Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • (-) Remove Infrastructure filter Infrastructure
  • Iron Ore (5) Apply Iron Ore filter
  • Industrial (4) Apply Industrial filter
  • Power generation (1) Apply Power generation filter

Filter by current status:

  • Ministerial Statement published (23) Apply Ministerial Statement published filter
  • Awaiting Ministerial decision (1) Apply Awaiting Ministerial decision filter
  • Public Environmental Review period closed (1) Apply Public Environmental Review period closed filter

Filter by preliminary environmental factors:

  • (-) Remove Air Quality filter Air Quality
  • (-) Remove Flora and Vegetation filter Flora and Vegetation
  • (-) Remove Social Surroundings filter Social Surroundings
  • Terrestrial Fauna (23) Apply Terrestrial Fauna filter
  • Inland Waters Environmental Quality (15) Apply Inland Waters Environmental Quality filter
  • Hydrological Processes (11) Apply Hydrological Processes filter
  • Marine Environmental Quality (10) Apply Marine Environmental Quality filter
  • Marine Fauna (9) Apply Marine Fauna filter
  • Benthic Communities and Habitats (8) Apply Benthic Communities and Habitats filter
  • Terrestrial Environmental Quality (5) Apply Terrestrial Environmental Quality filter
  • Landforms (4) Apply Landforms filter
  • Coastal Processes (3) Apply Coastal Processes filter
  • Human Health (3) Apply Human Health filter
  • Subterranean Fauna (2) Apply Subterranean Fauna filter
  • Inland Waters (1) Apply Inland Waters filter

Filter by Proponent:

  • API Management Pty Limited (2) Apply API Management Pty Limited filter
  • Minister for State Development (2) Apply Minister for State Development filter
  • Water Corporation (2) Apply Water Corporation filter
  • Water Corporation of Western Australia (2) Apply Water Corporation of Western Australia filter
  • Australian Methanol Company Pty Ltd (1) Apply Australian Methanol Company Pty Ltd filter
  • BHP Biliton Iron Ore (1) Apply BHP Biliton Iron Ore filter
  • BHP Billiton Iron Ore Pty Ltd (1) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Burrup Fertilisers Pty Ltd (1) Apply Burrup Fertilisers Pty Ltd filter
  • Coolimba Power Pty Ltd (1) Apply Coolimba Power Pty Ltd filter
  • Fortescue Metals Group Limited (1) Apply Fortescue Metals Group Limited filter
  • Grange Resources Limited (1) Apply Grange Resources Limited filter
  • Grange Resources Ltd (1) Apply Grange Resources Ltd filter
  • Griffin Power 3 Pty Ltd (1) Apply Griffin Power 3 Pty Ltd filter
  • Karara Mining Limited (1) Apply Karara Mining Limited filter
  • Lanco Resources Australia Pty Ltd (1) Apply Lanco Resources Australia Pty Ltd filter
  • Methanex Corporation (1) Apply Methanex Corporation filter
  • Minister for Resources Development (1) Apply Minister for Resources Development filter
  • NewGen Neerabup Pty Ltd (1) Apply NewGen Neerabup Pty Ltd filter
  • Oakajee Port and Rail Pty Ltd (1) Apply Oakajee Port and Rail Pty Ltd filter
  • Port Hedland Port Authority (1) Apply Port Hedland Port Authority filter
  • Western Stevedores Pty Ltd (1) Apply Western Stevedores Pty Ltd filter

Filter by region:

  • Pilbara (10) Apply Pilbara filter
  • Mid West (5) Apply Mid West filter
  • Perth (4) Apply Perth filter
  • Great Southern (2) Apply Great Southern filter
  • South West (2) Apply South West filter
  • Peel (1) Apply Peel filter
  • Wheatbelt (1) Apply Wheatbelt filter

Filter by last updated:

  • 2022 (1) Apply 2022 filter
  • 2021 (1) Apply 2021 filter
  • 2020 (2) Apply 2020 filter
  • 2019 (1) Apply 2019 filter
  • 2016 (2) Apply 2016 filter
  • 2015 (3) Apply 2015 filter
  • 2013 (2) Apply 2013 filter
  • 2012 (1) Apply 2012 filter
  • 2011 (4) Apply 2011 filter
  • 2010 (2) Apply 2010 filter
  • 2009 (1) Apply 2009 filter
  • 2003 (1) Apply 2003 filter
  • 2002 (4) Apply 2002 filter
  1. Home
  2. Proposal search
  3. Air Quality
  4. Social Surroundings
  5. Infrastructure
  6. Flora and Vegetation

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Alkimos Seawater Desalination Plant

Last updated: October 26, 2022

The Western Australian Water Corporation is proposing to construct the Alkimos Seawater Desalination Plant (ASDP) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The ASDP Proposal will be located within the Alkimos Water Precinct (Lot 1050 Marmion Avenue), approximately 40 km north of the Perth, within the northwest corridor, north of Quinns Rock beach and south of Yanchep beach.... Read more...

330MW Gas-Fired Power Station, Neerabup (s46) [2239]

Last updated: November 25, 2021

Changes to condition 5 (relating to performance review), condition 9 (relating to stack emissions), and condition 11 (relating to decommissioning), in order to contemporise the conditions of the Statement and streamline its regulatory obligations. Read more...

Albany Iron Ore Project - Southdown Magnetite Proposal (s46) [2222]

Last updated: July 23, 2020

Changes to Condition 3 in order to extend the Time Limit of Authorisation for commencement of the proposal. Read more...

