This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: October 27, 2022
Proposal to build and operate a Regional Resource Recovery Center on Pt Lot 78 and Pt Lot 85 Bannister Rd, Canning Vale. Read more...Last updated: February 1, 2022
Changes to condition 7 to remove reference to the onsite brickmaking facility. Read more...Last updated: January 31, 2022
To build and operate a waste to energy plant on Lot 9500 Leath Road, Kwinana in the Kwinana Industrial Area. Read more...Last updated: January 20, 2020
Changes to condition 3 of Ministerial Statement 976 in order to extend the Time Limit for Authorisation for substantial commencement of the proposal. Read more...Last updated: July 31, 2017
Elan Energy Matrix Pty Ltd proposes to construct and operate a Tyre Resource Recovery Facility to recycle used tyres at 9 Fargo Way Welshpool, approximately 12 kilometres southeast of Perth within a ‘General Industry’ zone in the City of Canning. The proposal will involve thermal processing of used tyres to produce carbon black (material derived from char), steel wire, oil and process gas using an indirect fired thermal conversion unit. The plant will be located within enclosed buildings.... Read more...Last updated: April 26, 2016
The proposal is to construct and operate a Wood Waste to Energy Plant at the existing Hazelmere Recycling Centre on Part Lot 100 and Lot 301, Lakes Road, Hazelmere. Read more...Last updated: February 20, 2015
The proposal is to discharge up to 30 megalitres per day (ML/day) of industrial wastewater, in addition to treated wastewater from Woodman Point and Cape Peron wastewater treatment plants and water from the Jervoise Bay Groundwater Recovery Scheme, to the Sepia Depression via the Cape Peron outlet line from the Kwinana Wastewater Reclamation Plant (KWRP); BP Refinery (Kwinana); CSBP Limited; Edison Mission Energy, and further unspecified sources. Read more...Last updated: January 20, 2015
To build and operate a Waste to Energy and Materials Recovery Facility on Lot 1 Office Road, 3 kilometres north-east of Rockingham in the Rockingham Industrial Zone. Read more...Last updated: July 9, 2014
The proposal is to construct and operate a resource recovery facility within the existing Red Hill Waste Management Facility, City of Swan, for the processing of waste to produce energy, using either anaerobic digestion technology or gasification technology. Read more...Last updated: December 7, 2005
Inquiry under Section 46(1) of the, Environmental Protection Act 1986, , on whether the conditions of the implementation of Ridgepoynt Pty Ltd's (Ridgepoynt) proposal, to remediate the Tonkin Park Industrial site by containment of the waste on-site in a cell, should be changed. Specifically, the conditions regarding the timeline for implementation, ongoing monitoring of the groundwater and ongoing management of the cell are to be reviewed. Read more...Last updated: October 13, 2004
The proposal is to establish a Resource Recovery Facility (RRF) to process 100 ,00 tonnes per annum of municipal solid waste (MSW) in the Neerabup Industrial Area (NIA), City of Wanneroo Read more...Last updated: March 18, 2002
The Brookdale Liquid Waste Treatment Facility (LWTF) has been operating under environmental approvals since 1988 as a septage treatment plant. The facility was also licenced by the Department of Environmental Protection (DEP) to receive some specific types of hazardous liquid waste for treatment to render them nonhazardous or utilised on-site as reagents for treating other liquid wastes. This proposal is for a change to plant processes and waste acceptance criteria for this facility to enable... Read more...Last updated: July 10, 2001
Inquiry under section 46 of the, Environmental Protection Act 1986, to increase to phosphorus discharge limit Read more...Last updated: January 24, 2001
The proposal is for a regional waste processing facility within the Kwinana Heavy Industrial Estate. The site is located on the Swan Coastal Plain approximately 30 kilometres south west of the Perth Central Business District and 3 kilometres north-west of the Town of Kwinana. The site is a large undeveloped piece of land which is adjacent to the British Petroleum (BP) refinery. The nearest residences are located to the north east in Hope Valley (approximately 2.6 kilometres) and to the east in... Read more...Last updated: October 9, 1998
The proposal is to manage the environmental impact of a former liquid waste disposal site in Southern River Road, Gosnells. The site includes 13 unlined lagoons constructed from sand. Discharges to the lagoons included primarily septage and brewery wastes, however unknown quantities of other wastes were also discharged. Read more...Last updated: August 21, 1998
The Water Corporation proposes to construct a 500mm-600mm diameter pressure sewer main and associated pump station to service the sewage requirements of residential development within the vicinity of the Ellenbrook Development located 26km north of the Perth CBD. Read more...Last updated: November 21, 1997
The proposal is to establish Class IV waste disposal cells at the proponent's existing Red Hill Waste Disposal Facility. These waste cells would provide for the disposal of low hazard wastes, including contaminated soils and household hazardous wastes, within the Perth metropolitan area. The facility is located approximately 12 km north east of Midland on Toodyay Road, Red Hill. Read more...Last updated: January 19, 1995
Inquiry under s46 regarding changing the implementation conditions of Ministerial Statement 144 . It is proposed that the refinery effluent, tailings pond liquor and recovered groundwater will be blended in the lined staging pond at Baldivis prior to feeding to the CMF plant. The filtrate from the CMF plant will be returned to the refinery site and treated in the existing reverse osmosis circuit. In addition to the CMF plant, WMC is reviewing current remedial plans, as well as short and long... Read more...Last updated: July 9, 1992
The proposal is to collect an existing backlog of waste polychlorinated biphenyls (PCBs) and chlorinated pesticides which are stored at various centres in Western Australia and export them to the United Kingdom for destruction by high temperature incineration at the Rechem facilities at Fawley and Pontypool. The proposal does not cover waste which may be generated in the future as it is unlikely these materials would ever be used again in Western Australia. Environmental issues relating to... Read more...