This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: May 16, 2003
Inquiry under s46 into the request for changes to the implementation conditions of Ministerial Statement 034 and Ministerial Statement 470 . CSBP proposes to export shipments of anhydrous ammonia from the Fremantle Ports’ Bulk Cargo Jetty at Kwinana to overseas markets, utilising its existing ammonia storage tanks, ammonia transfer pipeline (previously used for ammonia importation) and mobile loading/unloading arm trolley. The only additional item required to facilitate ammonia export is an... Read more...Last updated: May 12, 2003
Cable Sands (WA) Pty Ltd proposal to develop a mineral sands mine in a section of State Forest No.2, near Ludlow. Read more...Last updated: March 18, 2003
The proposal is for construction of a natural gas fired cogeneration facility on a 2.5ha site located within Alcoa’s Pinjarra Alumina Refinery. Alinta Cogeneration (Alcoa Pinjarra) Pty Ltd will own the facility and will supply steam to Alcoa for refinery purposes. Alinta Cogeneration (Alcoa Pinjarra) Pty Ltd will sell the power generated to customers within the South-West Interconnected System (SWIS). Alcoa will operate the facility within the framework of the Pinjarra refinery operations. The... Read more...Last updated: December 20, 2002
Methanex proposes to develop a methanol complex on the Burrup Peninsula, approximately 1300 kilometres north of Perth. The selected project site is located in the King Bay – Hearson Cove Industrial Area, approximately 6 and 10 kilometres from the towns of Dampier and Karratha respectively. Approximately 84 hectares of the 100 hectare site will be cleared to accommodate the methanol complex. Read more...Last updated: December 20, 2002
The proposal is for construction and operation of a methanol plant of 1.05 million tonnes per annum (Mt/a) nominal capacity, at Withnell East industrial area on the Burrup Peninsula The proposal includes the installation of a gas supply pipeline, product pipeline, seawater supply pipeline and wastewater discharge pipeline to be situated in infrastructure corridors for which the Department of Mineral and Petroleum Resources (MPR) will be proponent. The plant footprint will occupy approximately... Read more...Last updated: December 18, 2002
This proposal relates to the establishment, by undertaking clearing and earthworks, of a section of the western portion of the Burrup East-West Corridor west of Burrup Road, for the installation of anticipated infrastructure services within it. Services to be potentially located in the proposed corridor include sealed conveyors, an inspection and maintenance track, pipelines, transmission lines and cables, and communications. Pipelines using this corridor are anticipated to carry liquid... Read more...Last updated: November 18, 2002
The proposal is to construct and operate a commercial scale HIsmelt Process Plant at Kwinana in Western Australia. The plant will be located at the site currently occupied by the existing HIsmelt Research and Development Facility (HRDF) within the northern portion of the Kwinana Industrial Area (KIA), 40km south of Perth. The Stage 1 plant will initially produce around 820,000 tonnes per annum of pig iron. If the Stage 1 plant is found to be technically and commercially viable, the proponent... Read more...Last updated: September 13, 2002
The proposal being assessed is for the diversion of 8 gigalitres a year (on average) (GL/yr) of unallocated water resources in the Samson Catchment to be diverted for public water supply, the construction of a pipe head dam and related infrastructure. The Samson Brook Redevelopment Scheme is a key element of the Water Corporation’s drought recovery plan. Read more...Last updated: August 21, 2002
The proposal is to build a transmission line with a maximum capacity of 330 kV from the Pinjar gas turbine station to the Cataby substation. The transmission line, which is primarily lattice tower construction up to 60 m high, traverses State Forest 65 South (Gnangara Park), Bush Forever Site 380, Gingin Stock Route Nature Reserve, State Forest 65 North and private property. The proposed line route is approximately 123 km long and involves the permanent clearing of up to approximately 2.9 ha of... Read more...Last updated: April 10, 2002
The proposal involves an expansion of the existing Dampier Public Wharf to provide improved facilities capable of servicing the future needs of industry in the area. The key components of the proposal are: construction of a 60-81 m long load-out facility south of the existing wharf; cut and fill operations to create a land backing to the facility (1.9 ha, of which 0.8 ha is reclaimed land); and quarrying of a 4.1 ha cargo lay-down and storage area. Read more...Last updated: February 6, 2002
The proposal is to develop a raw sugar industry on the Weaber, Keep River and Knox Creek Plains. The M2 Project is located near Kununurra within the Victoria-Bonaparte Biogeographic Region and the project area extends over approximately 76,000 ha of land comprising the Weaber, Keep River and Knox Creek Plains, and involves approximately equal areas within WA and the NT. The proposal has been assessed in two parts: biodiversity and management. This assessment is of the management component. See... Read more...Last updated: February 6, 2002
The proposal is to develop a raw sugar industry on the Weaber, Keep River and Knox Creek Plains. The M2 Project is located near Kununurra within the Victoria-Bonaparte Biogeographic Region and the project area extends over approximately 76,000 ha of land comprising the Weaber, Keep River and Knox Creek Plains, and involves approximately equal areas within WA and the NT. The proposal has been assessed in two parts: biodiversity and management. This assessment is of the biodiversity. See here for... Read more...Last updated: November 14, 2001
The proposed airport will be located in a site approximately 12 km north-east of Broome townsite. The proposal involves the construction of one main runway, parallel taxiway, turning nodes, apron parking, general aviation parking, maintenance and storage hangers and fuel storage. It also includes domestic and international terminals, land-side and airside commercial activities and a short future parallel runway for light aircraft. Read more...Last updated: November 14, 2001
The proposal involves the construction and operation of a road/rail corridor, and associated infrastructure, to provide direct access to the Port of Geraldton from the Geraldton-Mt Magnet Road, Walkaway Road and North West Coastal Highway. The implementation of this proposal would allow removal of the current rail line along the city foreshore, allowing redevelopment of this area, and remove existing social and environmental effects associated with this rail line alignment through Geraldton and... Read more...Last updated: September 14, 2001
The proposal is for a large-scale nickel and cobalt mining and processing operation which will involve the mining and processing of up to 15 million dry tonnes per annum (Mtpa) of lateritic ore to produce approximately 60,000 tonnes per annum (tpa) of nickel and up to 8,000 tpa of cobalt. The ore will be mined at Marshall Pool, 55 km south-south-east of Leinster, and Lawlers, 10 km south of Leinster. Read more...Last updated: August 14, 2001
The proposal is for construction and operation of facilities for annual export of 1.5 million tonnes of iron-ore, including the installation of a railcar dumper facility, iron ore storage, dust control systems and conveyor and loading equipment. Inquiry under s46 into amending the conditions of Ministerial Statement 325 , specifically in relation to noise. Read more...Last updated: October 12, 2000
The proposal is for the construction and operation of a dual runway airport within the Kalbarri Airport Reserve, approximately 8 kilometres east of Kalbarri. The proposal also includes the decommissioning and rehabilitation of the present airport site south of Kalbarri. Read more...Last updated: July 13, 2000
The Proposal is for the construction and operation of a facility for the export of iron ore. The facility would consist of three separate parts; a marine component, a terrestrial component and a rail component- Constructed and operated by FPA, KIPL and Westrail respectively. Read more...Last updated: April 19, 2000
The Western Australian Planning Commission proposes to remediate portions of 50.56 hectares (ha) of government land along the Owen Anchorage coastline in South Coogee. Read more...Last updated: April 4, 2000
The proposal is to construct and operate an extension to the Bibra Lake Main Sewer. Read more...