This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: May 7, 2008
Mr H J Hawke proposes to subdivide Lot 2 Ellenbrook Road, Bullsbrook, into 8 lots of approximately 2 hectares (ha) each and a service road, for rural residential purposes. The land, which is located within the Environmental Protection (Western Swamp Tortoise) Policy area, covers an area of approximately 17.15 ha and is adjacent to the Ellen Brook. A Conservation Category Wetland (CCW)s and Bush Forever Site 296 extend along and into the eastern boundary of the property. Read more...Last updated: May 25, 2006
The proposal is for residential development on the East Clontarf site, approximately 18ha in size. The site is bounded by Manning Road, Centenary Avenue and the Canning River. It is zoned Urban in the Metropolitan Region Scheme (MRS) and Residential in the City of South Perth Town Planning Scheme. The foreshore area adjacent to the proposed development is identified for protection as Bush Forever site 333 and reserved for Parks and Recreation in the MRS. Read more...Last updated: December 28, 2005
The proposal is to construct and operate a 23-kilometre pipeline from Kwinana Junction, in Kwinana to Hopelands (between Punrak Road and Henderson Road). This proposal is known as the Southern Looping Project, and comprises loop 10. The proponent has also referred a proposal to construct and operate a 194-kilometre pipeline from Compressor Station 1 south of Karratha, to Compressor Station 9, north of Gingin. This proposal, known as the Northern Looping Project , and comprising loops 1 to 9,... Read more...Last updated: March 4, 2005
The proposal is to construct and operate the South West Metropolitan Railway from Perth to Mandurah. The proposal includes the establishment of rail infrastructure between Perth and Mandurah with the northern section of the line running from the Perth Central Business District to Anketell tunnel via the Kwinana Freeway. South of the Anketell tunnel, the proposed railway passes through the local government areas of the Town of Kwinana, the City of Rockingham and the City of Mandurah, and... Read more...Last updated: September 20, 2004
Proposal to subdivide approximately 89 hectares of land being Lot 502 bounded by North Lake, Phoenix and Sudlow Roads and a rail reserve, for industrial and mixed business purposes. The proponent for the proposal is the Western Australian Land Authority trading as LandCorp (LandCorp). Read more...Last updated: June 25, 2004
Proposal by the Water Corporation to construct a Water Treatment Plant in Mundaring and Water Storage Tanks in Sawyers Valley. Read more...Last updated: May 27, 2004
Inquiry under section 46 of the, Environmental Protection Act 1986, to the Telfer Project power suppy and infrastruction corridor.The recommended change to the environmental conditions of Ministerial Statement 605 will reduce the length of open trench permitted for the approved project from 60 km to 20 km and accordingly reduce the level of fauna mortality experienced during the construction of the pipeline. Read more...Last updated: May 26, 2003
The proposal involves the construction and operation of a 30 GL desalination plant at one of two locations in the Kwinana Industrial Area. The alternative sites are at the Kwinana Power Station (KPS) or on the corner of Patterson and Office Roads, East Rockingham. Read more...Last updated: October 28, 2002
Proposal by Mr GM & Mrs CM White to subdivide their 24.6 hectare property, Lot 5 Lexia Avenue, Upper Swan into nine rural residential lots of greater than 2 hectares each. Read more...Last updated: June 12, 2002
The proposal is to design and construct the extension of the Tonkin Highway from Mills Road West to South Western Highway. The proposal is approximately 32 km in length and includes the design, construction and use of a highway of six lanes from Mills Road West to Mundijong Road and four lanes from Mundijong Road to South Western Highway. Read more...Last updated: October 17, 1999
Proposal to deviate the alignment of Kalamunda Road around the southern perimeter of the Guildford Cemetery. Read more...Last updated: August 30, 1999
Pacesetter Homes proposes to subdivide Lots 1588 and 10 Harpenden Street Southern River into 89 residential allotments. Read more...Last updated: June 4, 1999
The Western Australian Planning Commission proposes to rezone the majority of the Forrestfield Marshalling Yards to "Industrial" from the current Metropolitan Region Scheme reservation of "Railways" and to relocate the "Important Regional Road" (Dundas Road) to a site within the Forrestfield Marshalling Yards. Read more...Last updated: May 13, 1992
An application for Renewal of Excavation Licence by Midland Brick Company Ltd was referred to the Environmental Protection Authority by the Shire of Swan in August 1990. the Authority assessed the environmental impact of the proposal by way of a Consultative Environmental Review in conjunction with four other nearby clay excavation proposals which, together with this proposal were thought to potentially impact on Ellen Brook Nature Reserve and to have common regional issues of rehabilitation... Read more...Last updated: January 20, 1992
The proponent, J Mazza, proposes to subdivide and develop Lot 219 on Myall Road, Jandakot to create 9 "Special Rural" lots ranging in size from 2 ha to 2.17 ha. The site is currently zoned "Special Rural" under the City of Cockburn's Town Planning Scheme No. 2 with corresponding special provisions designed to regulate land use. Read more...Last updated: January 17, 1990
The Port Geographe proposal is a residential canal development with harbour, commercial centre and a conservation area. The site lies on the coast immediately east of the existing Busselton built up area, between the ocean foreshore to the north and the Vasse estuary to the south and east. The project site has a total area of 300 hectares. Approximately 114 hectares of the site is proposed to become conservation area and be transferred to the Crown. Read more...