This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 3, 2017
The proponent for the proposal, Western Australian Sports Centre Trust (trading as Venues West), has requested changes to the implementation conditions 6-1 and 6- of Ministerial Statement 632 relating to Water Quality. This is the EPA's inquiry into the requested amendments. Read more...Last updated: February 6, 2017
The Water Corporation proposes the construction and operation of the Balannup Pressure Main, a 4.5 km wastewater pressure main from the Collared Street Pump Station to the Waterworks Road Pump Station in Armadale. Read more...Last updated: January 25, 2017
The proposal involves the development and operation of a 750 Mt iron ore mine, processing facility and associated infrastructure within mining leases M47/1414 and M47/1419. The project area is located approximately 100km north west of Newman in the Fortescue valley. The project area is approximately 15km south of the Fortescue Marsh, a wetland of national significance, and is intersected by Weeli Wolli Creek, which is a major Pilbara drainage system that discharges to the Marsh. Read more...Last updated: January 16, 2017
The proposal is to mine uranium ore from the Yeelirrie deposit, approximately 70 km south-west of Wiluna, and the construction of associated mine infrastructure, including ore processing facilities, water (includes borefield and corridors) abstraction and reinjection infrastructure, roads, accommodation, offices and workshops, stockpile and laydown areas and evaporation pond. Tailings would be discharged into the mine open pit. Read more...Last updated: January 9, 2017
Toro proposes to revise the Approved Project by developing Millipede and Lake Maitland uranium deposits and developing associated infrastructure. The Proposed Extension would result in the additional direct disturbance of approximately 1,582 hectares (ha) within an additional Development Envelope of approximately 3,891 ha. The Proposed Extension would include open mine pits at Millipede and Lake Maitland, in-pit tailings storage facility (TSF) at Millipede, accommodation village, workshop, run-... Read more...Last updated: December 16, 2016
The proposal is to mine four poly-metallic deposits containing commercial concentrations of uranium and to produce uranium oxide concentrate and other metal concentrates including copper, zinc, nickel and cobalt, approximately 240km east-northeast of Kalgoorlie. The proposal also includes the construction of associated mine infrastructure consisting of mine dewatering and reinjection infrastructure (including borefields and pipelines), non-mineralised overburden landforms, run of mine stockpile... Read more...Last updated: December 8, 2016
In September 2011 Chevron Australia Propriety Limited (CAPL) and the Department of State Development (DSD) executed an agreement (Ashburton North State Development Agreement (Wheatstone Project) (SDA)) that required CAPL, to develop and execute a project that increased potable water supply to Onslow by 2 ML/day. This project is referred to as the Onslow Water Infrastructure Upgrade Project. After completion of the works the assets will be handed-over to the Water Corporation for ongoing... Read more...Last updated: December 8, 2016
Cristal Australia Pty Ltd proposes the Wonnerup North Mineral Sands Project located approximately 10 kilometres east of Busselton, City of Busselton. The project would involve dry mining and processing of mineral sands ore from the Wonnerup North deposit at a rate of approximately 2.3 million tonnes (Mt) per annum over eight years. Read more...Last updated: December 7, 2016
The proposal is to construct and operate a single entrance onshore marina to accommodate up to 500 boat pens and moorings and a surrounding land development comprising tourism, commercial, public open space and residential land uses. Read more...Last updated: December 7, 2016
Fortescue Metals Group Limited is proposing to increase the footprint and mining life of the Solomon Iron Ore Project. The proposal consists of expanding mining operations and rail infrastructure beyond the current footprint. Fortescue Metals Group Limited is also seeking approval for an external borefield to provide an additional water supply to support the expansion. The extent of proposed ground disturbance is approximately: 11,322 hectares for the mine expansion within a development... Read more...Last updated: December 7, 2016
The proposal is to clear some portion of Kent Location 1858 for agricultural purposes. The exact area of proposed clearing has changed as the proponent has made further submissions to the State Administrative Tribunal. It is understood that the proponent’s current application is to clear approximately 65 hectares of native vegetation. Read more...Last updated: December 6, 2016
The proposal is to construct and operate a coal handling and export facility within the Bunbury Port Inner Harbour in the south-west region of Western Australia. Read more...Last updated: December 2, 2016
The proposal is to construct, operate and maintain a 1.5 km section of Keane road between Anstey and Skeet roads, Forrestdale. The proposal is located within Bush Forever Site 342 (approximately 369 hectares (ha)), which meets all six of the EPA’s criteria for the identification of regionally significant natural areas, contains one of the largest remaining areas of damplands of high conservation value on the Swan Coastal Plain, and is the largest consolidated area of Southern River vegetation... Read more...Last updated: November 30, 2016
The Department of Minerals and Petroleum has referred a Programme of Work application. The application, from Holcim (Australia) Pty Ltd, is to undertake an air core drilling exploration programme on M70/1248 and M70/1250. The exploration site is cleared pine plantation to the East of Lake Jandabup. Read more...Last updated: November 30, 2016
The Site is approximately 16.9 ha and is proposed to be remediated and regenerated. It was previously mined for building and construction sands and was later used as a licensed “inert” landfill. It has been reported that non-approved waste streams were disposed of at the Site. In October 2010 following a compliance inspection the Site was classified “Contaminated – Remediation Required” under Section 13 of the Contaminated Sites Act 2003 The proponent is proposing to redevelop the area by... Read more...Last updated: November 22, 2016
The Bunbury Port Authority has prepared this plan to guide future development and decision making within the Inner Harbour and to conform to the strategic planning requirements under the, Port Authorities Act 1999, . It will also provide greater certainty of land use and development for port users, the Bunbury Port Authority and other decision making authorities, neighbouring landowners and the community. Read more...Last updated: November 17, 2016
The proposal is to construct and operate a uranium mine consisting of two deposits Centipede and Lake Way at mining tenements M53/224 and MLA53/1090, located approximately 30 kilometres south and 15 kilometres south-east of Wiluna. Read more...Last updated: November 8, 2016
The proposal is an expansion of an existing approved proposal: Yandicoogina Iron Ore Project ( Ministerial Statement 914 ) to develop iron ore deposits at Junction Central, Junction South East, Junction South West and Oxbow, located in the central Pilbara region of Western Australia, on mining lease 274SA. The proposal is located within the Pilbara Interim Biogeographic Regionalisation for Australia (IBRA) region and is located within the Fortescue and Hamersley IBRA subregions. Read more...Last updated: September 19, 2016
The proposal is to develop a Waste Transfer and Resource Recovery Facility approximately 10 kilometres from Perth at 25 Jackson Street, Bassendean in the Bassendean Industrial Area. The proposal would include: a Materials Recovery Facility (MRF) for the processing of co-mingled recyclables; acceptance, short term stockpiling and baling of source separated recycled commodities; glass crusher for management of waste glass from the MRF; a metal shredder for the processing of metal commodities; a... Read more...