Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • EPA Board Meetings
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • (-) Remove Industrial filter Industrial
  • Infrastructure (14) Apply Infrastructure filter
  • Iron Ore (5) Apply Iron Ore filter
  • Land use (3) Apply Land use filter
  • Oil and gas (2) Apply Oil and gas filter
  • Clearing (1) Apply Clearing filter
  • Coal (1) Apply Coal filter
  • Gold (1) Apply Gold filter
  • Mineral sands (1) Apply Mineral sands filter
  • Waste management (1) Apply Waste management filter

Filter by current status:

  • Ministerial Statement published (101) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (13) Apply Decision on whether to assess has been published filter
  • EPA Report and Recommendations released - not appealable (3) Apply EPA Report and Recommendations released - not appealable filter
  • Proposal withdrawn (2) Apply Proposal withdrawn filter
  • Seven-day public comment period open (2) Apply Seven-day public comment period open filter
  • Assessment on Proponent Information – public submission period closed (1) Apply Assessment on Proponent Information – public submission period closed filter
  • Awaiting Ministerial decision (1) Apply Awaiting Ministerial decision filter
  • Environmental Scoping Document - public submission period closed (1) Apply Environmental Scoping Document - public submission period closed filter
  • EPA Report and Recommendations released - appeals closed (1) Apply EPA Report and Recommendations released - appeals closed filter
  • Minister determined that the proposal should not be implemented (1) Apply Minister determined that the proposal should not be implemented filter
  • Public Environmental Review document in preparation (1) Apply Public Environmental Review document in preparation filter
  • Seven-day public comment period closed (1) Apply Seven-day public comment period closed filter

Filter by preliminary environmental factors:

  • Air Quality (45) Apply Air Quality filter
  • Social Surroundings (42) Apply Social Surroundings filter
  • Flora and Vegetation (29) Apply Flora and Vegetation filter
  • Terrestrial Fauna (22) Apply Terrestrial Fauna filter
  • Inland Waters Environmental Quality (20) Apply Inland Waters Environmental Quality filter
  • Marine Environmental Quality (20) Apply Marine Environmental Quality filter
  • Terrestrial Environmental Quality (18) Apply Terrestrial Environmental Quality filter
  • Hydrological Processes (13) Apply Hydrological Processes filter
  • People (9) Apply People filter
  • Benthic Communities and Habitats (8) Apply Benthic Communities and Habitats filter
  • Marine Fauna (8) Apply Marine Fauna filter
  • Human Health (7) Apply Human Health filter
  • Inland Waters (7) Apply Inland Waters filter
  • Coastal Processes (4) Apply Coastal Processes filter
  • Greehouse Gas Emissions (4) Apply Greehouse Gas Emissions filter
  • Landforms (3) Apply Landforms filter
  • Subterranean Fauna (3) Apply Subterranean Fauna filter
  • Air (1) Apply Air filter

Filter by Proponent:

