Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • EPA Board Meetings
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • (-) Remove Infrastructure filter Infrastructure
  • Iron Ore (1) Apply Iron Ore filter

Filter by current status:

  • Ministerial Statement published (22) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (5) Apply Decision on whether to assess has been published filter
  • Public Environmental Review period closed (2) Apply Public Environmental Review period closed filter
  • Assessment on Proponent Information – public submission period closed (1) Apply Assessment on Proponent Information – public submission period closed filter
  • Minister determined that the proposal should not be implemented (1) Apply Minister determined that the proposal should not be implemented filter

Filter by relevant environmental factors:

  • (-) Remove Terrestrial Fauna filter Terrestrial Fauna
  • Flora and Vegetation (27) Apply Flora and Vegetation filter
  • Inland Waters Environmental Quality (17) Apply Inland Waters Environmental Quality filter
  • Social Surroundings (16) Apply Social Surroundings filter
  • Hydrological Processes (15) Apply Hydrological Processes filter
  • Terrestrial Environmental Quality (9) Apply Terrestrial Environmental Quality filter
  • Inland Waters (6) Apply Inland Waters filter
  • Air Quality (4) Apply Air Quality filter
  • Marine Environmental Quality (4) Apply Marine Environmental Quality filter
  • Marine Fauna (4) Apply Marine Fauna filter
  • Benthic Communities and Habitats (3) Apply Benthic Communities and Habitats filter
  • Subterranean Fauna (3) Apply Subterranean Fauna filter
  • Landforms (2) Apply Landforms filter
  • Coastal Processes (1) Apply Coastal Processes filter

Filter by Proponent:

  • Main Roads Western Australia (6) Apply Main Roads Western Australia filter
  • Main Roads WA (3) Apply Main Roads WA filter
  • Public Transport Authority (3) Apply Public Transport Authority filter
  • Public Transport Authority of Western Australia (3) Apply Public Transport Authority of Western Australia filter
  • Water Corporation (3) Apply Water Corporation filter
  • City of Armadale (1) Apply City of Armadale filter
  • City of Gosnells (1) Apply City of Gosnells filter
  • Commissioner of Main Roads Western Australia (Main Roads) (1) Apply Commissioner of Main Roads Western Australia (Main Roads) filter
  • Commissioner of Railways (1) Apply Commissioner of Railways filter
  • Cranford Pty Ltd (1) Apply Cranford Pty Ltd filter
  • Fortescue Metals Group Ltd (1) Apply Fortescue Metals Group Ltd filter
  • Main Roads (1) Apply Main Roads filter
  • Metropolitan Cemeteries Board (1) Apply Metropolitan Cemeteries Board filter
  • Newcrest Mining Limited (1) Apply Newcrest Mining Limited filter
  • Point Grey Development Company Pty Ltd (1) Apply Point Grey Development Company Pty Ltd filter
  • Water Corporation of Western Australia (1) Apply Water Corporation of Western Australia filter
  • Western Australian Planning Commission (1) Apply Western Australian Planning Commission filter

Filter by region:

  • (-) Remove Perth filter Perth

Filter by last updated:

  • 2023 (4) Apply 2023 filter
  • 2022 (3) Apply 2022 filter
  • 2021 (3) Apply 2021 filter
  • 2020 (3) Apply 2020 filter
  • 2018 (2) Apply 2018 filter
  • 2017 (2) Apply 2017 filter
  • 2016 (4) Apply 2016 filter
  • 2011 (1) Apply 2011 filter
  • 2010 (1) Apply 2010 filter
  • 2009 (1) Apply 2009 filter
  • 2005 (1) Apply 2005 filter
  • 2004 (2) Apply 2004 filter
  • 2003 (1) Apply 2003 filter
  • 2002 (1) Apply 2002 filter
  • 1999 (2) Apply 1999 filter
  1. Home
  2. Proposal search
  3. Perth
  4. Infrastructure
  5. Terrestrial Fauna

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Alkimos Seawater Desalination Plant

Last updated: March 7, 2023

The Western Australian Water Corporation is proposing to construct the Alkimos Seawater Desalination Plant (ASDP) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The ASDP Proposal will be located within the Alkimos Water Precinct (Lot 1050 Marmion Avenue), approximately 40 km north of the Perth, within the northwest corridor, north of Quinns Rock beach and south of Yanchep beach.... Read more...

