This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: January 25, 2023
FutureEnergy Australia is proposing to construct and operate a biorefinery processing plant to produce a renewable biodiesel. The proposed proposal is located on Lot 31 on Plan 404104, Narrogin, within the shire of Narrogin, Western Australia. The proposal includes a biorefinery plant, a feedstock receival area, woodchip drying beds, and supporting infrastructures. The biorefinery plant will utilize waste lignocellulose biomass as feedstock which will undergo pyrolysis followed by non-catalytic... Read more...Last updated: December 16, 2022
Project Haber Pty Ltd proposes to construct and operate a 1.4 million tonnes per annum (Mtpa) urea plant in East Arrowsmith (South Erregulla). The proposal is located approximately 280 km north of Perth and 45 km south east of Dongara, in the Shire of Three Springs. The urea plant comprises of an Air Separation Unit (ASU) producing nitrogen, oxygen and hydrogen for various processes; an ammonia synthesis unit; and a granulation and urea production unit. Supporting infrastructure includes gas... Read more...Last updated: November 24, 2022
Alcoa of Australia Limited is proposing to increase production at the Pinjarra Alumina Refinery (the refinery) and increase the rate of bauxite mining at the existing Huntly Mine within Mineral Lease 1SA (ML1SA) to supply 2.5 million tonnes per annum (Mtpa) bauxite, for export to third party customers. The Proposal comprises the following components: an increase in alumina production at the refinery by 5 percent, from 5.0 Mtpa to 5.25 Mtpa; A transition of the Huntly mine into the Myara North... Read more...Last updated: October 5, 2022
DevelopmentWA is seeking to develop the Kemerton Strategic Industrial Area (KSIA) for the purpose of industrial and infrastructure development as a strategic proposal. The KSIA is located within the Shire of Harvey, 17 kilometres north of Bunbury. The KSIA key characteristics are: Development of the Kemerton Strategic industry Zone (Industry Core) which is approximately 2,024 hectares (ha). There is an approximate 50-year time period for development. Ultimate land use proposed is to be heavy... Read more...Last updated: August 23, 2022
Australian Gold Reagents Pty Ltd propose to increase production at the existing Kwinana sodium cyanide liquid plant from 91,000 tonnes per annum (tpa) to a total of 110,000 tpa; and to increase production of solid sodium cyanide from 45,000 tpa up to 60,000 tpa. The proposal also includes connecting the two existing thermal combustion units to allow waste gas from either plant during down time to be directed through a combined header to the operational thermal combustion unit for effective... Read more...Last updated: August 4, 2022
Yara Pilbara Fertilisers Pty Ltd propose to modify the existing Pilbara Fertiliser project to include the development of a Renewable Hydrogen Plant and associated infrastructure. The proposal is located approximately 11 km north-west of Karratha in the Pilbara region of Western Australia. The proposal is adjacent to the National Heritage listed area and the Murujuga National Park. The proposal would include a total disturbance of 24.78 hectares. The proposal will result in reduction of... Read more...Last updated: June 7, 2022
DevelopmentWA proposes to subdivide Lot 40 (No. 217) Devlin Road, Wellesley (Shire of Harvey) into approximately 34 lots to facilitate future industrial development. Areas of the Marriott Road reserve (Lots 41 & 42) are also proposed to be cleared to facilitate the safe movement of vehicles to and from the site and for upgrading of electrical services. The proposal would include a total development envelope of 119 hectares, including proposed clearing of up to 27.1 hectares of native... Read more...Last updated: April 11, 2022
Change existing Condition 7 of Ministerial Statement 586 so that it is adequate with respect to avoiding, reducing, and offsetting greenhouse gas emissions. Read more...Last updated: March 15, 2022
The requested change relates to changing condition 9 in order to contemporise the condition with the Environmental Factor Guideline – Greenhouse Gas (GHG) Emissions (EPA 2020) Read more...Last updated: March 14, 2022
Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...Last updated: January 25, 2022
Dredging of approximately 3,900,000 cubic metres of material for two new berth pockets and extensions to the existing departure channel and swing basin at Harriet Point and Stanley Point; disposal of dredged material at dredged material management areas. Read more...Last updated: January 24, 2022
Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. The EPA considered the Study of the Cumulative Impacts of Air Emissions in the Murujuga Airshed in its assessment of the Perdaman Urea Project. Read more...Last updated: October 28, 2021
Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...Last updated: August 9, 2021
The original proposal is for mining of silica (quartzite) rock approximately 15 kilometres north of Moora on Mining Lease M70/191, and smelting to produce silicon, employing wood, charcoal, coal and the silica mined at Moora, in the Kemerton Industrial Area approximately 20 kilometres north of Bunbury in the Shire of Harvey. This revised proposal is for an increase from the approved three submerged electric arc furnaces to four submerged electric arc furnaces at the Kemerton site, and the... Read more...Last updated: July 15, 2021
Co-operative Bulk Handling Ltd (CBH) propose to develop a facility for the import and storage of dry (granular) and liquid urea ammonium nitrate (UAN) fertiliser products. The proposal consists of onshore and offshore components and is located adjacent and within the existing Rockingham Industrial Zone (RIZ). The offshore component will extend into the southern Cockburn Sound. The proposal involves the construction of a dedicated liquid (UAN) pipeline that will follow the alignment of the... Read more...Last updated: May 25, 2021
The proposal is to construct industrial infrastructure and a Southern Harbour in Jervoise Bay south of the Northern Harbour precinct and including the Marine support facility. Read more...Last updated: May 10, 2021
The Munglinup Graphite Project is located in the South Coast region of Western Australia, approximately 105km west of Esperance, 85km east of Ravensthorpe and 4km north on Munglinup. MRC Graphite Pty Ltd propose to extract graphite from up to six open pits. The proposal will also include a processing plant, tailings storage facility, waste rock landforms, and associated infrastructure. The proposal would include a total disturbance of 350 hectares. Read more...Last updated: February 1, 2021
Australian Potash Limited proposes to abstract brine resources to produce a sulfate of potash (SOP) product at the Lake Wells Potash Project. The proposal area is located on and adjacent to the Lake Wells Playa Lake system (salt lake terrain), approximately 160km north-northeast of Laverton in Western Australia. The proposal would include construction of an SOP processing plant, brine abstraction bores, evaporation ponds, raw water bore field, accommodation village and other associated... Read more...Last updated: November 30, 2020
Austral Bricks is proposing the redevelopment of the Cardup Brickworks, which includes the expansion of the existing factory, increasing the design capacity from 200,000 to 250,000 tonnes per annum. The site is located in the southern extremity of Byford. Additional ancillary improvements include the installation of a new baghouse scrubber and a new primary crusher located in the floor of the pit. The proposal would include: Expanding the capacity from 200,000 to 250,000 tonnes per annum; ... Read more...