  • Australian Gold Reagents Pty Ltd (10) Apply Australian Gold Reagents Pty Ltd filter
  • Albemarle Lithium Pty Ltd (3) Apply Albemarle Lithium Pty Ltd filter
  • Alcoa of Australia Ltd (3) Apply Alcoa of Australia Ltd filter
  • CSBP Limited (3) Apply CSBP Limited filter
  • Simcoa Operations Pty Ltd (3) Apply Simcoa Operations Pty Ltd filter
  • Wespine Industries Pty Ltd (3) Apply Wespine Industries Pty Ltd filter
  • Alcoa of Australia Limited (2) Apply Alcoa of Australia Limited filter
  • Alcoa World Alumina Australia (2) Apply Alcoa World Alumina Australia filter
  • Austral Bricks Pty Ltd (2) Apply Austral Bricks Pty Ltd filter
  • Australian Refractory Ceramics Pty Ltd (2) Apply Australian Refractory Ceramics Pty Ltd filter
  • Barrack Mines Limited (2) Apply Barrack Mines Limited filter
  • ICI Australia Operations Pty Ltd (2) Apply ICI Australia Operations Pty Ltd filter
  • Kingstream Resources NL (2) Apply Kingstream Resources NL filter
  • LandCorp (2) Apply LandCorp filter
  • NW Interconnected Power Pty Ltd (2) Apply NW Interconnected Power Pty Ltd filter
  • Tiwest Joint Venture (2) Apply Tiwest Joint Venture filter
  • Water Corporation (2) Apply Water Corporation filter
  • Wesfarmers CSBP Ltd (2) Apply Wesfarmers CSBP Ltd filter
  • Western Australian Land Authority (trading as DevelopmentWA) (2) Apply Western Australian Land Authority (trading as DevelopmentWA) filter
  • Worsley Alumina Pty Ltd (2) Apply Worsley Alumina Pty Ltd filter
  • Yara Pilbara Fertilisers Pty Ltd (2) Apply Yara Pilbara Fertilisers Pty Ltd filter
  • Apache Northwest Pty Ltd (1) Apply Apache Northwest Pty Ltd filter
  • Australian Methanol Company Pty Ltd (1) Apply Australian Methanol Company Pty Ltd filter
  • Benale Pty Ltd (1) Apply Benale Pty Ltd filter
  • BHP Billiton Iron Ore Pty Ltd (1) Apply BHP Billiton Iron Ore Pty Ltd filter
  • BHP Billiton Petroleum Pty Ltd (1) Apply BHP Billiton Petroleum Pty Ltd filter
  • BHP Iron Ore Pty Ltd (1) Apply BHP Iron Ore Pty Ltd filter
  • Burrup Fertilisers Pty Ltd (1) Apply Burrup Fertilisers Pty Ltd filter
  • Burrup Nitrates Pty Ltd (1) Apply Burrup Nitrates Pty Ltd filter
  • CSR Gyprock Fibre Cement (1) Apply CSR Gyprock Fibre Cement filter
  • Department of Commerce and Trade (1) Apply Department of Commerce and Trade filter
  • Department of Defence (1) Apply Department of Defence filter
  • Eastern Metropolitan Regional Council (1) Apply Eastern Metropolitan Regional Council filter
  • Esperance Port Authority (1) Apply Esperance Port Authority filter
  • Grange Resources Limited (1) Apply Grange Resources Limited filter
  • HIsmelt (Operations) Pty. Limited (1) Apply HIsmelt (Operations) Pty. Limited filter
  • Methanex Corporation (1) Apply Methanex Corporation filter
  • Midland Brick Company Pty Ltd (1) Apply Midland Brick Company Pty Ltd filter
  • Mr G J Johnson (1) Apply Mr G J Johnson filter
  • Port Hedland Port Authority (1) Apply Port Hedland Port Authority filter
  • Prestige Brick (1) Apply Prestige Brick filter
  • Rhone-Poulenc Chimie Australia Pty Ltd (1) Apply Rhone-Poulenc Chimie Australia Pty Ltd filter
  • State Energy Commission of Western Australia (1) Apply State Energy Commission of Western Australia filter
  • State Energy Commission of Western Australia (SECWA) (1) Apply State Energy Commission of Western Australia (SECWA) filter
  • SubSea International Australia Inc (1) Apply SubSea International Australia Inc filter
  • Tiwest Joint Venture Pty Ltd (1) Apply Tiwest Joint Venture Pty Ltd filter
  • Water Authority of Western Australia (1) Apply Water Authority of Western Australia filter
  • Western Mining Corporation Limited (1) Apply Western Mining Corporation Limited filter
  • Western Power Corporation (1) Apply Western Power Corporation filter
  • Whitecrest Enterprises Pty Ltd (1) Apply Whitecrest Enterprises Pty Ltd filter

Filter by region:

  • Perth (54) Apply Perth filter
  • South West (32) Apply South West filter
  • Pilbara (23) Apply Pilbara filter
  • Wheatbelt (7) Apply Wheatbelt filter
  • Great Southern (5) Apply Great Southern filter
  • Goldfields Esperance (4) Apply Goldfields Esperance filter
  • Mid West (4) Apply Mid West filter
  • Peel (4) Apply Peel filter
  • Gascoyne (1) Apply Gascoyne filter
  • Kimberley (1) Apply Kimberley filter

Filter by last updated:

