Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • EPA Board Meetings
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • Industrial (17) Apply Industrial filter
  • Infrastructure (14) Apply Infrastructure filter
  • Waste management (13) Apply Waste management filter
  • Land use (9) Apply Land use filter
  • Mineral sands (4) Apply Mineral sands filter
  • Power generation (4) Apply Power generation filter
  • Sand, rock, gravel and clay (4) Apply Sand, rock, gravel and clay filter
  • Rare earth elements (2) Apply Rare earth elements filter
  • Gold (1) Apply Gold filter
  • Iron Ore (1) Apply Iron Ore filter
  • Oil and gas (1) Apply Oil and gas filter
  • Salt (1) Apply Salt filter
  • Utilities (1) Apply Utilities filter

Filter by current status:

  • Ministerial Statement published (52) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (12) Apply Decision on whether to assess has been published filter
  • Proposal withdrawn (2) Apply Proposal withdrawn filter
  • Public Environmental Review period closed (2) Apply Public Environmental Review period closed filter

Filter by relevant environmental factors:

  • (-) Remove Air Quality filter Air Quality
  • Social Surroundings (39) Apply Social Surroundings filter
  • Flora and Vegetation (20) Apply Flora and Vegetation filter
  • Inland Waters Environmental Quality (16) Apply Inland Waters Environmental Quality filter
  • Marine Environmental Quality (15) Apply Marine Environmental Quality filter
  • Terrestrial Environmental Quality (14) Apply Terrestrial Environmental Quality filter
  • Hydrological Processes (13) Apply Hydrological Processes filter
  • Terrestrial Fauna (13) Apply Terrestrial Fauna filter
  • People (11) Apply People filter
  • Human Health (9) Apply Human Health filter
  • Inland Waters (5) Apply Inland Waters filter
  • Benthic Communities and Habitats (4) Apply Benthic Communities and Habitats filter
  • Marine Fauna (4) Apply Marine Fauna filter
  • Coastal Processes (2) Apply Coastal Processes filter
  • Landforms (2) Apply Landforms filter
  • Greenhouse Gas Emissions (1) Apply Greenhouse Gas Emissions filter
  • Water (1) Apply Water filter

Filter by Proponent:

