This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: February 12, 2009
The proposal is to develop an iron ore (haematite) mine at Jack Hills approximately 100 km west of Meekatharra. The project will have a lifespan of approximately seven years (five years of mining, two years of closure activities) and will be a contract mining operation. The project will consist of an open cut mine with one pit up to 140 metres deep (approximately 41.2 MT of ore and waste rock). The floor of the pit will be above the watertable and the pit will not be backfilled. Product will be... Read more...Last updated: December 17, 2008
The proposal is to develop a new iron ore mine approximately 60 kilometres west-north-west of Tom Price and 25 kilometres south-west of the existing Brockman 2 mine. The major components of the project include: Three new mine pits- with approximately 20% of the orebody occurring below the water table; Dry processing plant- including crushers, overland conveyor and screens; this will be located to the north of the pits running east/west to the rail loop; Associated mine infrastructure- this... Read more...Last updated: December 4, 2008
The construction and operation of a tourism development on Long Island, Wallabi Group, Houtman-Abrolhos Islands, consisting of visitor lodges (maximum of 60 guests), staff accommodation, communal facilities (including day-visitor facilities), boardwalks and gazebos, a swimming pool, deep water jetty, helipad, wastewater treatment plant, desalination plant and other maintenance/service facilities Read more...Last updated: August 5, 2008
To develop an open pit mine and process 20 million tonnes per annum (Mtpa) of ore to produce approximately 23,000 tonnes per annum (tpa) of molybdenum concentrate and approximately 48,000 tpa of copper concentrate. Read more...Last updated: March 20, 2008
The proposal is to establish materials stockpiling and handling facilities with a capacity of approximately 4 million tonnes at Cape Preston, approximately 60km west-south-west of Dampier. Read more...Last updated: July 12, 2007
The proposal is for the construction and operation of an ethanol bio-refinery on a 19 hectare site in the Kwinana Industrial Area. Read more...Last updated: November 29, 2006
This proposal is for the Development of Industrial Land on the Burrup Peninsula. The proposed site is designated Industrial Lease Area A (Site A). Approval would allow Woodside Energy Ltd to undertake limited site preparation activities for the future installation of infrastructure, such as LNG and condensate storage tanks, which would be needed should the proposed Pluto LNG Development be allowed to proceed. Read more...Last updated: November 17, 2006
The proposal is for the remaining life of the mine (50+ years), located west of Jimblebar Creek on Mining Lease 266SA. It entails increasing the iron ore production rate at the mine from 8 million tonnes per annum (Mtpa) to approximately 12Mtpa, and the mining of the currently undeveloped deposits on either side of the existing operation, including both in-situ hard rock and detrital ores. Approximately 600 million tonnes of Marra Mamba iron ore have been identified within the mining envelope.... Read more...Last updated: October 31, 2006
The proposal involves the construction and operation of an approximately 2.8 million tonnes per annum mineral sands mine and concentrator plant on part Swan Location 128, 354 & 508, Lot 2; part Swan Location 128 & 340, Lot 3; part Swan Location 128, 354, 355, 506, Lot 9; Swan Location 506; portion of each of Swan Locations 354 & 508, Lot 1 and part Swan Location 511 & 536, Lot 7, near the intersection of Brand Highway and Dewar Road, approximately 2.5 kilometres north-west of... Read more...Last updated: June 30, 2006
The proposal is to develop a mineral sand mine one kilometre north of the township of Waroona, which is approximately 140 km south of Perth. The area for assessment has been identified as Mining Tenements M70/735, M70/797 and M70/1089. Read more...Last updated: May 25, 2006
The proposal is for residential development on the East Clontarf site, approximately 18ha in size. The site is bounded by Manning Road, Centenary Avenue and the Canning River. It is zoned Urban in the Metropolitan Region Scheme (MRS) and Residential in the City of South Perth Town Planning Scheme. The foreshore area adjacent to the proposed development is identified for protection as Bush Forever site 333 and reserved for Parks and Recreation in the MRS. Read more...Last updated: April 28, 2006
