Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • EPA Board Meetings
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • Infrastructure (9) Apply Infrastructure filter
  • Land use (6) Apply Land use filter
  • Mineral sands (4) Apply Mineral sands filter
  • Iron Ore (3) Apply Iron Ore filter
  • Uranium (2) Apply Uranium filter
  • Industrial (1) Apply Industrial filter

Filter by current status:

  • (-) Remove Ministerial Statement published filter Ministerial Statement published

Filter by preliminary environmental factors:

  • (-) Remove Hydrological Processes filter Hydrological Processes
  • (-) Remove Inland Waters Environmental Quality filter Inland Waters Environmental Quality
  • (-) Remove Social Surroundings filter Social Surroundings
  • (-) Remove Terrestrial Environmental Quality filter Terrestrial Environmental Quality
  • Flora and Vegetation (20) Apply Flora and Vegetation filter
  • Terrestrial Fauna (20) Apply Terrestrial Fauna filter
  • Air Quality (9) Apply Air Quality filter
  • Human Health (6) Apply Human Health filter
  • Subterranean Fauna (4) Apply Subterranean Fauna filter
  • Marine Environmental Quality (2) Apply Marine Environmental Quality filter
  • Marine Fauna (2) Apply Marine Fauna filter
  • Benthic Communities and Habitats (1) Apply Benthic Communities and Habitats filter
  • Coastal Processes (1) Apply Coastal Processes filter
  • Landforms (1) Apply Landforms filter

Filter by Proponent:

  • Main Roads Western Australia (2) Apply Main Roads Western Australia filter
  • Public Transport Authority (2) Apply Public Transport Authority filter
  • Albemarle Lithium Pty Ltd (1) Apply Albemarle Lithium Pty Ltd filter
  • API Management Pty Limited (1) Apply API Management Pty Limited filter
  • Cable Sands (WA) Pty Ltd (1) Apply Cable Sands (WA) Pty Ltd filter
  • Cameco Australia Pty Ltd (1) Apply Cameco Australia Pty Ltd filter
  • Canal Rocks Pty Ltd (1) Apply Canal Rocks Pty Ltd filter
  • Commissioner of Railways (1) Apply Commissioner of Railways filter
  • Grange Resources Limited (1) Apply Grange Resources Limited filter
  • Iluka Resources Limited (1) Apply Iluka Resources Limited filter
  • Keysbrook Leucoxene Pty Ltd (1) Apply Keysbrook Leucoxene Pty Ltd filter
  • Kimberley Agricultural Investment Pty Ltd (1) Apply Kimberley Agricultural Investment Pty Ltd filter
  • Lanco Resources Australia Pty Ltd (1) Apply Lanco Resources Australia Pty Ltd filter
  • Lowe Pty Ltd (1) Apply Lowe Pty Ltd filter
  • Marubeni Corporation and Water Corporation of Western Australia (1) Apply Marubeni Corporation and Water Corporation of Western Australia filter
  • Metropolitan Redevelopment Authority (1) Apply Metropolitan Redevelopment Authority filter
  • Pardoo Beef Corporation Pty Ltd (1) Apply Pardoo Beef Corporation Pty Ltd filter
  • Robe River Mining Company Pty. Ltd. (1) Apply Robe River Mining Company Pty. Ltd. filter
  • Sinosteel Midwest Corporation Limited (1) Apply Sinosteel Midwest Corporation Limited filter
  • Tiwest Joint Venture (1) Apply Tiwest Joint Venture filter
  • Toro Energy Limited (1) Apply Toro Energy Limited filter
  • Trustees of the Christian Brothers Inc (1) Apply Trustees of the Christian Brothers Inc filter
  • Wesfarmers Sugar Company Pty Ltd (1) Apply Wesfarmers Sugar Company Pty Ltd filter

Filter by region:

  • Perth (8) Apply Perth filter
  • South West (4) Apply South West filter
  • Kimberley (3) Apply Kimberley filter
  • Mid West (3) Apply Mid West filter
  • Pilbara (3) Apply Pilbara filter
  • Great Southern (2) Apply Great Southern filter
  • Wheatbelt (2) Apply Wheatbelt filter

