This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 17, 2024
The Western Australian Water Corporation is proposing to construct the Alkimos Seawater Desalination Plant (ASDP) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The ASDP Proposal will be located within the Alkimos Water Precinct (Lot 1050 Marmion Avenue), approximately 40 km north of the Perth, within the northwest corridor, north of Quinns Rock beach and south of Yanchep beach.... Read more...Last updated: April 2, 2024
Main Roads is proposing to upgrade and widen Anketell Road to an Expressway Standard for approximately 7.5 km between Leath Road and Kwinana Freeway in the City of Kwinana, WA. The Proposal will include grade separated interchanges at six locations, grade separation of road over rail at two locations and other supporting road infrastructure . Read more...Last updated: April 2, 2024
The Proposal is to construct and operate a new multimodal port in the Kwinana Industrial Area (KIA), approximately 30 km south of Perth. The Proposal includes: A port facility. Adjacent areas of landside development. An offshore breakwater. Dredging for a second main channel. Dredging for access channels, turning basins and berthing areas. Use of dredge material for beneficial re-use and, where required, placement in approved marine placement areas. Removal of the disused Kwinana Bulk Berth 1 (... Read more...Last updated: March 25, 2024
The Northern Terminal (NT) to Neerabup Terminal (NBT) 330kV Transmission Line proposal (the Proposal) is located approximately 13 km north of Perth in the City of Swan and City of Wanneroo. The Proposal is for the construction of a new 330kV dual circuit transmission line between NT in Malaga and NBT in Pinjar, a length of approximately 29 km. The purpose of the proposal is to reinforce the North Region transmission network to remove constraints on existing connected generation and provide... Read more...Last updated: March 7, 2024
The proposal is to expand CSBP's Kwinana Ammonium Nitrate Production Facility (ANPF) by incorporating additional components into the existing facility and re-engineering (debottlenecking) some existing components in order to increase ammonium nitrate production capacity from 520,000 tpa to 936,000 tpa. Read more...Last updated: March 7, 2024
GM Giacci Family Trust propose to extract limestone from Lot 4 Binningup Road, Binningup, in the Shire of Harvey. The limestone would be extracted in seven stages and would involve crushing and screening on site. The proposal would include 26 hectares of disturbance on previously cleared farmland. Read more...Last updated: February 15, 2024
Resource Group (WA) Pty Ltd proposes to construct a hard rock quarry at Lot 150 (792) Clydesdale Road, Grass valley. Holcim (Aust) Pty Ltd will be the eventual operators of the quarry. The proposal will extract, crush and screen approximately seventy thousand tonne (70,000tn) of hard rock per year with an approximate life of the quarry being 20-30 years. The proposal would require the clearing of 8.41 hectares (ha) of native vegetation and have a developmental envelope of 15.2 ha. Read more...Last updated: February 1, 2024
The City of Gosnells (the Proponent) proposes to extend Garden Street between Harpenden Street and Holmes Street in Southern River, which will involve the construction of an 840 m section of a dual carriageway (two lanes each direction). The Proposal is located predominantly within the suburb of Southern River, approximately 17 km south-east of Perth Central Business District (CBD) and intersects within Bush forever site 125 (Holmes Street Bushland). The construction and implementation of the... Read more...Last updated: January 15, 2024
The Commissioner of Main Roads Western Australia (Main Roads) is proposing to widen Tonkin Highway from south of Roe Highway to approximately one kilometre north of Kelvin Road to a six-lane dual carriageway. The proposal includes construction of a half diamond interchange with north facing ramps at the Hale Road intersection in Forrestfield, and a grade-separated interchange at the intersection of Tonkin Highway and Welshpool Road in Wattle Grove. The proposal includes construction of a... Read more...Last updated: December 22, 2023
