This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: July 4, 2024
Audalia Resources Limited (Audalia) is proposing to construct and operate a vanadium, titanium and iron ore mine approximately 100 kilometres (km) west of Norseman, Western Australia (WA). The Medcalf Project, located in the Bremer Range, Lake Johnston region of Western Australia, approximately 470 km east south-east of Perth. The proposal includes three separate open pits and requires up to 650 ha of native vegetation clearing. Mining will occur above groundwater. The proposal includes the... Read more...Last updated: July 4, 2024
Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...Last updated: May 22, 2024
Image Resources NL is seeking to develop a greenfields mineral sands project, located at Nambung, approximately 18 km east of Cervantes in the Wheatbelt region of Western Australia (WA). The proposal includes the progressive development of mine pits, processing facilities, groundwater bores and water management infrastructure, temporary waste dumps, solar drying ponds and associated infrastructure (power supply, communications, workshop, laydown, offices etc.). Two alternative mining methods... Read more...Last updated: April 26, 2024
The proposal is to continue to operate the existing Newmont Boddington Goldmine and associated infrastructure, and to expand the existing operations through widening and deepening of existing pits, and through construction of new waste dumps, residue disposal areas and associated infrastructure. Read more...Last updated: April 24, 2024
The construction, operation and maintenance of a nominal 320 megawatt combined cycle base load power plant at Kwinana, as documented in schedule 1 of the ministerial statement. Read more...Last updated: April 24, 2024
Re-opening of an iron ore mine; construction of associated infrastructure and a port facility on Koolan Island; and subsequent rehabilitation and decommissioning of the site. Read more...Last updated: April 24, 2024
The proposal is for the Stage 2 expansion of the Murrin Murrin Nickel-Cobalt mining and processing operation (Stage 1), 60 kilometres east of Leonora. The Stage 2 expansion includes the mining of additional ore; an expansion of the processing plant to process additional ore; and the development of additional infrastructure associated with mining and processing of the ore. Read more...Last updated: April 22, 2024
The proposal is to operate the Beenyup Wastewater Ocean Outlets into Marmion Marine Park that are associated with the Beenyup Wastewater Treatment Plant and Advanced Water Recycling Plant. Read more...Last updated: April 19, 2024
St Ives Gold Mining Company Pty Limited proposes to expand the existing open-cut and underground gold mining developments with 2,061 hectares (ha) of disturbance. The proposal is located in Lake Lefroy approximately 20 kilometres south east of Kambalda (Shire of Coolgardie). The revised proposal would include an additional disturbance of 5000 ha: additional lake-based disturbance of up to 2,000 ha; and additional land-based disturbance of up to 3,000 ha. Read more...Last updated: April 19, 2024
The Water Corporation submitted a proposal 'Burrup Peninsula Desalinated Water and Seawater Supplies Project' in May 2001 (Water Corporation, 2001a) to service the requirements of new industrial developments on the Burrup Peninsula. The proposed scheme was designed to supply seawater and desalinated water to the Syntroleum Sweetwater Corporation (Syntroleum) gas to liquids plant, with additional capacity to supply one or possibly two other process plants. The EPA released its report (... Read more...Last updated: April 19, 2024
The Public Transport Authority (PTA) proposes to extend the existing Joondalup railway line by 7.3 kilometres from Butler Station to the suburb of Eglinton in the City of Wanneroo. The proposal is to construct and operate the rail extension and includes two new intermodal (rail, bus, ‘park and ride’, ‘kiss and ride’, walk and cycle) transit stations at Alkimos and Eglinton. The PTA will operate train services between Perth and Eglinton Stations and bus services from the Alkimos and Eglinton... Read more...Last updated: April 11, 2024
NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 644,600 ha development envelope, with a... Read more...Last updated: April 3, 2024
This strategic proposal is to identify a development footprint for future industrial development over a 339 hectare area of the Rockingham Industrial Zone, while retaining an area as a conservation reserve. Read more...Last updated: March 26, 2024
Mt Weld Mining Pty Ltd proposes to expand the Mt Weld Mine, which includes the construction and operation of a rare earths mine and processing plant, to its life of mine extent. The expansion proposes to increase the development envelope from the currently approved 505 hectares (ha) to 2,802 ha, to allow for expansion of infrastructure and activities, including: a staged transition from diesel fuelled power generation to gas hybrid renewable (including solar and battery energy storage, and... Read more...Last updated: March 7, 2024
The proposal is to expand CSBP's Kwinana Ammonium Nitrate Production Facility (ANPF) by incorporating additional components into the existing facility and re-engineering (debottlenecking) some existing components in order to increase ammonium nitrate production capacity from 520,000 tpa to 936,000 tpa. Read more...Last updated: March 7, 2024
Hamersley Iron Pty. Limited (a wholly -owned subsidiary of Rio Tinto) proposes the development of a major iron ore mining operation in the central Pilbara region of Western Australia. The development will be centered around its Koodaideri deposits, located 110 kilometres west-north-west of Newman. The Proposal will involve the construction and operation of a greenfields mine and associated infrastructure. Mining will consist of open pits and supporting infrastructure, including a 167 kilometre... Read more...Last updated: February 29, 2024
Woodside Energy Ltd (Woodside) proposes to construct and operate the Woodside Solar Facility in the Maitland Strategic Industrial Area, located approximately 15 kilometres south-west of Karratha, in the Pilbara region of Western Australia. The proposal will generate electricity (up to 500 megawatts) from a large-scale solar photovoltaic (PV) farm and includes energy storage (battery) infrastructure. The Proposal is only for the infrastructure associated with the generation and storage of... Read more...Last updated: February 23, 2024
The proposal, located 280km south east of Halls Creek and 20km west of the Western Australian-Northern Territory border, involves producing approximately 400,000t of ore for gold production from two open pits, Sandpiper and Kookaburra. The ore will be provided for blending with ore from underground mining at the existing operation (Coyote Stage 1). No crushing or processing will be conducted on site and infrastructure will be minimal. Both pits will be mined below the watertable and will not be... Read more...Last updated: February 9, 2024
The proposal includes the existing Cloudbreak iron ore mine and proposed expansion. The existing mine includes open pit strip mining, backfilling of pits, progressive rehabilitation and ore processing. The expansion includes increasing ore production, development of new pits and permanent waste landforms, the development of new infrastructure, additional dewatering and water disposal activities, an upgrade of the ore processing facility. Read more...