  • 2023 (1) Apply 2023 filter
  • 2022 (11) Apply 2022 filter
  • 2021 (7) Apply 2021 filter
  • 2020 (7) Apply 2020 filter
  • 2019 (5) Apply 2019 filter
  • 2018 (2) Apply 2018 filter
  • 2017 (1) Apply 2017 filter
  • 2016 (5) Apply 2016 filter
  • 2015 (3) Apply 2015 filter
  • 2013 (1) Apply 2013 filter
  • 2012 (3) Apply 2012 filter
  • 2010 (3) Apply 2010 filter
  • 2009 (1) Apply 2009 filter
  • 2007 (2) Apply 2007 filter
  • 2006 (3) Apply 2006 filter
  • 2005 (8) Apply 2005 filter
  • 2004 (1) Apply 2004 filter
  • 2003 (1) Apply 2003 filter
  • 2002 (7) Apply 2002 filter
  • 2001 (3) Apply 2001 filter
  • 2000 (1) Apply 2000 filter
  • 1999 (3) Apply 1999 filter
  • 1998 (3) Apply 1998 filter
  • 1997 (6) Apply 1997 filter
  • 1996 (4) Apply 1996 filter
  • 1995 (5) Apply 1995 filter
  • 1994 (3) Apply 1994 filter
  • 1993 (3) Apply 1993 filter
  • 1992 (4) Apply 1992 filter
  • 1991 (6) Apply 1991 filter
  • 1990 (6) Apply 1990 filter
  • 1989 (6) Apply 1989 filter
  • 1988 (8) Apply 1988 filter
  • 1987 (1) Apply 1987 filter
  1. Home
  2. Proposal search
  3. Industrial

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Narrogin FutureEnergy Park

Last updated: January 25, 2023

FutureEnergy Australia is proposing to construct and operate a biorefinery processing plant to produce a renewable biodiesel. The proposed proposal is located on Lot 31 on Plan 404104, Narrogin, within the shire of Narrogin, Western Australia. The proposal includes a biorefinery plant, a feedstock receival area, woodchip drying beds, and supporting infrastructures. The biorefinery plant will utilize waste lignocellulose biomass as feedstock which will undergo pyrolysis followed by non-catalytic... Read more...

Project Haber

Last updated: December 16, 2022

Project Haber Pty Ltd proposes to construct and operate a 1.4 million tonnes per annum (Mtpa) urea plant in East Arrowsmith (South Erregulla). The proposal is located approximately 280 km north of Perth and 45 km south east of Dongara, in the Shire of Three Springs. The urea plant comprises of an Air Separation Unit (ASU) producing nitrogen, oxygen and hydrogen for various processes; an ammonia synthesis unit; and a granulation and urea production unit. Supporting infrastructure includes gas... Read more...

Pinjarra Alumina Refinery Revised Proposal

Last updated: November 24, 2022

Alcoa of Australia Limited is proposing to increase production at the Pinjarra Alumina Refinery (the refinery) and increase the rate of bauxite mining at the existing Huntly Mine within Mineral Lease 1SA (ML1SA) to supply 2.5 million tonnes per annum (Mtpa) bauxite, for export to third party customers. The Proposal comprises the following components: an increase in alumina production at the refinery by 5 percent, from 5.0 Mtpa to 5.25 Mtpa; A transition of the Huntly mine into the Myara North... Read more...

Kemerton Strategic Industrial Area (KSIA)

Last updated: October 5, 2022

DevelopmentWA is seeking to develop the Kemerton Strategic Industrial Area (KSIA) for the purpose of industrial and infrastructure development as a strategic proposal. The KSIA is located within the Shire of Harvey, 17 kilometres north of Bunbury. The KSIA key characteristics are: Development of the Kemerton Strategic industry Zone (Industry Core) which is approximately 2,024 hectares (ha). There is an approximate 50-year time period for development. Ultimate land use proposed is to be heavy... Read more...

Sodium Cyanide Plants (Liquid and Solid) at Kwinana and Transport of Sodium Cyanide by Road and Rail from Kwinana

Last updated: August 23, 2022

Australian Gold Reagents Pty Ltd propose to increase production at the existing Kwinana sodium cyanide liquid plant from 91,000 tonnes per annum (tpa) to a total of 110,000 tpa; and to increase production of solid sodium cyanide from 45,000 tpa up to 60,000 tpa. The proposal also includes connecting the two existing thermal combustion units to allow waste gas from either plant during down time to be directed through a combined header to the operational thermal combustion unit for effective... Read more...

Ammonia Plant, Murujuga (Burrup Peninsula), Renewable Hydrogen Project

Last updated: August 4, 2022

Yara Pilbara Fertilisers Pty Ltd propose to modify the existing Pilbara Fertiliser project to include the development of a Renewable Hydrogen Plant and associated infrastructure. The proposal is located approximately 11 km north-west of Karratha in the Pilbara region of Western Australia. The proposal is adjacent to the National Heritage listed area and the Murujuga National Park. The proposal would include a total disturbance of 24.78 hectares. The proposal will result in reduction of... Read more...

