This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 19, 2024
WA Offshore Windfarm Pty Ltd is proposing the construction, operation and decommissioning of the Western Australian Offshore Windfarm project. The project will be located approximately 5.5 km off the coast between Preston Beach and Myalup and will have a generation capacity of up to 300 MW. The Project will comprise up to 37 offshore wind turbine generators (WTGs) with supporting offshore and onshore electrical assets to transfer energy generated by the windfarm to the existing electricity... Read more...Last updated: October 14, 2024
Perpetual Resources Limited propose to develop a silica sand mine in the Geraldton Sandplain bioregion of Western Australia, approximately 300 km north of Perth. The proposal would include a total disturbance of 590 hectares of native vegetation and will involve sequential mining of sand above the water table. 100 ha will be cleared within the first two years followed by annual clearing of 20 ha cells and progressive rehabilitation of mined cells. Vegetation and topsoil will be stockpiled for... Read more...Last updated: September 13, 2024
The Shire of Serpentine Jarrahdale proposes to extract gravel from a twelve hectare area known as the Scrivener Road Gravel Reserves. The reserves are located at the top of the scarp south of Serpentine and contain nesting habitat for all three protected black cockatoo species. Extraction is proposed in two hectare stages over a period of thirteen years. Read more...Last updated: May 9, 2024
The proposal is for the development of eco-friendly tourism accommodation including holiday units, a restaurant/function centre, and associated facilities, at Lot 660 La Perouse Court, Goode Beach. The proposed development envelope is 7.71 hectares (ha) and includes a 2.23 ha clearing footprint, a 0.402 ha wastewater reticulation zone, and a 5.02 ha conservation area. The proposal is located approximately 50m west of the Goode Beach foreshore and immediately east of Lake Vancouver, a... Read more...Last updated: February 28, 2024
The, Southern Forest Irrigation Scheme, proposal involves taking water from the Donnelly River to irrigate land for horticultural and agricultural production in the southern forests region around Manjimup and Pemberton. The proposal is to construct and operate a water offtake (pump station) adjacent to the Donnelly River, a reservoir on Record Brook (a tributary of the Donnelly River), two header dams and a network of distribution water pipelines and associated infrastructure to supply water to... Read more...Last updated: February 19, 2024
The requested change relates to condition 3 of Ministerial Statement 1056 (as relevant to Ministerial Statement 891) for an extension to the Time Limit for Proposal Implementation for the proposal approved under MS 891. With the agreement of the proponent, the Environmental Protection Authority will take no further action in relation to the s.46 inquiry into the proposed changes to condition 3 of Ministerial Statement 1056 (as relevant to Ministerial Statement 891) Read more...Last updated: December 12, 2023
The referred proposal is for a change in the use, purpose and condition of land within the Gnangara, Pinjar and Yanchep pine plantations from commercial pine plantation managed for the purpose of timber production to a combination of new uses, purposes and conditions other than pine plantations. The change in the use, purpose and condition of land occurs through the progressive harvesting of pine without replacement and post-harvesting land management. The change in the use, purpose and... Read more...Last updated: October 18, 2023
Pilbara Energy (Generation) Pty Ltd proposes to construct and operate the Uaroo Renewable Energy Hub on the Uaroo and Emu Creek Pastoral Stations located 120 kilometres south of Onslow, in the Pilbara region of Western Australia. The proposal is to construct and operate a renewable energy generation hub to power Fortescue Metals Group Limited’s mining operations in the Pilbara. The proposal will generate electricity (up to 5.4 gigawatts) from up to 340 wind turbine generators and a solar farm.... Read more...Last updated: June 14, 2023
Remove Condition 2 (Proponent Commitments) if the proponent commitments in schedule 2 have been completed, are no longer relevant to the proposal or can be managed under Part V of the Environmental Protection Act 1986 (EP Act)., The EPA, in response to a request by the Water Corporation and pursuant to s40A of the EP Act, has terminated the inquiry under s46 of the EP Act into changing the implementation conditions of Ministerial Statement 568 Read more...Last updated: June 2, 2023