  • Water Corporation (5) Apply Water Corporation filter
  • Australian Gold Reagents Pty Ltd (4) Apply Australian Gold Reagents Pty Ltd filter
  • Eastern Metropolitan Regional Council (4) Apply Eastern Metropolitan Regional Council filter
  • CSBP Limited (3) Apply CSBP Limited filter
  • Hanson Construction Materials Pty Ltd (2) Apply Hanson Construction Materials Pty Ltd filter
  • Keysbrook Leucoxene Pty Ltd (2) Apply Keysbrook Leucoxene Pty Ltd filter
  • Kwinana WTE Project Co Pty Ltd (2) Apply Kwinana WTE Project Co Pty Ltd filter
  • LandCorp and Octennial Holdings Pty Ltd (2) Apply LandCorp and Octennial Holdings Pty Ltd filter
  • New Energy Corporation Pty Ltd (2) Apply New Energy Corporation Pty Ltd filter
  • Tiwest Joint Venture (2) Apply Tiwest Joint Venture filter
  • • Port Hedland Waste to Energy and Materials Recovery Facility (Ministerial Statement 935); Resource Recovery Facility Red Hill (976); East Rockingham Waste to Energy and Materials Recovery Facility (994); Kwinana Waste to Energy Project (1016) (1) Apply • Port Hedland Waste to Energy and Materials Recovery Facility (Ministerial Statement 935); Resource Recovery Facility Red Hill (976); East Rockingham Waste to Energy and Materials Recovery Facility (994); Kwinana Waste to Energy Project (1016) filter
  • A & C Carcione (1) Apply A & C Carcione filter
  • Ace Nominees Pty Ltd (1) Apply Ace Nominees Pty Ltd filter
  • Aurigen Group Ltd (1) Apply Aurigen Group Ltd filter
  • BHP Billiton Iron Ore Pty Ltd (1) Apply BHP Billiton Iron Ore Pty Ltd filter
  • D & N Marinovich (1) Apply D & N Marinovich filter
  • Elan Energy Matrix Pty Ltd (1) Apply Elan Energy Matrix Pty Ltd filter
  • Global Olivine Western Australia (1) Apply Global Olivine Western Australia filter
  • HIsmelt Corporation Pty Ltd (1) Apply HIsmelt Corporation Pty Ltd filter
  • HIsmelt (Operations) Pty. Limited (1) Apply HIsmelt (Operations) Pty. Limited filter
  • Iluka Resources Limited (1) Apply Iluka Resources Limited filter
  • International Brick and Tile Pty Ltd (Futuris Corporation Ltd) (1) Apply International Brick and Tile Pty Ltd (Futuris Corporation Ltd) filter
  • James Point Pty Ltd (1) Apply James Point Pty Ltd filter
  • Keppel Holdings Pty Ltd (1) Apply Keppel Holdings Pty Ltd filter
  • Koolyanobbing Iron Pty Ltd. Fremantle Port Authority and Westrail (1) Apply Koolyanobbing Iron Pty Ltd. Fremantle Port Authority and Westrail filter
  • M Mihaljevich (1) Apply M Mihaljevich filter
  • Main Roads Western Australia (1) Apply Main Roads Western Australia filter
  • Midland Redevelopment Authority (1) Apply Midland Redevelopment Authority filter
  • Mt Weld Mining Pty Limited (1) Apply Mt Weld Mining Pty Limited filter
  • NewGen Neerabup Pty Ltd (1) Apply NewGen Neerabup Pty Ltd filter
  • NewGen Power Pty Ltd (1) Apply NewGen Power Pty Ltd filter
  • P & S Hilliard (1) Apply P & S Hilliard filter
  • Perth Energy Pty Ltd (1) Apply Perth Energy Pty Ltd filter
  • Phoenix Energy Australia Pty Ltd (1) Apply Phoenix Energy Australia Pty Ltd filter
  • Primary Energy Pty Limited (1) Apply Primary Energy Pty Limited filter
  • Questdale Holdings Pty Ltd (1) Apply Questdale Holdings Pty Ltd filter
  • Ridgepoynt Pty Ltd (1) Apply Ridgepoynt Pty Ltd filter
  • State Energy Commission of Western Australia (1) Apply State Energy Commission of Western Australia filter
  • Tiwest Joint Venture Pty Ltd (1) Apply Tiwest Joint Venture Pty Ltd filter
  • WA Limestone (1) Apply WA Limestone filter
  • WA Planning Commission and City of Armadale (1) Apply WA Planning Commission and City of Armadale filter
  • Wambo Power Ventures Pty Ltd (1) Apply Wambo Power Ventures Pty Ltd filter
  • Waste Management Division of the Department of Environmental Protection (1) Apply Waste Management Division of the Department of Environmental Protection filter
  • Wasterock Pty Ltd (1) Apply Wasterock Pty Ltd filter
  • Wasterock Pty Ltd; Hazelland Pty Ltd (1) Apply Wasterock Pty Ltd; Hazelland Pty Ltd filter
  • Water Corporation of Western Australia (1) Apply Water Corporation of Western Australia filter
  • Wesfarmers CSBP Ltd (1) Apply Wesfarmers CSBP Ltd filter
  • Wesfarmers LPG Pty Ltd (1) Apply Wesfarmers LPG Pty Ltd filter
  • Western Power Corporation (1) Apply Western Power Corporation filter
  • Western Resource Recovery (1) Apply Western Resource Recovery filter

Filter by region:

  • (-) Remove Perth filter Perth
  • Peel (1) Apply Peel filter

Filter by last updated:

  • 2023 (1) Apply 2023 filter
  • 2022 (6) Apply 2022 filter
  • 2021 (4) Apply 2021 filter
  • 2020 (8) Apply 2020 filter
  • 2019 (5) Apply 2019 filter
  • 2018 (2) Apply 2018 filter
  • 2017 (4) Apply 2017 filter
  • 2016 (6) Apply 2016 filter
  • 2015 (1) Apply 2015 filter
  • 2014 (2) Apply 2014 filter
  • 2010 (1) Apply 2010 filter
  • 2007 (2) Apply 2007 filter
  • 2006 (1) Apply 2006 filter
  • 2005 (3) Apply 2005 filter
  • 2004 (3) Apply 2004 filter
  • 2003 (4) Apply 2003 filter
  • 2002 (3) Apply 2002 filter
  • 2001 (1) Apply 2001 filter
  • 2000 (1) Apply 2000 filter
  • 1999 (1) Apply 1999 filter
  • 1998 (2) Apply 1998 filter
  • 1997 (2) Apply 1997 filter
  • 1996 (1) Apply 1996 filter
  • 1995 (2) Apply 1995 filter
  • 1994 (2) Apply 1994 filter
  • 1989 (1) Apply 1989 filter
  1. Home
  2. Proposal search
  3. Perth
  4. Air Quality

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Hismelt iron ore smelting project, Kwinana (s46)

Last updated: February 4, 1998

Read more...

