This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 24, 2021
Open cut dry mining of mineral sands and the processing of mined material through primary and secondary concentration plants and dry minerals separation. It includes the construction and operation of associated infrastructure and a modification to the intersection of Brand Hwy with Wannamal Road West. Read more...Last updated: May 14, 2021
To mine a series of open pits over approximately 25 kilometres, within the Cataby Mineral Sands Project located approximately 150 km north of Perth. Inquiry under s46 relating to Ministerial Statement 720 and EPA Report 1212 . Read more...Last updated: January 22, 2021
Tronox Management Pty Limited proposes to develop the Cooljarloo West Titanium Minerals Project, 30 kilometres west from Cervantes, Shire of Dandaragan. The proposal involves the dredge mining of three orebodies: Woolka, Harrier and Kestrel. The proposal will require movement of the mining dredge and ore processing plant (concentrator) from the existing Cooljarloo Mine to Cooljarloo West and back again via flotation across an open channel. Read more...Last updated: June 26, 2020
The proposal is for the development and operation of the Parker Range Project, located in the Mount Caudan section of the Parker Range within the Shire of Yilgarn. It includes the development and operation of an above and below the watertable greenfields iron ore mine and associated infrastructure. An existing gazetted road (Parker Range Road) runs across the ore body. A gazetted bypass road would be required around the proposed mine site requiring approximately 10 ha of clearing. Ore from the... Read more...Last updated: November 20, 2019
Remove reference to Claypans of the Swan Coastal Plain and remove requirement to vest land with the Conservation and Parks Commission. Read more...Last updated: December 8, 2017
The Class II Landfill, Lot 7778 Diagram 209805, 1189 Wannamal Road South proposal is to construct and operate a landfill accepting Class II-type waste in Gingin, Western Australia. The proposal includes a landfill gas collection and utilisation plant. The EPA notes that Lot 7778 Diagram 209805 has been subdivided and the proposal is now located on Lot 98 on Deposited Plan 75926, Wannamal Road South. Read more...Last updated: July 17, 2017
The proposal is for the development and operation of the Parker Range Project, located in the Mount Caudan section of the Parker Range within the Shire of Yilgarn. It includes the development and operation of an above and below the watertable greenfields iron ore mine and associated infrastructure. This is an inquiry under s46 into a request to extend the Time Limit of Authorisation of Ministerial Statement 892 . Read more...Last updated: December 30, 2014
The proposal is to construct a mineral sands mine at Cataby approximately 150 km north of Perth. The project will consist of a series of 13 open pits over approximately 25 kilometres, which will be progressively mined by dry mining techniques. The proposal will produce approximately 760 to 780 kilotonnes of Heavy Mineral Concentrate per annum. Read more...Last updated: July 30, 2014
The extension of open pit mining of mineral sands by dredging and dry mining adjacent to existing operations. Existing dry mining and processing practices, plant and equipment will be used. Approximately 3.1 million tonnes of ore will be extracted, slurried and processed by the dry mine concentrator to extract heavy mineral concentrate for transporting to the Chandala facilities. Inquiry under s46 to amend condition 7-1 of Ministerial Statement 790 . Read more...Last updated: July 2, 2014
To construct and operate a landfill accepting Class II-type waste. Six cells will be constructed with a total operational lifetime of not more than 30 years. A landfill gas collection system and utilisation plant facility will also be constructed. Inquiry under s46 to change condition 3 - extension of Time Limit of Authorisation - Ministerial Statement 796 . Read more...Last updated: April 29, 2013
The development and operation of a quarry. Inquiry under s46 to delete conditions 11, 12 and 17 of Ministerial Statement 706 and condition 6 of Ministerial Statement 872 . Read more...Last updated: March 12, 2012
The proposal is for the mining of a 53-hectare area and processing of approximately 1.3 million tonnes of gypsum recovered from Mining Lease 70/1161 using the facilities currently employed for operations in the adjacent Mining Lease 70/750. The proposal involves dredging and will form a permanent hypersaline water body of approximately four metres maximum depth. Dredging operations are proposed to be undertaken every second year over a 2 to 4 week period to excavate approximately 100,000 tonnes... Read more...Last updated: October 24, 2011
The proposal is to develop and operate an open pit nickel mine and associated infrastructure on Mining Lease 77/00583 and haulage road on Mining Lease 77/00545 within the Shire of Kondinin. Read more...Last updated: January 10, 2011
The proposal is to conduct a 3D seismic survey within an area consisting of private land, the proposed Big Soak Plain Conservation Park and the Watheroo National Park approximately 60 kilometres east of Jurien Bay. The survey would involve the rolling of vegetation for vehicle access to the seismic lines. Read more...Last updated: October 28, 2010
The proposal is to develop an iron ore mine at the Koolyanobbing Iron Ore Project-Mt Jackson J1 Deposit (Mt Jackson J1 Deposit), located approximately 110 kilometres (km) north-north-east of Southern Cross in the Shire of Yilgarn. The proposal includes two mine pits to extract approximately 33 million tonnes of iron ore and associated mining infrastructure. The proposed mine required disturbance of approximately 605 hectares (ha) of native vegetation for pits, associated mine infrastructure,... Read more...Last updated: September 17, 2010
The proposal is to construct and operate the Coolimba Power Station on a site located approximately 15 kilometres (km) south-south-west of Eneabba, and to establish an approximately 20 km long and 100 metre (m) wide infrastructure corridor that will accommodate the construction and operation of: a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline; and a 330 kV electricity transmission line to... Read more...Last updated: June 11, 2009
To construct and operate a landfill accepting Class II-type waste. Six cells will be constructed with a total operational lifetime of not more than 30 years. A landfill gas collection system and utilisation plant facility will also be constructed. Read more...Last updated: March 16, 2009
The extension of open pit mining of mineral sands by dredging and dry mining adjacent to existing operations. Existing dry mining and processing practices, plant and equipment will be used. Approximately 3.1 million tonnes of ore will be extracted, slurried and processed by the dry mine concentrator to extract heavy mineral concentrate for transporting to the Chandala facilities. Read more...