This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: July 31, 2023
The proposal will provide additional port facilities at Port Hedland to receive and stockpile the product from emerging miners, specifically the various mines owned by the proponent’s shareholders, and load this product onto ships for export. Each of the shareholders is exploring and developing new iron ore projects in the Pilbara, with one company actively mining ore and exporting through the existing facilities in the Port of Port Hedland. The current shareholders of the proponent are Atlas... Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 in response to a request to change condition 3 - Time Limit for Proposal Implementation of Ministerial Statement 891 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: January 24, 2022
Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. The EPA considered the Study of the Cumulative Impacts of Air Emissions in the Murujuga Airshed in its assessment of the Perdaman Urea Project. Read more...Last updated: May 25, 2021
The proposal is to construct industrial infrastructure and a Southern Harbour in Jervoise Bay south of the Northern Harbour precinct and including the Marine support facility. Read more...Last updated: June 18, 2020
Inquiry under s46 into changing the conditions (extension of time limit for proposal implementation) of Ministerial Statements 469, 774, 815 and 927. Read more...Last updated: June 11, 2018
The proposal is for the construction and operation of a technical ammonium nitrate production facility (TANPF) on Site D within the King Bay/Hearson Cove Industrial Estate on the Burrup Peninsula. The proposal is located approximately 13 kilometres north-west of Karratha. Read more...Last updated: April 30, 2015
To expand the liquefied natural gas (LNG) production capacity of the existing proposal from 15 million tonnes per annum (Mtpa) to 20 Mtpa (nominal). Read more...Last updated: February 12, 2014
Proposal by Ocean Dunes Pty Ltd to develop a recreational resort complex incorporating an 18 hole dune links type golf course of international competition standard, marina and beach resort and a residential estate on a 245 ha coastal site at Eglinton, some 45 mins north of the Perth Central Business District. Read more...Last updated: February 6, 2014
The proposal has the following main components: a 345 km railway line from Port Hedland to proposed mining operations at Mindy Mindy. This railway will be constructed in two parts: Part 1 from Port Hedland to the Chichester Ranges and Part 2 from the Chichester Ranges to Mindy Mindy; construction of port facilities consisting of rail loop, car dumper, stockyard and ore handling facilities (including two stackers and a single reclaimer), rescreening facility and product conveyor out to a wharf... Read more...Last updated: August 9, 2013
Plan for the future urban development and conservation of Lots 37, 38 and Part Lot 39 Elizabeth Street, Lots 2, 3, and 286 Alison Parade, Lot 1000, 1001 and Part Lot 42 Lower King Road, Part Lot 1 Yatana Road, Location 476 Sibbald Road and Lot 0 Bayonet Head, within the Bayonet Head Outline Development Plan Area (as defined in City of Albany Town Planning Scheme No. 3). Read more...Last updated: January 22, 2013
The proposal is for the construction of a deepwater port. Inquiry under s46 regarding changing condition 9 of Ministerial Statement 469 . Read more...Last updated: June 30, 2010
The proposal is to construct and operate a minimum 50 GL/annum and up to 100 GL/annum desalination plant on Lots 32 and 33, and Part Lot 8 Taranto Road, Binningup; marine inlet/outlet pipes; and a water supply pipeline to transport potable water to the Integrated Water Supply Scheme via a storage facility near Harvey. Read more...Last updated: December 1, 2009
The proposal is to construct a deepwater port to service fully loaded Panamax sized vessels (65 000 DWT) at Oakajee, approximately 23 kilometres north of Geraldton. Three site locations (north, south and central) and two different design options (inshore and off-shore) were considered in developing the proposal. The design option favoured by the proponent is an in-shore port design at the northern sector. The port study area is approximately 23 kilometres north of Geraldton. The port will... Read more...Last updated: November 17, 2004
The Environmental Protection Authority (EPA) has been required by the Minister for the Environment to provide further assessment on the proposal by James Point Pty Ltd (JPPL) to construct and operate a private container and general cargo Port (referred to as the Stage 1 Port) to the north of James Point in Cockburn Sound. See the original assessment here . Read more...Last updated: November 14, 2001
The proposal involves the construction and operation of a road/rail corridor, and associated infrastructure, to provide direct access to the Port of Geraldton from the Geraldton-Mt Magnet Road, Walkaway Road and North West Coastal Highway. The implementation of this proposal would allow removal of the current rail line along the city foreshore, allowing redevelopment of this area, and remove existing social and environmental effects associated with this rail line alignment through Geraldton and... Read more...Last updated: June 8, 1998
Proposal to develop a land-based marine shell breeding facility and residence on Downes Island approximately seven kilometres west of Port Hedland. Trochus shells (, Trochus niloticu, ), Pearl oysters (, Pteria penguin, ,, Pinctada margaritifera, ,, P. albina, ) and a range of other native Australian shells will be bred at the facility. Trochus and pearl oysters will be grown-out off-site. Read more...Last updated: April 24, 1997
The proposal is to extend the existing breakwater in the northern precinct of Jervoise Bay. In summary, the breakwater extension will: commence immediately west of the Cockburn Power Boat Association facility, be 700 metres (m) long, approximately 40m wide, and cover 2.8 hectares (ha) of seabed; be constructed of limestone rubble mound, as used in the existing breakwater and has an expected construction period of 40 weeks; and form a harbour with an entrance width of 120m at mean sea level. Read more...Last updated: November 21, 1995
Inquiry under s46 regarding amendment of conditions of Ministerial Statement 168 . The proposed changes involve the withdrawal of three conditions and consequential changes to three commitments from the 1991 statement. Onslow Salt submitted a final proposal in January 1995 (Onslow Salt Pty Ltd, 1995), which contained a detailed description and justification for the proposed changes. Read more...