa) Solar Salt Project located approximately 40 km south-west of the township of Onslow, within the Shire of Ashburton. Read more...Last updated: November 30, 2021
WA Offshore Windfarm Pty Ltd is proposing the construction, operation and decommissioning of the Western Australian Offshore Windfarm project. The project will be located approximately 5.5 km off the coast between Preston Beach and Myalup and will have a generation capacity of up to 300 MW. The Project will comprise up to 37 offshore wind turbine generators (WTGs) with supporting offshore and onshore electrical assets to transfer energy generated by the windfarm to the existing electricity... Read more...Last updated: November 24, 2021
Mardie Minerals Pty Ltd proposes to develop a high volume salt and Sulphate of Potash project at Mardie, approximately 80 km south west of Karratha, in the Pilbara Region of Western Australia. The proposal would utilise seawater and evaporation to produce a concentrated salt product and other associated products., The proposal includes a seawater intake, evaporation ponds, processing plant, bitterns disposal pipeline and outfall, desalination plant, freshwater supply bores and associated... Read more...Last updated: October 25, 2021
Main Roads Western Australia (Main Roads) is proposing to build the Swan River Crossings (the Proposal) that includes the construction of new road and rail bridges, the upgrading of the existing rail bridge and the demolition of the existing Fremantle Traffic Bridge in Fremantle, Western Australia. The proposals location includes the Road and rail corridor along Queen Victoria Street, Fremantle from Tydeman Road in the north to Canning Highway south of the Swan River. And the eastern side of... Read more...Last updated: October 21, 2021
The proponent, Shark Bay Resources Pty Ltd, operates two solar salt fields and an associated port facility at Useless Loop in the Shark Bay area of Western Australia. The site is located approximately 25 kilometres west southwest of Denham. The proponent is proposing to undertake maintenance and capital dredging of up to 80,000 cubic metres from the entrance channel of the port and seabed levelling of 10,000 cubic metres in the berth pocket to restore navigable depths. The development envelopes... Read more...Last updated: September 1, 2021
The proposal is for the construction and operation of a gas processing plant, onshore supply gas pipeline, onshore sales gas pipeline, and horizontal directionally drilled shore crossing. Read more...Last updated: August 9, 2021
Leichhardt Industrials Pty Ltd (Leichhardt) is seeking to develop a salt production and export operation in the Cape Preston East area, approximately 55 kilometres (km) westsouth-west of Karratha in Western Australia (WA). The proposal will utilise seawater and evaporation to produce concentrated salt products for export. The proposal includes the development of a series of concentrator and crystalliser ponds, processing plant, product pipeline and offshore export facility (offshore pylon wharf... Read more...Last updated: July 15, 2021
Co-operative Bulk Handling Ltd (CBH) propose to develop a facility for the import and storage of dry (granular) and liquid urea ammonium nitrate (UAN) fertiliser products. The proposal consists of onshore and offshore components and is located adjacent and within the existing Rockingham Industrial Zone (RIZ). The offshore component will extend into the southern Cockburn Sound. The proposal involves the construction of a dedicated liquid (UAN) pipeline that will follow the alignment of the... Read more...Last updated: June 10, 2021
Delete conditions 8-4, 8-5, 8-6, 8-7 (Marine Wastewater Outfall) relating to the management of the marine wastewater outfall for the desalination plant. Amend condition 8-8 to remove reference to conditions 8-4 and 8-5. Read more...Last updated: June 9, 2021
VBX Limited propose to develop a bauxite mine located approximately 15 km west of the town of Kalumburu in the Kimberley. The proposal involves the mining of bauxite in the Kimberley and the use of a conveyor to transport processed ore to a barge-loading facility in Napier Broome Sound, and then trans-shipping of ore. Read more...Last updated: May 25, 2021
The proposal is to construct industrial infrastructure and a Southern Harbour in Jervoise Bay south of the Northern Harbour precinct and including the Marine support facility. Read more...Last updated: November 9, 2020
NW Interconnected Power Pty Ltd (the Proponent) is seeking to revise its approved proposal to develop the Asian Renewable Energy Hub. The proposal was previously referred under section 38 of the Environmental Protection Act 1986 (EP Act), assessed by the Environmental Protection Authority (EPA) at the level of Public Environmental Review (PER) (NW Interconnected Power 2019), and subsequently approved by the Western Australian Minister for Environment in October 2020. This referral is for ... Read more...Last updated: November 3, 2020
The construction, operation and maintenance of a nominal 320 megawatt combined cycle base load power plant at Kwinana, as documented in schedule 1 of the ministerial statement. Read more...Last updated: October 15, 2020
NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 644,600 ha development envelope, with a... Read more...Last updated: October 5, 2020
CMC proposes to construct and operate a barge loading/unloading facility (Derby barge facility) within the Port of Derby, immediately to the north of the existing Derby jetty. The proposal would require a total disturbance of 3.5 hectares(ha), which includes 1.66 ha of land reclamation and 1.84 ha harbour basin and dredging to a depth of -1.0 metre Australian Height Datum (AHD). The proposed facility would include a purpose-built barge loading/unloading facility, associated servicing (... Read more...