Last updated: July 17, 1995
Inquiry under s46 regarding a proposal to increase the generating capacity of the Pinjar station by a nominal 340MW. This increased capacity would be provided through the installation of: a fourth Frame 9 (nominally llOMW) gas turbine, together with; four waste heat boilers and two 115MW steam turbines with associated infrastructure. This proposal will increase the total potential generating capacity of the Pinjar station from a nominal 575MW (7 times 37MW plus 3 times 105MW) to 915MW (575MW... Read more...