This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 18, 2023
The proposal involves the excavation and processing of a low-grade (2.7%) heavy mineral sands deposit near Keysbrook to produce 920,000 tonnes of Heavy Mineral Concentrate (HMC) over 8 years. An area of 30 hectares (ha) would be progressively mined at any time. Topsoil would be removed and stockpiled for use in rehabilitation. The ore would be excavated and unloaded into a dump hopper located on the pit floor. The ore would be conveyed to a screening plant where oversize material would be... Read more...Last updated: July 24, 2023
The Eastern Metropolitan Regional Council is proposing to construct and operate an immobilisation plant to treat Class V Air Pollution Control Residue (APCr) generated from offsite Waste to Energy plants, and to construct a dedicated Class IV monocell for disposal of the treated APCr, at the Red Hill Waste Management Facility, located within the City of Swan. The immobilisation plant will treat APCr to meet Class IV standards suitable for disposal into Class IV landfills. The existing Class IV... Read more...Last updated: June 22, 2023
The Public Transport Authority (PTA) proposes to construct and operate a new 14.5 kilometre (km) dual railway track to extend the existing Thornlie passenger line to Cockburn Central Station on the Mandurah line and duplicate the existing 3 km of single track between Beckenham Junction and Thornlie Station. The proposal requires the relocation of 11 km of freight line within the existing rail reserve. The proposal requires the construction and operation of two new stations at Ranford and... Read more...Last updated: December 19, 2022
Wasterock Pty Ltd and Hazelland Pty Ltd propose to remediate a historical inert landfill located at Lot 20 Adelaide Street Hazelmere for future commercial use. The proposal would involve recontouring the existing site and capping it with clean fill. Read more...Last updated: March 14, 2022
The Public Transport Authority (PTA) proposes to construct and operate a new 13 kilometre (km) dual railway track between Malaga and Ellenbrook. The proposed Malaga to Ellenbrook extends from the proposed Bayswater to Malaga railway line. The proposal includes three new stations at Malaga, Whiteman Park and Ellenbrook with intermodal rail, bus, carpark and active mode (cycling and walking) facilities at each station. A potential future station is also proposed at Bennett Springs and rail... Read more...Last updated: October 25, 2021
Main Roads Western Australia (Main Roads) is proposing to build the Swan River Crossings (the Proposal) that includes the construction of new road and rail bridges, the upgrading of the existing rail bridge and the demolition of the existing Fremantle Traffic Bridge in Fremantle, Western Australia. The proposals location includes the Road and rail corridor along Queen Victoria Street, Fremantle from Tydeman Road in the north to Canning Highway south of the Swan River. And the eastern side of... Read more...Last updated: July 15, 2021
The proposal is for the construction and operation of a Lithium Hydroxide Refinery at Lot 15 Mason Road, Kwinana within the Kwinana Industrial Area, approximately 31 km south of the Perth Central Business District. The Proposal will process spodumene ore concentrate, to produce battery grade Lithium Hydroxide Monohydrate, primarily for use in Lithium ion batteries for electric vehicles. The proposal would require a total of 11.2 hectares of native vegetation clearing within a 76 hectare... Read more...Last updated: October 12, 2020
The Public Transport Authority (PTA) proposes to extend the existing Joondalup railway line by 7.3 kilometres from Butler Station to the suburb of Eglinton in the City of Wanneroo. The proposal is to construct and operate the rail extension and includes two new intermodal (rail, bus, ‘park and ride’, ‘kiss and ride’, walk and cycle) transit stations at Alkimos and Eglinton. The PTA will operate train services between Perth and Eglinton Stations and bus services from the Alkimos and Eglinton... Read more...Last updated: May 18, 2020
Changes to condition 2 (Proponent Commitments), condition 4 (Compliance Audit and Performance Review), condition 5 (Decommissioning Plan), condition 6, (Review of Options for the Transport of Solid Sodium Cyanide), condition 7 (Transport of Solid Sodium Cyanide), condition 8 (Transport of Liquid Sodium Cyanide), condition 9 (Noise Management), condition 10 (Emissions Verification) and condition 11 (Cyanide Monitoring). Read more...Last updated: April 14, 2020
Eastern Metropolitan Regional Council propose to construct and operate a Community Recycling Centre (CRC) and Waste Transfer Station (WTS) within the existing Hazelmere Resource Recovery Park, at Lots 814, 100 and 301 Lakes Road Hazelmere, in the City of Swan. The CRC would be accepting a range of materials for reuse, recycling and disposal from community members, while the WTS would provide for the short-term storage capacity for consolidation of various waste streams including refuse and food... Read more...Last updated: February 10, 2020
GrainCorp Liquid Terminals Australia Pty Ltd proposes to construct and operate a bulk liquids terminal at Lot 108 Kwinana Beach Road, Kwinana Beach within the Kwinana Strategic Industrial Area. The proposal would involve disturbance of approximately 2.7 hectares and site activities include the transfer and storage of bulk liquids including urea ammonium nitrate liquid fertiliser solution, tallow, vegetable and used cooking oils, industrial solvent, and caustic soda 33%. Read more...Last updated: October 28, 2019
The Commissioner of Main Roads is proposing to upgrade the section of Tonkin Highway between Guildford Road (Bayswater) and the Great Eastern Highway (Belmont). The key components of the project are: construction and operation of two new bridges over the Swan River road widening, reconfiguration, and modification of existing interchanges construction and operation of on/off ramps and collector distributor roads connectivity of the principal shared path to and along Tonkin Highway. The proposal... Read more...Last updated: December 12, 2018
The proposal is to construct and operate a dual carriageway road from the current terminus of Roe Highway at Kwinana Freeway in Jandakot to Stock Road in Coolbellup., Note:, The decision of the Supreme Court of Western Australia in, Save Beeliar Wetlands (Inc) and Anor v. Jacob, [2015] WASC 482 was overturned by the Court of Appeal on Friday 15 July 2016 in, Access the Court of Appeal decision, Jacob v Save Beeliar Wetlands (Inc), [2016] WASCA 126. The effect of the Court of Appeal decision is... Read more...Last updated: August 13, 2018
The proposal is to expand CSBP's Kwinana Ammonium Nitrate Production Facility (ANPF) by incorporating additional components into the existing facility and re-engineering (debottlenecking) some existing components in order to increase ammonium nitrate production capacity from 520,000 tpa to 936,000 tpa. Read more...Last updated: November 24, 2017
Section 46 Change to Conditions withdrawn 24 November 2017. Read more...Last updated: January 23, 2017
Request from the Minister of Environment to amend conditions of Ministerial Statement 24. Read more...Last updated: December 7, 2016
The proposal is to construct and operate a single entrance onshore marina to accommodate up to 500 boat pens and moorings and a surrounding land development comprising tourism, commercial, public open space and residential land uses. Read more...Last updated: December 6, 2016
The proposal is to construct a single residence on Lot 1613 Barrett Street, Southern River. The proposal includes a residence, garage, swimming pool, stables, paddocks, access way and landscaping with an ornamental lake. Read more...Last updated: December 2, 2016
The proposal is to construct, operate and maintain a 1.5 km section of Keane road between Anstey and Skeet roads, Forrestdale. The proposal is located within Bush Forever Site 342 (approximately 369 hectares (ha)), which meets all six of the EPA’s criteria for the identification of regionally significant natural areas, contains one of the largest remaining areas of damplands of high conservation value on the Swan Coastal Plain, and is the largest consolidated area of Southern River vegetation... Read more...