Filter by last updated:

  • 2022 (2) Apply 2022 filter
  • 2021 (1) Apply 2021 filter
  • 2020 (1) Apply 2020 filter
  • 2019 (4) Apply 2019 filter
  • 2018 (2) Apply 2018 filter
  • 2017 (1) Apply 2017 filter
  • 2016 (2) Apply 2016 filter
  • 2014 (1) Apply 2014 filter
  • 2013 (2) Apply 2013 filter
  • 2011 (2) Apply 2011 filter
  • 2010 (1) Apply 2010 filter
  • 2006 (2) Apply 2006 filter
  • 2005 (1) Apply 2005 filter
  • 2002 (1) Apply 2002 filter
  • 1996 (1) Apply 1996 filter
  1. Home
  2. Proposal search
  3. Inland Waters Environmental Quality
  4. Hydrological Processes
  5. Social Surroundings
  6. Terrestrial Environmental Quality
  7. Ministerial Statement published

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Thornlie-Cockburn Link

Last updated: May 4, 2022

The Public Transport Authority (PTA) proposes to construct and operate a new 14.5 kilometre (km) dual railway track to extend the existing Thornlie passenger line to Cockburn Central Station on the Mandurah line and duplicate the existing 3 km of single track between Beckenham Junction and Thornlie Station. The proposal requires the relocation of 11 km of freight line within the existing rail reserve. The proposal requires the construction and operation of two new stations at Ranford and... Read more...

Albemarle Kemerton Plant

Last updated: March 14, 2022

Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...

Carlton Plain - Stage 1

Last updated: September 1, 2021

Kimberley Agricultural Investment (KAI) Pty Ltd proposes to develop 3086 hectares of land for the purposes of perennial and annual cropping, including grains, cotton and horticulture (which may include citrus and/or mango trees or other tree crops). The proposal is located between House Roof Hill and the Ord River, approximately 40 kilometres north-west of Kununurra, in the Shire of Wyndham-East Kimberley. Carlton Plains Stage 1 forms the initial component of the staged development of four... Read more...

Yanchep Rail Extension: Part 1 – Butler to Eglinton

Last updated: October 12, 2020

The Public Transport Authority (PTA) proposes to extend the existing Joondalup railway line by 7.3 kilometres from Butler Station to the suburb of Eglinton in the City of Wanneroo. The proposal is to construct and operate the rail extension and includes two new intermodal (rail, bus, ‘park and ride’, ‘kiss and ride’, walk and cycle) transit stations at Alkimos and Eglinton. The PTA will operate train services between Perth and Eglinton Stations and bus services from the Alkimos and Eglinton... Read more...

Keysbrook Mineral Sands Mine

Last updated: October 14, 2019

The proposal involves the excavation and processing of a low-grade (2.7%) heavy mineral sands deposit near Keysbrook to produce 920,000 tonnes of Heavy Mineral Concentrate (HMC) over 8 years. An area of 30 hectares (ha) would be progressively mined at any time. Topsoil would be removed and stockpiled for use in rehabilitation. The ore would be excavated and unloaded into a dump hopper located on the pit floor. The ore would be conveyed to a screening plant where oversize material would be... Read more...

Remediation of Midland Railway Workshops site (s46)

Last updated: June 28, 2019

Read more...

Weld Range Iron Ore Project (S46) [2205]

Last updated: June 21, 2019

Read more...

Coastal Road from Lancelin to Cervantes

Last updated: January 7, 2019

Read more...

Roe Highway Stage 8 Extension

Last updated: December 12, 2018

The proposal is to construct and operate a dual carriageway road from the current terminus of Roe Highway at Kwinana Freeway in Jandakot to Stock Road in Coolbellup., Note:, The decision of the Supreme Court of Western Australia in, Save Beeliar Wetlands (Inc) and Anor v. Jacob, [2015] WASC 482 was overturned by the Court of Appeal on Friday 15 July 2016 in, Access the Court of Appeal decision, Jacob v Save Beeliar Wetlands (Inc), [2016] WASCA 126. The effect of the Court of Appeal decision is... Read more...

