This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: February 9, 2024
The proposal includes the existing Cloudbreak iron ore mine and proposed expansion. The existing mine includes open pit strip mining, backfilling of pits, progressive rehabilitation and ore processing. The expansion includes increasing ore production, development of new pits and permanent waste landforms, the development of new infrastructure, additional dewatering and water disposal activities, an upgrade of the ore processing facility. Read more...Last updated: November 6, 2023
Fortescue Metals Group Ltd proposes to develop the Eliwana Mine Project in the Pilbara region of Western Australia. The Eliwana Mine Project Area is located approximately 90 km west-northwest of Tom Price. Over the life of the mine, the average annual production rate is estimated at 30 Mtpa but infrastructure will be constructed to reflect peaks in the annual production rate up to 50 Mtpa. The estimated mine life is 24 years. The proposal involves the clearing of up to 8,560 ha of native... Read more...Last updated: September 29, 2023
Atlas Iron Pty Ltd is proposing to develop and operate Stage 2 of the Sanjiv Ridge Project, a satellite operation to Stage 1, which will involve the above water table mining of approximately 10 million tonnes (Mt) of iron ore from the Glen Herring deposit which is located on an adjacent range 3 km west of Stage 1 and approximately 241 km south-east of Port Hedland in the Shire of East Pilbara. The proposal will consist of three new pits, four waste rock dumps and a 4 km haul road connecting to... Read more...Last updated: July 31, 2023
This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: June 16, 2023
The requested change relates to condition 3 of Statement 1027 for an extension to the time limit for proposal implementation. Read more...Last updated: August 4, 2022
Hamersley Iron Pty Limited (the proponent) propose to develop the Greater Paraburdoo Iron Ore Hub. The proposal is an expansion of the existing operations at Paraburdoo and Eastern Range which is not subject to a Ministerial Statement issued under Part IV of the, Environmental Protection Act 1986, (EP Act). The proposal area is located approximately six kilometres south of the town of Paraburdoo in the Pilbara region of Western Australia. Existing operations at Paraburdoo and Eastern Range are... Read more...Last updated: April 16, 2021
Robe River Mining Co. proposes to develop the West Angelas C, D and G iron ore deposits to sustain production at the existing West Angelas iron ore operations. The proposal is located approximately 130 km northwest of Newman. Mining of the C, D and G iron ore deposits will involve the additional clearing of up to 4,310 ha of native vegetation within a mine development envelope of 26,400 ha. Mine dewatering will be required to accommodate below water table mining, requiring an additional ... Read more...Last updated: January 7, 2021
Alcoa of Australia have requested changes to conditions 8, 9, 10, 11 and 12 of Ministerial Statement 728 and 1069 in order to facilitate an increase in production to 3.3 million tonnes per annum (Mtpa). Read more...Last updated: July 23, 2020
Changes to Condition 3 in order to extend the Time Limit of Authorisation for commencement of the proposal. Read more...Last updated: May 27, 2020
Changes to conditions 3-1 and 3-2, time limit of authorisation of Ministerial Statement 985 in order to extend the Time Limit of Authorisation. Read more...Last updated: May 6, 2020
Changes to conditions 8 (Stage 1 offsets) and 9 (Access to Stage 2 mining area) to allow full ground disturbance access to the Stage 2 mining area based on progress to date, and condition 10 (Stage 2 offsets) in terms of offsetting significant residual impact. Read more...Last updated: January 15, 2020
The proposal is to revise the Mining Area C operation (located approximately 90km WNW of Newman) to include a new satellite ore body which is located approximately 8 km to the south of the existing approved Mining Area C operations. The revised proposal would require the additional clearing of approximately 19,850 hectares of vegetation and mining below the water table. Read more...Last updated: November 26, 2019
The Proposal is located within the Pilbara Interim Biogeographic Regionalisation for Australia (IBRA) region and is located within the Fortescue and Hamersley IBRA subregions. The Approved Project (authorised by Ministerial Statement 933 , 1 February 2013) is an above the water table open cut mine and associated infrastructure, located on mining tenement M470/1439. This proposal is to mine below the water table. Read more...Last updated: August 21, 2019
Robe River Mining Co Pty Ltd is seeking to extend the existing Mesa A / Warramboo Iron Ore Mining Project by extending the existing mining operation and developing four new nearby deposits. The proposal is 43 kilometres west of Pannawonica in the Pilbara Region. The proposal would require an additional 3000 hectares of clearing of native vegetation, with some below water table mining. A water supply would also be required and discharge of any excess water to Warramboo Creek. Read more...Last updated: November 12, 2018
The proposal is to develop and operate an iron ore mine approximately 50 km west-northwest of Paraburdoo, Western Australia, a 20 km long gas pipeline corridor, and a 150 km long rail transport corridor that would connect the proposed mine to the West Pilbara Iron Ore Project Stage 1 infrastructure. Read more...Last updated: March 3, 2016
The proposal includes the existing Hamersley Yandicoogina iron ore project and proposed expansion. The existing project includes open pit mining at the Junction Central and Junction South East operations and associated infrastructure, dewatering activities, closure and rehabilitation. The expansion includes the development of new pits at Junction South West and Oxbow, temporary waste landforms, the development of new infrastructure, additional dewatering and water disposal activities. The... Read more...Last updated: February 4, 2016
The proposal is to develop eight iron ore deposits at five locations, between 35 and 85 kilometres (km) south of Pannawonica. A heavy-haulage railway approximately 285 km in length would be developed to connect the mine area with a port to be constructed at Anketell Point, 25 km north-east of Karratha. The project would produce up to 30 million tonnes per annum (Mtpa) of iron ore. Read more...Last updated: August 7, 2015
The Minister for Environment requested the EPA inquire into the matter of changing the implementation conditions relating to the Orebody 18 Iron Ore Mine proposal, particularly the matter of setting a condition on the proposal that would require environmental offsets for the clearing of native vegetation. Inquiry under s46 relating to Ministerial Statement 439 and EPA Report 840 . Read more...Last updated: October 24, 2014
The construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Inquiry into amending the conditions of Ministerial Statement 816 (extension of term). Read more...