This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 14, 2022
APA Northern Goldfields Interconnect Pty Ltd proposes to construct and operate the Northern Goldfields Interconnect Pipeline. The 300 mm diameter buried gas pipeline will extend for approximately 580 km, starting from Ambania (50 km east of Geraldton) to 40 km south of Leinster where it will connect into the existing Goldfields Gas Pipeline. The project will connect existing gas assets in the Mid West region with existing gas assets in the Northern Goldfields region. The proposal includes... Read more...Last updated: December 14, 2021
RCMA Australia is proposing to drill one conventional oil exploration well to determine if there is oil in the prospect, located 11 kilometres (km) south of Dongara / Port Denison in the onshore Perth Basin, within the Beekeepers Nature Reserve. The proposal includes all activities associated with drilling a conventional oil exploration well including site preparation, equipment mobilisation, drill, case and cement, decommissioning, demobilisation, site restoration and rehabilitation. The... Read more...Last updated: October 4, 2021
The Waitsia Gas Project Stage 2 is a conventional gas proposal located approximately 16km East-South-East of the Dongara-Port Denison town sites. The proposal includes clearing of up to 17 ha of native vegetation to support the following: Construction and operation of a new gas processing plant with a maximum export capacity of 250 terajoules per day; Drilling of up to 6 new production wells to supplement the existing 2 wells; Installation of a gas gathering system comprising of flowlines and... Read more...Last updated: April 28, 2021
Salt Lake Potash Limited propose to abstract Sulphate of Potash (SOP) rich brines to produce up to 260 kilotonnes per annum (ktpa) of SOP product. The proposal is located in and around Lake Way, approximately 25 kilometres south of Wiluna. The activities and infrastructure proposed includes evaporation ponds, brine abstraction trenches, paleochannel brine production bores, permanent brine pumps/pipework, access and infrastructure corridors and excess salt disposal areas. The proposal will cover... Read more...Last updated: September 30, 2020
The proposal is for the continuation of mining operations at the Fimiston site, and expansion and deepening of the Superpit to 600 metres via the Golden Pike Cutback. Additional waste dumps will be created to the north of the pit to contain 140 million tonnes of waste rock. The Fimiston I and II tailings storage facilities and/or the Kaltails tailings storage facility will be expanded to contain the additional tailings. This is a reassessment, pursuant to the Minister's decision to remit... Read more...Last updated: June 18, 2020
Inquiry under s46 into changing the conditions (extension of time limit for proposal implementation) of Ministerial Statements 469, 774, 815 and 927. Read more...Last updated: May 5, 2020
The proposal is to develop an iron ore mine located approximately 68 kilometres south-east of Yalgoo and 30 kilometres north-east of the Greater Karara Iron Ore Project in the Shire of Yalgoo. Read more...Last updated: May 5, 2020
Change Condition 3 to extend the time limit of authorisation for substantial commencement of the proposal Read more...Last updated: December 10, 2019
The proposal involves land clearing and mining below the base of weathering for the recommencement and extension of the Windimurra Vanadium Mine which ceased operations in 2004. The mine and associated infrastructure are located approximately 80 kilometres south-east of Mount Magnet, in the Shire of Mount Magnet. Read more...Last updated: November 22, 2019
Changes to conditions 3-1 and 3-2 of Ministerial Statement 911 in order to extend the time limit of proposal implementation. Read more...Last updated: July 29, 2019
The proposal is to develop and operate a mineral sands mine approximately 25 kilometres south-east of the township of Dongara in the Midwest Region of Western Australia. Read more...Last updated: December 21, 2017
The proposal is for clearing of access tracks and clearing, leveling and cut and fill of drill pads for exploration drilling on the Mungada Ridge of the Midwest Region of Western Australia. Read more...Last updated: January 16, 2017
The proposal is to mine uranium ore from the Yeelirrie deposit, approximately 70 km south-west of Wiluna, and the construction of associated mine infrastructure, including ore processing facilities, water (includes borefield and corridors) abstraction and reinjection infrastructure, roads, accommodation, offices and workshops, stockpile and laydown areas and evaporation pond. Tailings would be discharged into the mine open pit. Read more...Last updated: January 9, 2017
Toro proposes to revise the Approved Project by developing Millipede and Lake Maitland uranium deposits and developing associated infrastructure. The Proposed Extension would result in the additional direct disturbance of approximately 1,582 hectares (ha) within an additional Development Envelope of approximately 3,891 ha. The Proposed Extension would include open mine pits at Millipede and Lake Maitland, in-pit tailings storage facility (TSF) at Millipede, accommodation village, workshop, run-... Read more...Last updated: December 5, 2016
The proponent, Mount Gibson Mining Limited, proposes to mine hematite ore from the Iron Hill and Iron Hill South Deposits. The Iron Hill Deposits are part of the Mt Gibson Range, which is located approximately 270 kilometres (km) east-south-east of Geraldton. The proposal is located within a 112 hectare (ha) development envelope. The proposal is for the development of two mine pits (20 ha), a waste rock landform (30 ha) and support infrastructure (37 ha), which includes topsoil stockpiles and... Read more...Last updated: November 17, 2016
The proposal is to construct and operate a uranium mine consisting of two deposits Centipede and Lake Way at mining tenements M53/224 and MLA53/1090, located approximately 30 kilometres south and 15 kilometres south-east of Wiluna. Read more...Last updated: August 4, 2015
The proposal is for an exploration drilling program which involves disturbance and clearing for access tracks and drill pads, and fencing, on banded iron formation ranges of the Perenjori Hills. Read more...Last updated: February 20, 2015
The proposal is to undertake a 3D seismic acquisition survey across a 10,600 hectare area within exploration permit area EP413. The proposal comprises the following elements: Preparation of north-south and east-west vehicle access lanes by cutting vegetation above ground level and mulching greenstock with immediate replacement of mulch in-situ (also known as “raised blade roller mulching”). Laying source and receiver lines along lanes and insertion of geophones to a depth of 0.1 metres.... Read more...Last updated: June 4, 2014
To develop and operate an iron ore mine, supporting infrastructure and a haul road, 76 km north-east of Perenjori in the Midwest region. Read more...