Thornlie-Cockburn Link (S46) [2333]

Last updated: February 28, 2023

Changes to condition 13-1 and 13-3 of Ministerial Statement 1114 (as amended) following a change to proposal after assessment. Read more...

Garden Street Extension, Southern River

Last updated: February 20, 2023

The City of Gosnells (the Proponent) proposes to extend Garden Street between Harpenden Street and Holmes Street in Southern River, which will involve the construction of an 840 m section of a dual carriageway (two lanes each direction). The Proposal is located predominantly within the suburb of Southern River, approximately 17 km south-east of Perth Central Business District (CBD) and intersects within Bush forever site 125 (Holmes Street Bushland). The construction and implementation of the... Read more...

Tonkin Highway Grade Separated Interchanges (Hale Road and Welshpool Road)

Last updated: February 2, 2023

The Commissioner of Main Roads Western Australia (Main Roads) is proposing to widen Tonkin Highway from south of Roe Highway to approximately one kilometre north of Kelvin Road to a six-lane dual carriageway. The proposal includes construction of a half diamond interchange with north facing ramps at the Hale Road intersection in Forrestfield, and a grade-separated interchange at the intersection of Tonkin Highway and Welshpool Road in Wattle Grove. The proposal includes construction of a... Read more...

Great Northern Highway Muchea to Wubin Upgrade – Stage 2 - Bindoon Bypass

Last updated: July 7, 2022

The proposal is to construct and operate a new 48 km section of the Great Northern Highway within the Shire of Chittering. The proposal would bypass the town of Bindoon located approximately 70 km north east of Perth, Western Australia. The Proposal would consist of a combination of four lane dual carriageway, four lane single carriageway and two lane single carriageway and would divert from the existing GNH at the Chittering Roadhouse running west of Bindoon and re-joining the GNH between Hay... Read more...

Thornlie-Cockburn Link

Last updated: May 4, 2022

The Public Transport Authority (PTA) proposes to construct and operate a new 14.5 kilometre (km) dual railway track to extend the existing Thornlie passenger line to Cockburn Central Station on the Mandurah line and duplicate the existing 3 km of single track between Beckenham Junction and Thornlie Station. The proposal requires the relocation of 11 km of freight line within the existing rail reserve. The proposal requires the construction and operation of two new stations at Ranford and... Read more...

Tonkin Highway Grade Separated Interchanges Kelvin Road

Last updated: April 13, 2022

Main Roads proposes to upgrade and widen a 2 km section of Tonkin Highway from four lanes to six lanes from approximately 1 km north of Kelvin Road extending south to Maddington Road. The Proposal will include construction of a grade separated interchange at Tonkin Highway and Kelvin Road and associated works such as PSP upgrade, installation of noise and retaining walls, drainage improvements and landscaping. Read more...

High Street Upgrade

Last updated: February 3, 2021

Main Roads WA is proposing to conduct works to upgrade approximately 1.5 kilometre (km) of High Street in the City of Fremantle, Western Australia. The upgrade from Stirling Highway to Carrington Street to a four lane dual carriageway is aimed at improving road safety. The works would require a total disturbance of approximately 20.1 hectares (ha), including 1.8 ha of the Fremantle Public Golf Course, Royal Fremantle Golf Club (Class A reserve) and 0.1 ha of the Fremantle Environmental Resource... Read more...

Yanchep Rail Extension Part 2 - Eglinton to Yanchep (S46) [2267]

Last updated: January 22, 2021

Changes to condition 11 Offsets following a change to proposal after assessment Read more...

Thornlie-Cockburn Link (S46) [2266]

Last updated: January 22, 2021

Changes to condition 13 Offsets following a change to proposal after assessment. Read more...

Yanchep Rail Extension: Part 2 – Eglinton to Yanchep

Last updated: November 4, 2020

The Public Transport Authority (PTA) proposes to construct and operate an extension of the existing Joondalup railway line from a point north of the proposed future Eglinton Station. The proposal will extend the Joondalup railway line through to Yanchep in the City of Wanneroo and includes a new intermodal transit station within the Yanchep City Centre area. The development envelope is up to 73 hectares (ha) and the proposal will result in potential impacts to native vegetation that includes... Read more...

