This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: March 28, 2013
The revised proposal includes: a resort complex to accommodate approximately 370 tourists; expanded airstrip facilities, involving two sealed runways (05/23 and 09/27) and one grassed runway for use by single and twin engine propeller driven aircraft. lt is expected that both experienced and trainee pilots will utilise the site; and a nine hole golf course . The location of the primary runway (05/23) has been relocated 30 metres to the east of the previously identified location to increase the... Read more...Last updated: February 12, 2013
Inquiry under s46 regarding proposed amendments to the Onslow Solar Salt Project, the subject of Ministerial Statement 401 . The changes to the project are to allow the start-up production to increase from 1.5 Mtpa to 2.5 Mtpa. Modifications proposed include: expansion of condenser pond area from 70 km 2 to 80 km 2 ; expansion of the crystalliser pond area from 7.2 km 2 to 8.2 km 2 ; area for storage of bitterns; extension of the jetty structure by 300 m; extension of the dredged approach... Read more...Last updated: January 30, 2013
The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...Last updated: January 22, 2013
Establishment of an Industrial Park at Meenaar 18 km east of Northam - Inquiry under s46 of the, Environmental Protection Act 1986, to remove the entire implementation conditions and proponent commitments of Ministerial Statement 293. Read more...Last updated: January 22, 2013
The proposal is for the construction of a deepwater port. Inquiry under s46 regarding changing condition 9 of Ministerial Statement 469 . Read more...Last updated: January 11, 2013
Brockman Iron Pty Ltd is proposing to construct a railway line and associated infrastructure in the Hamersley Iron province in the Pilbara region of Western Australia, approximately 100 kilometres (km) north west of Newman. The railway line would be approximately 79 km in length. The proposal will connect the previously approved Brockman Marillana Iron Ore Project ( Ministerial Statement 855 ) to the existing Fortescue Metals Group (FMG) railway line. Read more...Last updated: December 20, 2012
The proposal is for seven borrow pits in the Millstream Chichester National Park (MCNP) where up to 118 hectares (ha) will be disturbed, of which 90 ha is within the national park and the remainder in the excised rail corridor. All borrow pits within the MCNP are within existing Rio Tinto Iron Ore licence areas granted under the, Mining Act 1978, (Robe River Mining Company is a subsidiary of Rio Tinto) and all borrow material will only be used for projects or portions of projects that are... Read more...Last updated: December 17, 2012
Empire is proposing to conduct a 3D seismic survey over the Gingin Gas Fields including parts of the Boonanarring and Bartlett's Well nature reserves, utilising a helicopter assisted or 'heliportable' technique, transporting drilling and seismic receiver equipment by a long-line, suspended beneath a helicopter. The equipment is lowered into position and released at pre-programmed points. Charges are detonated one at a time and seismic data is recorded. Site remediation and site... Read more...Last updated: December 4, 2012
The proposal is for mining of iron ore below the watertable from the Orebody 23 deposit on the Ophthalmia Range, including de-watering operations, approximately 13 kilometres north-east of Newman, Shire of East Pilbara. Read more...Last updated: December 3, 2012
The advice applies to a proposal referred to the Environmental Protection Authority (EPA) by Capital Recycling on 6 November 2012. The proposal is to extract gravel from Lot M1822 on Diagram 8755 Horton Road, Woottating in the Shire of Northam. The proposal is a small scale gravel quarry which is not operating on a continual basis. The potential impacts of dust, noise and groundwater exposure from this proposal are not considered to be such a significant matter that assessment by the Office of... Read more...Last updated: November 1, 2012
The proposal, located 280km south east of Halls Creek and 20km west of the Western Australian-Northern Territory border, involves producing approximately 400,000t of ore for gold production from two open pits, Sandpiper and Kookaburra. The ore will be provided for blending with ore from underground mining at the existing operation (Coyote Stage 1). No crushing or processing will be conducted on site and infrastructure will be minimal. Both pits will be mined below the watertable and will not be... Read more...Last updated: June 19, 2012
The proposal is to construct and operate approximately 70 km of duplicate rail line and supporting infrastructure from the Cape Lambert Port facilities to Emu Siding. Read more...Last updated: May 2, 2012
The proposal is to supply power to an expanded mining operation at the Telfer Gold Mine. The proposed expansion of the Telfer Gold Mine associated with this proposal is being dealt with separately. That mine expansion is set out in a separate referral to the EPA (Newcrest Mining Limited 2002b). The mine expansion and power supply proposals have been separated because it is likely that the mine and power supply will eventually be operated by different proponents. Nevertheless, the proposals have... Read more...Last updated: February 28, 2012
The proposal is to construct and operate the Outer Harbour Development which includes landside and marine infrastructure for the handling and export of iron ore from BHPBIO’s operations. The Boodarie stockyard infrastructure will supply an overland conveyor to a transfer pad located to the west of the existing Finucane Island facilities. A piled jetty will transfer ore material to the ship loaders located at the piled wharf. Read more...Last updated: February 7, 2012
Inquiry under s46 in regard to amendment of conditions of Ministerial Statement 0399 Busselton Regional Aerodrome. Read more...Last updated: November 24, 2011
The proposal is for the construction and operation of a mineral sands mine at Gwindinup, approximately 25 kilometres south-south-east of Bunbury and between two and ten kilometres south of the town of Boyanup. Read more...Last updated: November 22, 2011
The proposal involves the construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Read more...Last updated: November 16, 2011
Inquiry under s46 of the EP Act to replace condition 4-4 of Ministerial Statement 399 . Read more...Last updated: September 13, 2011
Koolyanobbing Iron Ore Expansion - proposal under s46 to remove condition 7 of Ministerial Statement 627. Read more...Last updated: August 5, 2011
The proposal is to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are eleven separate looping sections proposed from south of Dampier to Wagerup West. Read more...