The proposal is to reclaim a maximum of 3.5 hectares (ha) of Hanover Bay in Princess Royal Harbour to create a commercial and urban development along the Albany foreshore. This development involves tourist and residential accommodation, and industrial and maritime uses. As part of the development plan, it is proposed to provide services including drainage, sewerage, and connection to water mains and power. The foreshore redevelopment is part of a larger redevelopment plan for the Town of Albany. Read more...Last updated: December 21, 2005
The Red Hill quarry, located at Lot 11 Toodyay Road, Red Hill has been in operation since late 1997. The quarrying operation involves the extraction of hard rock from the West Pit by blasting and/or excavation by wheeled loader. Quarried rock is then transferred to the onsite crushing and screening plant where it is converted into the various products required in the construction of buildings, roads, railways and other infrastructure. The approval of this proposal in 1991 included two quarry... Read more...Last updated: December 5, 2005
The proposal is to expand Hamersley Iron's iron ore operations at Dampier Port from 95 million tonnes per annum (Mtpa) to 120 Mtpa. The Hamersley Iron Dampier Port operations include rail and port facilities, rail maintenance workshops, a 120MW power station, laboratories and other service and administrative functions. The port operations are located at two terminals – Parker Point (PP) and East Intercourse Island (EII). The proposal is to increase the capacity of the Parker Point terminal... Read more...Last updated: November 25, 2005
The revised proposal is to change the dimensions of the containment cell by reducing the footprint, from 7 ha t o 3.8 ha, and increasing the height, from 25m AHD to 35.5m AHD (approximately 15.5 m above surrounding land). Read more...Last updated: October 17, 2005
The proposal is to construct and operate a 330MW capacity advanced sub-critical coal-fired power station (known as Collie B) at the Collie Power Station Site, immediately adjacent to the existing ‘Collie A’ Power Station. It will be an advanced sub-critical coal fired base-load generation facility with a nominal generating capacity of up to 330MW. The Collie B Power Station will supply electricity to Western Power for the South West Interconnected System (SWIS) under the SWIS Power Procurement... Read more...Last updated: October 12, 2005
The proposal is to construct an ammonia–urea plant on the Burrup Peninsula. The plant will have a production capacity of 2300 tonnes/day (t/d) of ammonia and 3500 t/d of urea. The plant and associated infrastructure will be composed of: a natural gas supply pipeline from the North West Shelf Liquefied Natural Gas (LNG) Plant (to be located in a multi-user service corridor); ammonia plant; urea plant; fluid bed granulation plant; seawater desalination, treatment and storage; internal power... Read more...Last updated: September 21, 2005
CSBP currently produces approximately 235,000 tpa of ammonium nitrate at its Kwinana operations which are located within the Kwinana Industrial Area. This proposal is to expand the ammonium nitrate production capacity to approximately 580,000 tpa by debottlenecking and duplicating its existing facilities. The expansion includes: duplication and/or debottlenecking of the existing 500 tpd nitric acid plant; duplication and/or debottlenecking of the existing 635 tpd ammonium nitrate reaction plant... Read more...Last updated: June 13, 2005
Wesfarmers Energy Limited proposes to construct and operate the 300MW Collie B Power Station on a site directly adjacent to the existing Collie A Power Station and located approximately 10km east-north-east of Collie. It will be a supercritical coal-fired base-load generation facility with a nominal generating capacity of approximately 300MW. The Collie B Power Station will supply electricity to the South West Interconnected System (SWIS). Read more...Last updated: March 4, 2005
The proposal is to construct and operate the South West Metropolitan Railway from Perth to Mandurah. The proposal includes the establishment of rail infrastructure between Perth and Mandurah with the northern section of the line running from the Perth Central Business District to Anketell tunnel via the Kwinana Freeway. South of the Anketell tunnel, the proposed railway passes through the local government areas of the Town of Kwinana, the City of Rockingham and the City of Mandurah, and... Read more...