Kemerton General Industrial Area

Last updated: June 7, 2022

DevelopmentWA proposes to subdivide Lot 40 (No. 217) Devlin Road, Wellesley (Shire of Harvey) into approximately 34 lots to facilitate future industrial development. Areas of the Marriott Road reserve (Lots 41 & 42) are also proposed to be cleared to facilitate the safe movement of vehicles to and from the site and for upgrading of electrical services. The proposal would include a total development envelope of 119 hectares, including proposed clearing of up to 27.1 hectares of native... Read more...

Ammonia Plant, Burrup Peninsula (S46) [2334]

Last updated: April 11, 2022

Change existing Condition 7 of Ministerial Statement 586 so that it is adequate with respect to avoiding, reducing, and offsetting greenhouse gas emissions. Read more...

Albemarle Kemerton Plant (S46) [2296]

Last updated: March 15, 2022

The requested change relates to changing condition 9 in order to contemporise the condition with the Environmental Factor Guideline – Greenhouse Gas (GHG) Emissions (EPA 2020) Read more...

Albemarle Kemerton Plant

Last updated: March 14, 2022

Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...

Dredging at Finucane Island, BHP Billiton RGP5 Project, Port Hedland

Last updated: January 25, 2022

Dredging of approximately 3,900,000 cubic metres of material for two new berth pockets and extensions to the existing departure channel and swing basin at Harriet Point and Stanley Point; disposal of dredged material at dredged material management areas. Read more...

Perdaman Urea Project

Last updated: January 24, 2022

Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. The EPA considered the Study of the Cumulative Impacts of Air Emissions in the Murujuga Airshed in its assessment of the Perdaman Urea Project. Read more...

Chloride Process Pigment Plant Kemerton and Operations at Australind (S46) [2025]

Last updated: December 6, 2021

Read more...

Albemarle Kemerton Plant (s46) [2230]

Last updated: October 28, 2021

Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...

Silicon Project, Kemerton and Mine at Moora - Revised Proposal

Last updated: August 9, 2021

The original proposal is for mining of silica (quartzite) rock approximately 15 kilometres north of Moora on Mining Lease M70/191, and smelting to produce silicon, employing wood, charcoal, coal and the silica mined at Moora, in the Kemerton Industrial Area approximately 20 kilometres north of Bunbury in the Shire of Harvey. This revised proposal is for an increase from the approved three submerged electric arc furnaces to four submerged electric arc furnaces at the Kemerton site, and the... Read more...

CBH Kwinana Fertiliser Project

Last updated: July 15, 2021

Co-operative Bulk Handling Ltd (CBH) propose to develop a facility for the import and storage of dry (granular) and liquid urea ammonium nitrate (UAN) fertiliser products. The proposal consists of onshore and offshore components and is located adjacent and within the existing Rockingham Industrial Zone (RIZ). The offshore component will extend into the southern Cockburn Sound. The proposal involves the construction of a dedicated liquid (UAN) pipeline that will follow the alignment of the... Read more...

Industrial Infrastructure and Harbour Development, Jervoise Bay

Last updated: May 25, 2021

The proposal is to construct industrial infrastructure and a Southern Harbour in Jervoise Bay south of the Northern Harbour precinct and including the Marine support facility. Read more...

Munglinup Graphite Project

Last updated: May 10, 2021

The Munglinup Graphite Project is located in the South Coast region of Western Australia, approximately 105km west of Esperance, 85km east of Ravensthorpe and 4km north on Munglinup. MRC Graphite Pty Ltd propose to extract graphite from up to six open pits. The proposal will also include a processing plant, tailings storage facility, waste rock landforms, and associated infrastructure. The proposal would include a total disturbance of 350 hectares. Read more...

Lake Wells Potash Project

Last updated: February 1, 2021

Australian Potash Limited proposes to abstract brine resources to produce a sulfate of potash (SOP) product at the Lake Wells Potash Project. The proposal area is located on and adjacent to the Lake Wells Playa Lake system (salt lake terrain), approximately 160km north-northeast of Laverton in Western Australia. The proposal would include construction of an SOP processing plant, brine abstraction bores, evaporation ponds, raw water bore field, accommodation village and other associated... Read more...

Cardup Brickworks Redevelopment

Last updated: November 30, 2020

Austral Bricks is proposing the redevelopment of the Cardup Brickworks, which includes the expansion of the existing factory, increasing the design capacity from 200,000 to 250,000 tonnes per annum.  The site is located in the southern extremity of Byford.  Additional ancillary improvements include the installation of a new baghouse scrubber and a new primary crusher located in the floor of the pit.  The proposal would include:  Expanding the capacity from 200,000 to 250,000 tonnes per annum; ... Read more...

Pages

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2023 Government of Western Australia. All rights reserved.