This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 2, 2019
The Commissioner of Main Roads is proposing to undertake modification works within the existing Tonkin Highway Road Reserve between Guildford Road and Hepburn Avenue. The proposed modification works allow for: Future upgrade of Tonkin Highway to a four lane ‘all-lane-running’ scenario Future construction and operation of a mass transit system within the Tonkin Highway media by other agencies. The proposed modification works will require realignment and reconstruction of the Tonkin Highway Road... Read more...Last updated: August 21, 2019
Robe River Mining Co Pty Ltd is seeking to extend the existing Mesa A / Warramboo Iron Ore Mining Project by extending the existing mining operation and developing four new nearby deposits. The proposal is 43 kilometres west of Pannawonica in the Pilbara Region. The proposal would require an additional 3000 hectares of clearing of native vegetation, with some below water table mining. A water supply would also be required and discharge of any excess water to Warramboo Creek. Read more...Last updated: March 26, 2019
The proposal is to upgrade the Liquefied Petroleum Gas (LPG) extraction plant at Kwinana. The proposed upgrade will coincide with a reduction in the concentration of LPG available in natural gas from the North West Shelf and enable the proponent to maintain existing levels of production of LPG. Read more...Last updated: February 25, 2019
New Energy Corporation Pty Ltd propose to revise the Waste to Energy technology for their approved Waste to Energy and Materials Recovery Facility on Lot 1 Office Road, 3 kilometres north-east of Rockingham in the Rockingham Industrial Zone (Shire of Rockingham). Read more...Last updated: January 28, 2019
The Water Corporation is proposing to divert wastewater from the Bullsbrook Waste Water Treatment Plant (WWTP) to the Beenyup WWTP, 20 km away. A new pipeline will be installed predominantly along the Great Northern Highway to the Millhouse Road Pump Station in Ellenbrook. The pipeline alignment traverses Main Roads WA and local government road reserves. The alignment is adjacent to Ellen Brook Nature Reserve, several Bush Forever Sites and intersects Bush Forever site 300 at Ellen Brook,... Read more...Last updated: December 12, 2018
The proposal is to extend the existing Red Hill Quarry to the west (West Quarry Pit Extension Area A) and north-west (West Quarry Pit Extension Area B) of the current pit, and extend the existing stockpile and dispatch area, and install a quaternary crusher. Read more...Last updated: December 12, 2018
The proposal is to construct and operate a dual carriageway road from the current terminus of Roe Highway at Kwinana Freeway in Jandakot to Stock Road in Coolbellup., Note:, The decision of the Supreme Court of Western Australia in, Save Beeliar Wetlands (Inc) and Anor v. Jacob, [2015] WASC 482 was overturned by the Court of Appeal on Friday 15 July 2016 in, Access the Court of Appeal decision, Jacob v Save Beeliar Wetlands (Inc), [2016] WASCA 126. The effect of the Court of Appeal decision is... Read more...Last updated: December 4, 2018
The proposal is to duplicate the existing Advanced Water Recycling Plant (AWRP) at the Beenyup facility in Craigie. The proposal also includes the construction of two water recharge sites and pipeline infrastructure along a 12.8 km route through the suburbs of Woodvale, Wanneroo, Ashby and Neerabup to recharge approximately 14 GL of recycled water to the Leederville and Yarragadee aquifers. The proposal forms Stage 2 of the Perth Groundwater Replenishment Scheme (GRWS) with the expansion of 14... Read more...Last updated: October 15, 2018
Main Roads Western Australian (Main Roads) are proposing to upgrade sections of Armadale Road and the Kwinana Freeway in the City of Cockburn (the Proposal). The Proposal is to: realign and extend Armadale Road from Solomon Road to North Lake Road; duplicate and upgrade intersections along Armadale Road between Solomon Road and Ghostgum Avenue; construct a new bridge and on/off ramps over Kwinana Freeway; and construct a southbound collector distributor road along the Kwinana Freeway between... Read more...Last updated: June 11, 2018
URBNSURF (Perth) Pty Ltd proposes to construct and operate a surf sports, recreation and leisure facility at the western end of Tompkins Park in Alfred Cove. The facility will feature an open water surfing lagoon which generates consistent surfing waves of variable height in quick succession. The proposal is located adjacent to the Swan River and the A-Class Alfred Cove Nature Reserve. Currently majority of the site covered in turf from existing playing fields and bowling greens of the Melville... Read more...Last updated: April 4, 2018
The proposal is to develop Pinky’s Beach Eco-Retreat located adjacent to Pinkys Beach, on Rottnest Island. The Eco-Retreat is to be located west of the existing campground and directly adjacent to an existing Waste Water Treatment Plant (WWTP) to the east. The Proposal will involve the construction and operation of the following: 83 small holiday canvas accommodation dwellings; food and beverage “Beach Club” outlet with nearby shade structures; managers residence permitting the site manager to... Read more...Last updated: February 5, 2018
AME is proposing to expand the existing facility in Henderson and further develop the waterfront infrastructure by dredging within an area of the Northern Harbour, Jervoise Bay. The proposal is immediately adjacent to the AME site (49 Clarence Beach Road, Henderson) and proposes to utilise the dredge sediments to create a land-backed wharf. Read more...Last updated: January 29, 2018
The proposal is to undertake a number of redevelopment works to upgrade the existing Two Rocks Marina facilities to address ageing infrastructure, improve safety and provide a foundation for future redevelopment opportunities. This includes the construction of: a reclamation area; breakwater turning and laydown area; and new floating boat pens. Read more...Last updated: December 13, 2017
The proposal is to extend the Kwinana Freeway 2x2 lane, dual carriageway from Forrest Road to Thomas Road, with major on and off ramps at Russel/Gibbs Roads, Rowley Road, Hope Valley Road and Thomas Road. Provision for upgrading the freeway to a 2x3 lane dual carriageway has been included in the proposal. It has also been proposed to incorporate a dual use path within the freeway reserve, located to the west of the road surface. The alignment of the Forrest Road to Thomas Road section of the... Read more...Last updated: November 27, 2017
Plantrite Nursery has applied to the City of Swan for retrospective planning approval for the expansion of its existing 5 hectare (ha) native plant nursery on Lot 88 Bingham Road Bullsbrook (Lot 88). This expansion is proposed to be completed over two stages totalling 10.67 ha; Stage 1 covering 4.76 ha and Stage 2 covering 5.91 ha. However approximately 2.5 ha of Stage 1 has already been constructed. The expansion will also require a new groundwater abstraction licence. Stage 2 is only proposed... Read more...Last updated: November 24, 2017
Section 46 Change to Conditions withdrawn 24 November 2017. Read more...Last updated: November 20, 2017
Cottesloe Pier Pty Ltd proposes to construct a pier extending off the end of the current Cottesloe groyne. The project design consists of a jetty and boardwalk structure including an underwater observatory, cafe, swimming area and fishing jetty. Read more...Last updated: October 31, 2017
Development of an integrated water supply and wastewater treatment system on Rottnest Island Read more...