Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • Infrastructure (6) Apply Infrastructure filter
  • Industrial (5) Apply Industrial filter
  • Iron Ore (5) Apply Iron Ore filter
  • Oil and gas (5) Apply Oil and gas filter
  • Utilities (5) Apply Utilities filter
  • Land use (2) Apply Land use filter
  • Waste management (2) Apply Waste management filter
  • Aquaculture (1) Apply Aquaculture filter
  • Gold (1) Apply Gold filter
  • Manganese (1) Apply Manganese filter
  • Mineral sands (1) Apply Mineral sands filter
  • Nickel (1) Apply Nickel filter
  • Salt (1) Apply Salt filter

Filter by current status:

  • Ministerial Statement published (16) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (13) Apply Decision on whether to assess has been published filter
  • Assessment has been terminated under s40A of the EP Act (3) Apply Assessment has been terminated under s40A of the EP Act filter
  • Assessment on Proponent Information – Request for More Information published (1) Apply Assessment on Proponent Information – Request for More Information published filter
  • Environmental Scoping Document approved (1) Apply Environmental Scoping Document approved filter
  • Response to submission published (1) Apply Response to submission published filter

Filter by preliminary environmental factors:

  • (-) Remove Social Surroundings filter Social Surroundings
  • Flora and Vegetation (28) Apply Flora and Vegetation filter
  • Terrestrial Fauna (26) Apply Terrestrial Fauna filter
  • Inland Waters (11) Apply Inland Waters filter
  • Air Quality (9) Apply Air Quality filter
  • Subterranean Fauna (9) Apply Subterranean Fauna filter
  • Inland Waters Environmental Quality (7) Apply Inland Waters Environmental Quality filter
  • Marine Environmental Quality (7) Apply Marine Environmental Quality filter
  • Hydrological Processes (6) Apply Hydrological Processes filter
  • Marine Fauna (6) Apply Marine Fauna filter
  • Benthic Communities and Habitats (5) Apply Benthic Communities and Habitats filter
  • Terrestrial Environmental Quality (5) Apply Terrestrial Environmental Quality filter
  • Landforms (4) Apply Landforms filter
  • Human Health (3) Apply Human Health filter
  • Coastal Processes (2) Apply Coastal Processes filter
  • Greehouse Gas Emissions (1) Apply Greehouse Gas Emissions filter

Filter by Proponent:

  • Eastern Metropolitan Regional Council (2) Apply Eastern Metropolitan Regional Council filter
  • Main Roads WA (2) Apply Main Roads WA filter
  • Main Roads Western Australia (2) Apply Main Roads Western Australia filter
  • NW Interconnected Power Pty Ltd (2) Apply NW Interconnected Power Pty Ltd filter
  • Public Transport Authority (2) Apply Public Transport Authority filter
  • Austral Bricks (WA) Pty Ltd (1) Apply Austral Bricks (WA) Pty Ltd filter
  • Australian Gold Reagents Pty Ltd (1) Apply Australian Gold Reagents Pty Ltd filter
  • Beach Energy Limited (1) Apply Beach Energy Limited filter
  • BHP Billiton Iron Ore Pty Ltd (1) Apply BHP Billiton Iron Ore Pty Ltd filter
  • BHP Billiton Nickel West (1) Apply BHP Billiton Nickel West filter
  • City of Mandurah (1) Apply City of Mandurah filter
  • Consolidated Minerals Pty Ltd (1) Apply Consolidated Minerals Pty Ltd filter
  • DBP Development group Nominees Pty Ltd (1) Apply DBP Development group Nominees Pty Ltd filter
  • Department of Transport (1) Apply Department of Transport filter
  • Energy Resources Limited (1) Apply Energy Resources Limited filter
  • Forge Resources Swan Pty Ltd (1) Apply Forge Resources Swan Pty Ltd filter
  • GrainCorp Liquid Terminals Australia Pty Ltd (1) Apply GrainCorp Liquid Terminals Australia Pty Ltd filter
  • Grange Resources Ltd (1) Apply Grange Resources Ltd filter
  • Hamersley Iron Pty Limited (1) Apply Hamersley Iron Pty Limited filter
  • Kalgoorlie Consolidated Gold Mines Pty Ltd (1) Apply Kalgoorlie Consolidated Gold Mines Pty Ltd filter
  • Kimberley Marine Support Base Pty Ltd (1) Apply Kimberley Marine Support Base Pty Ltd filter
  • Minister for State Development (1) Apply Minister for State Development filter
  • Resource Group (WA) Pty Ltd (1) Apply Resource Group (WA) Pty Ltd filter
  • Reward Minerals (1) Apply Reward Minerals filter
  • Smiths 2014 Pty Ltd (1) Apply Smiths 2014 Pty Ltd filter
  • Stati Group of Companies (1) Apply Stati Group of Companies filter
  • Subsea 7 Contracting Pty Ltd (1) Apply Subsea 7 Contracting Pty Ltd filter
  • UIL Energy (1) Apply UIL Energy filter
  • Yilgarn Iron Pty Ltd (1) Apply Yilgarn Iron Pty Ltd filter