Pardoo Irrigated Agriculture Project – Stage 3

Last updated: July 25, 2018

Pardoo Beef Corporation Pty Ltd proposes to develop a centre-pivot irrigated feed crop production facility. Centre-pivot irrigation is a method of crop irrigation in which equipment rotates around a pivot and crops are watered with sprinklers. The proposal is approximately 100km east-northeast of Port Hedland and 365km south west of Broome. The proposal is for stage 3 and would include a total disturbance of 368 hectares development envelope. Read more...

Yeelirrie Uranium Project

Last updated: January 16, 2017

The proposal is to mine uranium ore from the Yeelirrie deposit, approximately 70 km south-west of Wiluna, and the construction of associated mine infrastructure, including ore processing facilities, water (includes borefield and corridors) abstraction and reinjection infrastructure, roads, accommodation, offices and workshops, stockpile and laydown areas and evaporation pond. Tailings would be discharged into the mine open pit. Read more...

Bunbury Berth 14A Expansion Project

Last updated: December 6, 2016

The proposal is to construct and operate a coal handling and export facility within the Bunbury Port Inner Harbour in the south-west region of Western Australia. Read more...

Wiluna Uranium Project

Last updated: November 17, 2016

The proposal is to construct and operate a uranium mine consisting of two deposits Centipede and Lake Way at mining tenements M53/224 and MLA53/1090, located approximately 30 kilometres south and 15 kilometres south-east of Wiluna. Read more...

West Angelas Iron Ore Project

Last updated: January 16, 2014

The proposal is for the development of an iron ore mine at deposits 'A' and 'B' and ore processing operation at West Angelas 130 kilometres west of Newman, and construction of a rail line and expansion of port facilities at Cape Lambert. Read more...

Bayonet Head Outline Development Plan

Last updated: August 9, 2013

Plan for the future urban development and conservation of Lots 37, 38 and Part Lot 39 Elizabeth Street, Lots 2, 3, and 286 Alison Parade, Lot 1000, 1001 and Part Lot 42 Lower King Road, Part Lot 1 Yatana Road, Location 476 Sibbald Road and Lot 0 Bayonet Head, within the Bayonet Head Outline Development Plan Area (as defined in City of Albany Town Planning Scheme No. 3). Read more...

Anketell Point Port Development, Antonymyre, Shire of Roebourne

Last updated: January 30, 2013

The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...

Gwindinup Mineral Sands Mine

Last updated: November 24, 2011

The proposal is for the construction and operation of a mineral sands mine at Gwindinup, approximately 25 kilometres south-south-east of Bunbury and between two and ten kilometres south of the town of Boyanup. Read more...

Albany Iron Ore Project - Southdown Magnetite Proposal

Last updated: November 22, 2011

The proposal involves the construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Read more...

Smiths Beach Development, Sussex Location 413 Yallingup

Last updated: June 15, 2010

The strategic proposal is to: extend the Leeuwin Naturaliste National Park into the western part of Sussex Location 413; and develop the eastern part of Sussex Location 413 for tourism and residential purposes with associated public open space and foreshore reserves as generally depicted on the Development Guide Plan. Read more...

Mineral Sands Mine, Gingin

Last updated: October 31, 2006

The proposal involves the construction and operation of an approximately 2.8 million tonnes per annum mineral sands mine and concentrator plant on part Swan Location 128, 354 & 508, Lot 2; part Swan Location 128 & 340, Lot 3; part Swan Location 128, 354, 355, 506, Lot 9; Swan Location 506; portion of each of Swan Locations 354 & 508, Lot 1 and part Swan Location 511 & 536, Lot 7, near the intersection of Brand Highway and Dewar Road, approximately 2.5 kilometres north-west of... Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2023 Government of Western Australia. All rights reserved.