Finalisation of contaminated material clean-up of former Industrial Land, McCabe Street, Mosman Park (s46) [1061]

Last updated: December 19, 1997

The proposal is to manage an additional 67 ,500m 3 of contaminated material as part of the rehabilitation of former industrial land at McCabe Street, Mosman Park . Clean-up of this industrial land commenced in 1995 and has been subject to three previous assessments (EPA Bulletins 324, 699 and 807). The proponents are seeking to amend the existing conditions of approval ( Ministerial Statement 338 ) under Section 46 of the, Environmental Protection Act 1986, to allow for disposal of the... Read more...

Staged expansion of Tiwest Pigment Plant to 180,000 tpa, Kwinana

Last updated: June 30, 1997

The proposal is to increase the production capacity of Tiwest's titanium dioxide plant at Kwinana. The proposal is to modify/expand the existing plant to allow an increase in production capacity from 80,000 tonne per annum (tpa) to 180,00 tpa of titanium dioxide pigment in three notional stages: Stage I: increase to 120,000 tpa, Stage 2: increase to 165,000 tpa and Stage 3: increase to nominally 180,000 tpa. The first and second stages of the expansion wilI require major modifications to... Read more...

Increase in size of containment cell and changes to removal of drainage outfalls at McCabe St, Mosman Park (s46) [993]

Last updated: March 15, 1996

The proposal is to place contaminated materials into an enlarged portion of an engineered containment cell located onsite at McCabe Street in Mosman Park. The proponent wishes to increase the size of the containment cell and to amend the environmental conditions of Ministerial Statement 338 relating to removal of drainage outfalls at the site. This is the inquiry under s46 into the requested amendments. Read more...

Increase in Tiwest pigment plant production capacity to 80,000 tonnes per annum

Last updated: September 28, 1995

Tiwest Joint Venture proposes to increase the production of finished titanium dioxide pigment at its Kwinana Pigment Plant from 64,000 to 80,000 tonnes per annum by undertaking a "debottlenecking" process. Read more...

Land Use Changes Affecting Kwinana Environmental Protection Policy Buffer - MRS Amendment No. 939/33 A

Last updated: August 28, 1995

In November 1993 the State Planning Commission advised the Environmental Protection Authority of the proposed Metropolitan Region Scheme Amendment No 939/33A to rezone land bounded by Beeliar Drive, Stock Road, Frobisher Avenue and Fawcett Road, Munster in the City of Cockburn. This proposal is hereinafter referred to as the Munster Amendment. Read more...

Titanium dioxide pigment plant debottlenecking

Last updated: August 19, 1994

The Tiwest Joint Venture (TJV), the proponent, proposes to increase the production of finished titanium dioxide pigment at its Kwinana Pigment Plant. The Tiwest Joint Venture has requested changes to Condition 1 of the Ministerial Statement of 26 April 1989, relating to the Pigment Plant. Condition 1 restricts the original plant to 54,000 tonnes per annum of finished titanium dioxide pigment, as assessed by the Environmental Protection Authority in Bulletin 373. The proponent now proposes to... Read more...

Brick and Tile Works, Malaga (s46) [819]

Last updated: April 18, 1994

This is an inquiry under s46 regarding a proposal to subdivide the northern portion of Lot 121 Illawarra Crescent, Malaga into 45 separate industrial lots. Lots fronting Illawarra Crescent are proposed for showroom/semi-commercial use. IBT's brick and tile manufacturing facility is located on the south side of Lot 121. In the original proposal approved by the Minister for the Environment ( Ministerial Statement 3 , 1 September 1987) the northern portion of the lot was intended to serve as... Read more...

280 MW Gas Turbine Power Station at Pinjar

Last updated: March 14, 1989

The State Energy Commission is proposing to establish a gas turbine power station at Pinjar, north east of Wanneroo. At the completion of the construction in 1994, the station will comprise eight 35 MW gas turbine units. Read more...

Pages

  • « first
  • ‹ previous
  • 1
  • 2
  • 3
  • 4

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2023 Government of Western Australia. All rights reserved.