Last updated: June 26, 2020
The proposal is for the development and operation of the Parker Range Project, located in the Mount Caudan section of the Parker Range within the Shire of Yilgarn. It includes the development and operation of an above and below the watertable greenfields iron ore mine and associated infrastructure. An existing gazetted road (Parker Range Road) runs across the ore body. A gazetted bypass road would be required around the proposed mine site requiring approximately 10 ha of clearing. Ore from the... Read more...Last updated: June 24, 2020
Inquiry under Section 46(3) of the, Environmental Protection Act 1986, (EP Act) on CSBP Limited’s (CSBP) proposal to debottleneck their Ammonia Plant from 650 to 745 tonnes per day (tpd). Read more...Last updated: June 22, 2020
Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. Read more...Last updated: June 18, 2020
Inquiry under s46 into changing the conditions (extension of time limit for proposal implementation) of Ministerial Statements 469, 774, 815 and 927. Read more...Last updated: June 10, 2020
The proposal is for the dewatering of up to 1 gigalitre per annum from the existing underground component of the Bellevue Gold Mine, to allow safe access for exploration drilling. This will occur on mining leases M36/24 and M36/25, 40km NW of Leinster. Read more...Last updated: June 3, 2020
UIL Energy Ltd proposes to conduct a 2D seismic survey within exploration permits 447, 488 and 489 near the town of Badgingarra (Shire of Dandaragan). The proposal would involve clearing of up to 24 hectares of native vegetation within a proposal area of 101,813 hectares. Clearing will occur within Badgingarra National Park, Wongonderrah and Twyata Nature Reserve, unallocated Crown Land, road reserves, and private properties. Read more...Last updated: June 3, 2020
Reward Minerals propose to develop the Lake Disappointment Potash Project (located approximately 320 km east of Newman). The proposal is to abstract brine from sediments and use solar evaporation ponds on the surface of the lake to create the potash product. The proposal would disturb 7,250 ha of land which includes 437 ha of vegetation, with the remainder of disturbance to the surface of Lake Disappointment. Read more...Last updated: May 29, 2020
Section 46 - request for a change to Environmental Conditions: Inquire into the commencement of Condition 26 (Reservoir Carbon Dioxide Injection System) of Ministerial Statement 800. Read more...Last updated: May 27, 2020
Hamersley Iron Pty Limited (the proponent) propose to develop the Greater Paraburdoo Iron Ore Hub. The proposal is an expansion of the existing operations at Paraburdoo and Eastern Range which is not subject to a Ministerial Statement issued under Part IV of the, Environmental Protection Act 1986, (EP Act). The proposal area is located approximately six kilometres south of the town of Paraburdoo in the Pilbara region of Western Australia. Existing operations at Paraburdoo and Eastern Range are... Read more...Last updated: May 27, 2020
Changes to conditions 3-1 and 3-2, time limit of authorisation of Ministerial Statement 985 in order to extend the Time Limit of Authorisation. Read more...Last updated: May 20, 2020
Venturex Resources Limited propose to develop the Sulphur Springs Zinc-Copper Project located approximately 144 kilometres (km) south-east of Port Hedland and 57 km west of Marble Bar. The project includes an open pit mine to extract the upper portion of the orebody and an underground mine to extract the lower portion of the orebody. The project has a disturbance footprint of 313.6 hectares (ha) within an 889.2 ha development envelope and consists of the following physical and operational... Read more...Last updated: May 18, 2020
Changes to condition 2 (Proponent Commitments), condition 4 (Compliance Audit and Performance Review), condition 5 (Decommissioning Plan), condition 6, (Review of Options for the Transport of Solid Sodium Cyanide), condition 7 (Transport of Solid Sodium Cyanide), condition 8 (Transport of Liquid Sodium Cyanide), condition 9 (Noise Management), condition 10 (Emissions Verification) and condition 11 (Cyanide Monitoring). Read more...Last updated: May 18, 2020
Change to condition 3 - Time limit for Proposal Implementation. Extension of time limit of 5 years to 15 June 2025, allowing time for project financing. Read more...Last updated: May 11, 2020
Consolidated Minerals Pty Ltd the proponent) propose to develop the Woodie Continued Operations Project. The proposal is an expansion of the existing Woodie Woodie Manganese Mine operations (Pilbara Manganese Pty Ltd, a wholly owned subsidiary of Consolidated Minerals Pty Ltd) which is not subject to a Ministerial Statement issued under Part IV of the Environmental Protection Act 1986 (EP Act). The proposal is located approximately 100 km east of Marble Bar and Nullagine and 400 km south east... Read more...Last updated: May 11, 2020
The purpose of the proposal aims to continue to catch, tag, relocate and release white sharks to better understand their movements following release. A range of tiger sharks and mako sharks will also be satellite and acoustic tagged as part of this proposal. This proposal is for the continuation of the SMART (Shark Management Alert in Real Time) drumline trial for an additional 12 months (until May 2021). The trial extension will provide additional data to assist in determining the... Read more...Last updated: May 8, 2020
The Western Australian Water Corporation is proposing to construct the Alkimos Seawater Desalination Plant (ASDP) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The ASDP Proposal will be located within the Alkimos Water Precinct (Lot 1050 Marmion Avenue), approximately 40 km north of the Perth, within the northwest corridor, north of Quinns Rock beach and south of Yanchep beach.... Read more...Last updated: May 6, 2020
Changes to conditions 8 (Stage 1 offsets) and 9 (Access to Stage 2 mining area) to allow full ground disturbance access to the Stage 2 mining area based on progress to date, and condition 10 (Stage 2 offsets) in terms of offsetting significant residual impact. Read more...Last updated: May 5, 2020
The proposal is to develop an iron ore mine located approximately 68 kilometres south-east of Yalgoo and 30 kilometres north-east of the Greater Karara Iron Ore Project in the Shire of Yalgoo. Read more...Last updated: May 5, 2020
Change Condition 3 to extend the time limit of authorisation for substantial commencement of the proposal Read more...