This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 16, 2020
BHP Billiton Nickel West (BHPB) proposes to develop the Mt Keith Satellite Project (the proposal), to the existing Mount Keith Mining Operations. The proposal is located approximately 80 km north of Leinster in the Shire of Leonora. The proposal includes clearing of up to 842 hectares of native vegetation (which is also fauna habitat) for two open pits, a Waste Rock Landform and a transport corridor, with minor ancillary infrastructure to support the mining process. Read more...Last updated: September 16, 2020
This proposal involves the recommencement and expansion of mining at the Telfer Gold Mine to include the mining and processing of 400 million tonnes of gold ore at a rate of up to 23 million tonnes per annum, and the transport of copper concentrate to Port Hedland by road. Key components of the expansion include: expansion of existing underground mining areas and deepening of the existing open pits; extensions to the existing southern waste rock dump and several other dumps; construction of a... Read more...Last updated: September 10, 2020
The Tims Thicket Waste Management Facility is located approximately 15 km south of Mandurah. The Site covers an area of 28 hectares. The Site has been in operation since 1995. The proposal seeks to recommence acceptance of liquid waste at the facility by implementing a suite of improvements, including refurbishing and repurposing the existing infrastructure. The proposed design capacity is up to 6500 kL of liquid waste per year, consisting of septage and grease trap waste., s43A Change to... Read more...Last updated: August 12, 2020
The proposal is for dredging of not more than 3,500,000 cubic metres off Anderson Point, for a third ship berth; disposal of dredge spoil on preexisting and previously approved land at Anderson Point; and extension of the approved open-pile wharf. Read more...Last updated: August 6, 2020
Section 46 change to conditions - Inquire into the suitability of the implementation conditions and whether any of them should be changed. Read more...Last updated: August 6, 2020
Change to Extension of Timeframe for substantial commencement. Read more...Last updated: July 23, 2020
Change to condition 1 commitment 39 of Ministerial Statement 308 in order to consider the change of distance to the nearest sensitive receptor. Read more...Last updated: July 23, 2020
Changes to Condition 3 in order to extend the Time Limit of Authorisation for commencement of the proposal. Read more...Last updated: July 23, 2020
Change to condition 3 to extend the authorised timeframe for substantial commencement of the proposal by five years, to 12 February 2024. Read more...Last updated: July 21, 2020
Changes to Environmental Commitment 2.2.1 related to condition 1 and condition 3, in order to change the authorised storage capacity of chlorine at the proposed site. Read more...Last updated: July 21, 2020
ACH Minerals proposes to develop the Kundip Mine Site located approximately 17 km south-east of Ravensthorpe in the Shire of Ravensthorpe. The proposal involves the development and operation of a gold and copper mine including open cut and underground mining, processing facilities, waste rock landforms, a tailings storage facility and associated infrastructure. The project will have an 8 year mine life and a disturbance area of 244.7 hectares including 197.8 hectares of native vegetation within... Read more...Last updated: July 9, 2020
Change to Condition 3. Extension to Time Limit for Proposal Implementation. Read more...Last updated: July 9, 2020
Robe River Mining Co. Pty Limited (the proponent) proposes to develop the Mesa H deposit to sustain its iron ore production operations within the Robe Valley, Pilbara. The proposal is located approximately 16 km south west of Pannawonica. The proposal would include a total disturbance of 2,200 hectares to develop above and below water table open cut iron ore pits and associated infrastructure, including water management infrastructure. The proposal is located adjacent to the existing Mesa J... Read more...Last updated: July 1, 2020
Change to Commitment 7.7 (Monitoring) of Condition 1 (Proponent Commitments) Read more...Last updated: June 26, 2020
The proposal is for the development and operation of the Parker Range Project, located in the Mount Caudan section of the Parker Range within the Shire of Yilgarn. It includes the development and operation of an above and below the watertable greenfields iron ore mine and associated infrastructure. An existing gazetted road (Parker Range Road) runs across the ore body. A gazetted bypass road would be required around the proposed mine site requiring approximately 10 ha of clearing. Ore from the... Read more...Last updated: June 24, 2020
Inquiry under Section 46(3) of the, Environmental Protection Act 1986, (EP Act) on CSBP Limited’s (CSBP) proposal to debottleneck their Ammonia Plant from 650 to 745 tonnes per day (tpd). Read more...Last updated: June 18, 2020
Inquiry under s46 into changing the conditions (extension of time limit for proposal implementation) of Ministerial Statements 469, 774, 815 and 927. Read more...Last updated: May 29, 2020
Section 46 - request for a change to Environmental Conditions: Inquire into the commencement of Condition 26 (Reservoir Carbon Dioxide Injection System) of Ministerial Statement 800. Read more...Last updated: May 27, 2020
Changes to conditions 3-1 and 3-2, time limit of authorisation of Ministerial Statement 985 in order to extend the Time Limit of Authorisation. Read more...