Yanchep Rail Extension: Part 1 – Butler to Eglinton

Last updated: October 12, 2020

The Public Transport Authority (PTA) proposes to extend the existing Joondalup railway line by 7.3 kilometres from Butler Station to the suburb of Eglinton in the City of Wanneroo. The proposal is to construct and operate the rail extension and includes two new intermodal (rail, bus, ‘park and ride’, ‘kiss and ride’, walk and cycle) transit stations at Alkimos and Eglinton. The PTA will operate train services between Perth and Eglinton Stations and bus services from the Alkimos and Eglinton... Read more...

Roe Highway Extension (s46) [2164]

Last updated: August 6, 2020

Section 46 change to conditions - Inquire into the suitability of the implementation conditions and whether any of them should be changed. Read more...

Roe Highway Stage 8 Extension

Last updated: December 12, 2018

The proposal is to construct and operate a dual carriageway road from the current terminus of Roe Highway at Kwinana Freeway in Jandakot to Stock Road in Coolbellup., Note:, The decision of the Supreme Court of Western Australia in, Save Beeliar Wetlands (Inc) and Anor v. Jacob, [2015] WASC 482 was overturned by the Court of Appeal on Friday 15 July 2016 in, Access the Court of Appeal decision, Jacob v Save Beeliar Wetlands (Inc), [2016] WASCA 126. The effect of the Court of Appeal decision is... Read more...

Perth Groundwater Replenishment Scheme Stage 2

Last updated: December 4, 2018

The proposal is to duplicate the existing Advanced Water Recycling Plant (AWRP) at the Beenyup facility in Craigie. The proposal also includes the construction of two water recharge sites and pipeline infrastructure along a 12.8 km route through the suburbs of Woodvale, Wanneroo, Ashby and Neerabup to recharge approximately 14 GL of recycled water to the Leederville and Yarragadee aquifers. The proposal forms Stage 2 of the Perth Groundwater Replenishment Scheme (GRWS) with the expansion of 14... Read more...

Perth Darwin National Highway (Swan Valley Section)

Last updated: June 6, 2017

The proposal is to construct and operate a freeway-standard dual carriageway between the Reid Highway/Tonkin Highway junction and the Great Northern Highway at Muchea. Read more...

Point Grey Marina (s. 46) [2106]

Last updated: April 10, 2017

Condition 3-1 of Ministerial Statement 906 requires the proponent to substantially commence the proposal within five years of the date of issue of the Statement (that is, before 1 August 2017). The proposal has not yet substantially commenced. The proponent for the proposal, Point Grey Development Company Pty Ltd, has requested an extension of the Time Limit of Authorisation (now referred to as “Time Limit for Proposal Implementation”) for substantial commencement to be extended to be... Read more...

Mitchell Freeway Extension Stage 1 (Burns Beach Road to Hester Avenue)

Last updated: December 8, 2016

The proposal has been referred by Main Roads Western Australia for the assessment of Neerabup Road East and Neerabup Road West only (within the Mitchell Freeway Extension). Stage 1 (Neerabup Road East/West) project includes grade separated interchanges (including road bridges) at Neerabup Road, underpasses at Neerabup Road, and Neerabup Road upgrade from Connolly Drive to Wanneroo Road connection to freeway. Read more...

Mangles Bay Marine Based Tourist Precinct

Last updated: December 7, 2016

The proposal is to construct and operate a single entrance onshore marina to accommodate up to 500 boat pens and moorings and a surrounding land development comprising tourism, commercial, public open space and residential land uses. Read more...

Keane Road Strategic Link

Last updated: December 2, 2016

The proposal is to construct, operate and maintain a 1.5 km section of Keane road between Anstey and Skeet roads, Forrestdale. The proposal is located within Bush Forever Site 342 (approximately 369 hectares (ha)), which meets all six of the EPA’s criteria for the identification of regionally significant natural areas, contains one of the largest remaining areas of damplands of high conservation value on the Swan Coastal Plain, and is the largest consolidated area of Southern River vegetation... Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2023 Government of Western Australia. All rights reserved.