The proposal is to undertake an onshore three-dimensional (3D) seismic survey in the northern Perth Basin. The survey area is about 300 kilometres (km) north of Perth, and its nearest boundary is about 4.5 km north of the town of Eneabba and about 25 km southeast of the town of Dongara. The survey area is situated within four local shires: Shire of Irwin, Shire of Three Springs, Shire of Mingenew and Shire of Carnamah. The intent of the Zemira 3D Seismic Survey is to collect a high-quality 3D... Read more...Last updated: May 11, 2023
The proposal to develop Lot 4 Underwood Avenue was originally approved for implementation by the Minister for Environment and published Ministerial Statement 835 (MS 835) on 14 July 2010. The proposal has not substantially commenced. The proponent subsequently requested a change to condition 3 – Time limit for proposal implementation of MS 835 by requesting an extension of time limit for substantial commencement. Read more...Last updated: January 18, 2023
The proposal is to realign a 2 - 3 kilometre (km) section of Yardie Creek Road, Shire of Exmouth. The realignment will be about 1 km south of the existing road and to the south of the Vlamingh Head Lighthouse and Ningaloo Lighthouse Holiday Park. A new southern access road to Vlamingh Head Lighthouse is also proposed. The resulting road will be a 9 m pavement with associated drains, culverts and safety barriers where required. The alignment and design of the road is yet to be finalised with... Read more...Last updated: December 19, 2022
Wasterock Pty Ltd and Hazelland Pty Ltd propose to remediate a historical inert landfill located at Lot 20 Adelaide Street Hazelmere for future commercial use. The proposal would involve recontouring the existing site and capping it with clean fill. Read more...Last updated: July 8, 2022
Theia Energy No.1 Pty Ltd (the Proponent) proposes to drill two exploration wells (one vertical and one horizontal) and undertake hydraulic fracture stimulation of the horizontal well within Petroleum Exploration Permit EP493 located in the Canning Basin, 155km South-east of Broome. The Proposal involves an extension of the existing well site and camp site, drilling of two exploration wells (Theia-2V and Theia-3H), hydraulic fracture stimulation (HFS) and flow-test of Theia-3H. The Proposal... Read more...Last updated: August 24, 2021
Image Resources NL is seeking to develop a mineral sands project, located at Nambung, approximately 170 kilometres (km) north of Perth and 18 km east of Cervantes, in the Wheatbelt region of WA. The proposal includes the progressive development of mine pits, processing facilities, groundwater bores and water management infrastructure, temporary waste dumps, solar drying ponds and associated infrastructure. The proposal would require the clearing of up 320 hectares of native vegetation. Read more...Last updated: August 9, 2021
Leichhardt Industrials Pty Ltd (Leichhardt) is seeking to develop a salt production and export operation in the Cape Preston East area, approximately 55 kilometres (km) westsouth-west of Karratha in Western Australia (WA). The proposal will utilise seawater and evaporation to produce concentrated salt products for export. The proposal includes the development of a series of concentrator and crystalliser ponds, processing plant, product pipeline and offshore export facility (offshore pylon wharf... Read more...Last updated: July 28, 2021
Hanson Australia Pty Ltd (formerly Rocla Pty Ltd) proposes to extract sand within Bush Forever Site 390, on mining tenements M70/1142 and M70/1088 approximately 20km South of Perth at Lot 467 Jandakot Road, Banjup (City of Cockburn). The proposal would include: - a development envelope of 9.56 hectares (ha), including 5.63 ha that has been historically cleared; - clearing of 3.93 ha of native vegetation; - sand extraction of 300,000 tonnes over a period of approximately three years; - dry... Read more...Last updated: May 12, 2021
The proposal is for an open cut mine that will operate over approximately six years and will extract over 2.1 million tonnes (Mt) of heavy mineral concentrate (HMC) (mostly zircon and titanium minerals) from the IPL North mineral deposit. Ore will undergo initial onsite processing to produce HMC. Mining will commence at the most southern end of the deposit and progress to the north. It is expected that mining will occur 24 hours/day for the majority of the proposal. Read more...Last updated: December 2, 2020
Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to six wells in a region of the Canning Basin that has been previously surveyed and explored for petroleum purposes. The proposal is... Read more...Last updated: June 3, 2020
UIL Energy Ltd proposes to conduct a 2D seismic survey within exploration permits 447, 488 and 489 near the town of Badgingarra (Shire of Dandaragan). The proposal would involve clearing of up to 24 hectares of native vegetation within a proposal area of 101,813 hectares. Clearing will occur within Badgingarra National Park, Wongonderrah and Twyata Nature Reserve, unallocated Crown Land, road reserves, and private properties. Read more...