Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • EPA Board Meetings
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • (-) Remove Oil and gas filter Oil and gas
  • Industrial (1) Apply Industrial filter

Filter by current status:

  • Ministerial Statement published (7) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (1) Apply Decision on whether to assess has been published filter

Filter by relevant environmental factors:

  • Flora and Vegetation (2) Apply Flora and Vegetation filter
  • Social Surroundings (2) Apply Social Surroundings filter
  • Terrestrial Fauna (2) Apply Terrestrial Fauna filter
  • Air Quality (1) Apply Air Quality filter
  • Benthic Communities and Habitats (1) Apply Benthic Communities and Habitats filter
  • Hydrological Processes (1) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (1) Apply Inland Waters Environmental Quality filter
  • Marine Environmental Quality (1) Apply Marine Environmental Quality filter
  • Marine Fauna (1) Apply Marine Fauna filter
  • Terrestrial Environmental Quality (1) Apply Terrestrial Environmental Quality filter

Filter by Proponent:

  • Wesfarmers LPG Pty Ltd (2) Apply Wesfarmers LPG Pty Ltd filter
  • Beach Energy Limited (1) Apply Beach Energy Limited filter
  • BP Refinery (Kwinana) Pty Ltd (1) Apply BP Refinery (Kwinana) Pty Ltd filter
  • Caltex Oil (Austraiia) Pty Limited (1) Apply Caltex Oil (Austraiia) Pty Limited filter
  • Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Limited (1) Apply Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Limited filter
  • Petrochemical Industries Company Limited (PICL) (1) Apply Petrochemical Industries Company Limited (PICL) filter
  • West Australian Petroleum Pty Ltd (1) Apply West Australian Petroleum Pty Ltd filter

Filter by region:

  • (-) Remove Perth filter Perth

Filter by last updated:

  • 2020 (1) Apply 2020 filter
  • 2019 (1) Apply 2019 filter
  • 2005 (1) Apply 2005 filter
  • 1992 (1) Apply 1992 filter
  • 1991 (2) Apply 1991 filter
  • 1988 (2) Apply 1988 filter
  1. Home
  2. Proposal search
  3. Perth
  4. Oil and gas

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Zemira 3D Seismic Survey

Last updated: April 20, 2020

The proposal is to undertake an onshore three-dimensional (3D) seismic survey in the northern Perth Basin. The survey area is about 300 kilometres (km) north of Perth, and its nearest boundary is about 4.5 km north of the town of Eneabba and about 25 km southeast of the town of Dongara. The survey area is situated within four local shires:  Shire of Irwin, Shire of Three Springs, Shire of Mingenew and Shire of Carnamah. The intent of the Zemira 3D Seismic Survey is to collect a high-quality 3D... Read more...

Wesfarmers LPG proposed upgrade

Last updated: March 26, 2019

The proposal is to upgrade the Liquefied Petroleum Gas (LPG) extraction plant at Kwinana. The proposed upgrade will coincide with a reduction in the concentration of LPG available in natural gas from the North West Shelf and enable the proponent to maintain existing levels of production of LPG. Read more...

Southern Looping Project, Loop 10, south of Kwinana

Last updated: December 28, 2005

The proposal is to construct and operate a 23-kilometre pipeline from Kwinana Junction, in Kwinana to Hopelands (between Punrak Road and Henderson Road). This proposal is known as the Southern Looping Project, and comprises loop 10. The proponent has also referred a proposal to construct and operate a 194-kilometre pipeline from Compressor Station 1 south of Karratha, to Compressor Station 9, north of Gingin. This proposal, known as the Northern Looping Project , and comprising loops 1 to 9,... Read more...

Caltex North Fremantle terminal extension

Last updated: April 2, 1992

Caltex proposes to consolidate its operations into their existing Brack Street, North Fremantle terminal. Ampol Ltd has also agreed to rationalise its operations and participate in the new development. A joint venture agreement has been reached between Caltex and Ampol and its formalisation is dependent on approvals for the proposal from EPA and other government agencies (Westrail, Department of Planning and Urban Development, Department of Mines) and the City of Fremantle. The consolidation... Read more...

Proposed Roller Oilfield development offshore Onslow

Last updated: December 10, 1991

Proposal to develop the Roller Oilfield within permit area TP/3 Part 1, specifically the drilling of a minimum of seven development wells from four monopod structures. Read more...

Feed flexibility project - BP Refinery

Last updated: July 29, 1991

The proposal consists of modifications to, replacement of, or expansions of, eight units on the existing plant. The units involved include the: hydrofiner unit; propane production unit number 1; new straight run gasoline 'minalk' unit; new catalytic cracked spirit 'minalk' unit; new sour water treatment facilities; new sulphur recovery unit; residue cracker gas recovery unit and propane production unit number 2; and residue cracker unit - particulate emissions. Read more...

LPG extraction plant - proposed modifications to extract ethane

Last updated: October 2, 1988

Wesfarmers LPG Pty Ltd are currently constructing an LPG extraction facility at Kwinana, adjacent to Mason Road, and opposite the proposed site for the Petrochemical Industries Company Limited (PICL) proposal. The facility is designed to extract 150,000 tonnes per annum of propane and butane, with the intention of returning the remaining gases, principally methane and ethane, to the natural gas pipeline for sale to traditional natural gas customers. The supply of ethane is essential to the... Read more...

Proposed integrated petrochemical complex at Kwinana

Last updated: October 2, 1988

This initial proposal is establish an integrated petrochemical complex at Kwinana. The proposed complex would utilise natural gas and industrial salt to produce a range of products for overseas and local markets. Vinyl chloride monomer and ethylene dichloride would be exported, and caustic soda and hydrogen gas would be sold to other industries already operating in Kwinana. The proponent submitted a Notice of Intent to the Environmental Protection Authority in March 1987, indicating the nature... Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2023 Government of Western Australia. All rights reserved.