Oakajee Deepwater Port, Oakajee, Shire of Chapman Valley (s46) [2171]

Last updated: June 18, 2020

Inquiry under s46 into changing the conditions (extension of time limit for proposal implementation) of Ministerial Statements 469, 774, 815 and 927. Read more...

Cloudbreak Life of Mine Expansion

Last updated: June 6, 2019

The proposal includes the existing Cloudbreak iron ore mine and proposed expansion. The existing mine includes open pit strip mining, backfilling of pits, progressive rehabilitation and ore processing. The expansion includes increasing ore production, development of new pits and permanent waste landforms, the development of new infrastructure, additional dewatering and water disposal activities, an upgrade of the ore processing facility. Read more...

Bunbury Berth 14A Expansion Project

Last updated: December 6, 2016

The proposal is to construct and operate a coal handling and export facility within the Bunbury Port Inner Harbour in the south-west region of Western Australia. Read more...

West Pilbara Iron Ore Project Stage 1 - Mine and Rail

Last updated: February 4, 2016

The proposal is to develop eight iron ore deposits at five locations, between 35 and 85 kilometres (km) south of Pannawonica. A heavy-haulage railway approximately 285 km in length would be developed to connect the mine area with a port to be constructed at Anketell Point, 25 km north-east of Karratha. The project would produce up to 30 million tonnes per annum (Mtpa) of iron ore. Read more...

Utah Point Berth Project (Stage B)

Last updated: December 14, 2015

The Utah Point Berth Project consists of two separate stages: Stage A: Dredging and Reclamation; and Stage B: Construction and Operation. Stage A, dredging and reclamation works for the UPBP was approved by the Minister for Environment as an amendment to the existing Fortescue Metals Group (FMG) approval and managed according to the approved conditions. The works for Stage A have been successfully completed. The EPA determined that Stage B, the construction and ongoing operation of stockyard... Read more...

Orebody 18 Iron Ore Mine (s. 46)

Last updated: August 7, 2015

The Minister for Environment requested the EPA inquire into the matter of changing the implementation conditions relating to the Orebody 18 Iron Ore Mine proposal, particularly the matter of setting a condition on the proposal that would require environmental offsets for the clearing of native vegetation. Inquiry under s46 relating to Ministerial Statement 439 and EPA Report 840 . Read more...

Ammonia Plant, Burrup Peninsula

Last updated: August 5, 2015

The proposal is to construct and operate an ammonia plant on the Burrup Peninsula, approximately 1300 kilometres north of Perth. The selected project site is located in the King Bay-Hearson Cove Industrial Area and is approximately 6 and 10 kilometres from the towns of Dampier and Karratha respectively. The site covers an area of about 72 hectares and the actual plant footprint and infrastructure (including a thermal desalination plant) will occupy an area of approximately 20 hectares. Read more...

Anketell Point Port Development, Antonymyre, Shire of Roebourne

Last updated: January 30, 2013

The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...

Oakajee Deepwater Port (s. 46) [1950]

Last updated: January 22, 2013

The proposal is for the construction of a deepwater port. Inquiry under s46 regarding changing condition 9 of Ministerial Statement 469 . Read more...

Port Hedland Outer Harbour Development

Last updated: February 28, 2012

The proposal is to construct and operate the Outer Harbour Development which includes landside and marine infrastructure for the handling and export of iron ore from BHPBIO’s operations. The Boodarie stockyard infrastructure will supply an overland conveyor to a transfer pad located to the west of the existing Finucane Island facilities. A piled jetty will transfer ore material to the ship loaders located at the piled wharf. Read more...

Albany Iron Ore Project - Southdown Magnetite Proposal

Last updated: November 22, 2011

The proposal involves the construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Read more...

Oakajee Terrestrial Port Development

Last updated: March 14, 2011

The proposal is to construct and operate iron ore handling and storage facilities and ancillary infrastructure required to develop and operate a 45 million tonne per annum iron ore export facility at Oakajee, 24km north of Geraldton. Read more...

Mungada Iron Ore Project

Last updated: March 11, 2011

The proposal is to mine hematite and magnetite iron ore from the Blue Hills North and Terapod deposits, and construction of associated mine infrastructure, upgraded access road to Morawa, Tilley Siding, and powerline corridor in the Midwest region of Western Australia. Read more...

Bluewaters Power Station Expansion - Phase III and Phase IV

Last updated: January 20, 2011

The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal also involves the construction and operation of an approximately 63 kilometre long wastewater discharge pipeline following the same... Read more...

Southern Source Integration Assets Pipeline Corridor

Last updated: November 4, 2010

Identification of potential corridors and areas for future installation of water and waste water pipelines and associated infrastructure throughout the southern suburbs of Perth. Read more...

Coolimba Power Station Project, Eneabba

Last updated: September 17, 2010

The proposal is to construct and operate the Coolimba Power Station on a site located approximately 15 kilometres (km) south-south-west of Eneabba, and to establish an approximately 20 km long and 100 metre (m) wide infrastructure corridor that will accommodate the construction and operation of: a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline; and a 330 kV electricity transmission line to... Read more...

Oakajee deepwater port, Oakajee, Shire of Chapman Valley

Last updated: December 1, 2009

The proposal is to construct a deepwater port to service fully loaded Panamax sized vessels (65 000 DWT) at Oakajee, approximately 23 kilometres north of Geraldton. Three site locations (north, south and central) and two different design options (inshore and off-shore) were considered in developing the proposal. The design option favoured by the proponent is an in-shore port design at the northern sector. The port study area is approximately 23 kilometres north of Geraldton. The port will... Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2023 Government of Western Australia. All rights reserved.