The revised proposal is to develop a pegmatite-hosted lithium deposit at the abandoned Mt Holland Mine Site, in a Development Envelope of 3,996 ha. The Proposal involves new clearing of up to 1,885 ha of native vegetation, and use of existing cleared/disturbed land, infrastructure including a mine pit, waste rock landforms, tailings storage facility, processing plant, airstrip, accommodation village, water storage facilities, power generation infrastructure and associated infrastructure., The... Read more...Last updated: December 15, 2023
The Public Transport Authority (PTA) proposes to construct and operate an extension of the existing Joondalup railway line from a point north of the proposed future Eglinton Station. The proposal will extend the Joondalup railway line through to Yanchep in the City of Wanneroo and includes a new intermodal transit station within the Yanchep City Centre area. The development envelope is up to 73 hectares (ha) and the proposal will result in potential impacts to native vegetation that includes... Read more...Last updated: November 14, 2023
The proposal is to construct and operate a resource recovery facility within the existing Red Hill Waste Management Facility, City of Swan, for the processing of waste to produce energy, using either anaerobic digestion technology or gasification technology. Read more...Last updated: November 14, 2023
Changes to condition 3 of Ministerial Statement 976 in order to extend the Time Limit for Authorisation for substantial commencement of the proposal. Read more...Last updated: November 6, 2023
Keysbrook Leucoxene Pty Ltd is proposing to expand its current mining operation for the Keysbrook Mineral Sands Project, which operates under Ministerial Statement Numbers 810 and 1089, to include an additional 511.64 hectares of mining area located immediately west of the current operations. Read more...Last updated: September 18, 2023
The proposal involves the excavation and processing of a low-grade (2.7%) heavy mineral sands deposit near Keysbrook to produce 920,000 tonnes of Heavy Mineral Concentrate (HMC) over 8 years. An area of 30 hectares (ha) would be progressively mined at any time. Topsoil would be removed and stockpiled for use in rehabilitation. The ore would be excavated and unloaded into a dump hopper located on the pit floor. The ore would be conveyed to a screening plant where oversize material would be... Read more...Last updated: June 26, 2023
The proposal is to construct and operate a new 48 km section of the Great Northern Highway within the Shire of Chittering. The proposal would bypass the town of Bindoon located approximately 70 km north east of Perth, Western Australia. The Proposal would consist of a combination of four lane dual carriageway, four lane single carriageway and two lane single carriageway and would divert from the existing GNH at the Chittering Roadhouse running west of Bindoon and re-joining the GNH between Hay... Read more...Last updated: June 22, 2023
The Public Transport Authority (PTA) proposes to construct and operate a new 14.5 kilometre (km) dual railway track to extend the existing Thornlie passenger line to Cockburn Central Station on the Mandurah line and duplicate the existing 3 km of single track between Beckenham Junction and Thornlie Station. The proposal requires the relocation of 11 km of freight line within the existing rail reserve. The proposal requires the construction and operation of two new stations at Ranford and... Read more...Last updated: June 19, 2023
Woodside Energy Technologies Pty Ltd propose to construct and operate H2Perth, a domestic and export scale hydrogen and ammonia production facility, located approximately 40 km south of Perth. The proposal is to be located primarily within the Rockingham Industrial Zone (RIZ) in the City of Rockingham, with elements also located within the City of Kwinana and on the multi-user Kwinana Bulk Jetty. The proposal would produce approximately 3250 megawatts of gaseous hydrogen and approximately 3.25... Read more...Last updated: June 2, 2023
The proposal is to undertake an onshore three-dimensional (3D) seismic survey in the northern Perth Basin. The survey area is about 300 kilometres (km) north of Perth, and its nearest boundary is about 4.5 km north of the town of Eneabba and about 25 km southeast of the town of Dongara. The survey area is situated within four local shires: Shire of Irwin, Shire of Three Springs, Shire of Mingenew and Shire of Carnamah. The intent of the Zemira 3D Seismic Survey is to collect a high-quality 3D... Read more...