Filter by region:

  • Perth (12) Apply Perth filter
  • Pilbara (9) Apply Pilbara filter
  • Mid West (3) Apply Mid West filter
  • South West (3) Apply South West filter
  • Goldfields Esperance (2) Apply Goldfields Esperance filter
  • Kimberley (2) Apply Kimberley filter
  • Gascoyne (1) Apply Gascoyne filter
  • Great Southern (1) Apply Great Southern filter
  • Peel (1) Apply Peel filter
  • Wheatbelt (1) Apply Wheatbelt filter

Filter by last updated:

  • (-) Remove 2020 filter 2020
  1. Home
  2. Proposal search
  3. Social Surroundings
  4. 2020

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Bunbury Outer Ring Road (Northern and Central Sections)

Last updated: December 14, 2020

The Commissioner of Main Roads Western Australia is proposing to construct and operate the northern section and upgrade the central section of the Bunbury Outer Ring Road (BORR).   The proposal includes 19km of freeway-standard dual carriageway and associated interchanges between Forrest Highway and Boyanup-Picton Road (northern section) and between Boyanup-Picton Road and South West Highway (central section).  The proposal would require the clearing of up to 73 hectares of native vegetation... Read more...

EP371 Laurel Gas Exploration and Appraisal Program

Last updated: December 2, 2020

Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to six wells in a region of the Canning Basin that has been previously surveyed and explored for petroleum purposes. The proposal is... Read more...

Cardup Brickworks Redevelopment

Last updated: November 30, 2020

Austral Bricks is proposing the redevelopment of the Cardup Brickworks, which includes the expansion of the existing factory, increasing the design capacity from 200,000 to 250,000 tonnes per annum.  The site is located in the southern extremity of Byford.  Additional ancillary improvements include the installation of a new baghouse scrubber and a new primary crusher located in the floor of the pit.  The proposal would include:  Expanding the capacity from 200,000 to 250,000 tonnes per annum; ... Read more...

Asian Renewable Energy Hub Revised Proposal

Last updated: November 9, 2020

NW Interconnected Power Pty Ltd (the Proponent) is seeking to revise its approved proposal to develop the Asian Renewable Energy Hub.  The proposal was previously referred under section 38 of the Environmental Protection Act 1986 (EP Act), assessed by the Environmental Protection Authority (EPA) at the level of Public Environmental Review (PER) (NW Interconnected Power 2019), and subsequently approved by the Western Australian Minister for Environment in October 2020.   This referral is for ... Read more...

Yanchep Rail Extension: Part 2 – Eglinton to Yanchep

Last updated: November 4, 2020

The Public Transport Authority (PTA) proposes to construct and operate an extension of the existing Joondalup railway line from a point north of the proposed future Eglinton Station. The proposal will extend the Joondalup railway line through to Yanchep in the City of Wanneroo and includes a new intermodal transit station within the Yanchep City Centre area. The development envelope is up to 73 hectares (ha) and the proposal will result in potential impacts to native vegetation that includes... Read more...

Asian Renewable Energy Hub

Last updated: October 15, 2020

NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 644,600 ha development envelope, with a... Read more...

Yanchep Rail Extension: Part 1 – Butler to Eglinton

Last updated: October 12, 2020

The Public Transport Authority (PTA) proposes to extend the existing Joondalup railway line by 7.3 kilometres from Butler Station to the suburb of Eglinton in the City of Wanneroo. The proposal is to construct and operate the rail extension and includes two new intermodal (rail, bus, ‘park and ride’, ‘kiss and ride’, walk and cycle) transit stations at Alkimos and Eglinton. The PTA will operate train services between Perth and Eglinton Stations and bus services from the Alkimos and Eglinton... Read more...

Fimiston Gold Mine Operations Extension (Stage 3) and Mine Closure Planning

Last updated: September 30, 2020

The proposal is for the continuation of mining operations at the Fimiston site, and expansion and deepening of the Superpit to 600 metres via the Golden Pike Cutback. Additional waste dumps will be created to the north of the pit to contain 140 million tonnes of waste rock. The Fimiston I and II tailings storage facilities and/or the Kaltails tailings storage facility will be expanded to contain the additional tailings. This is a reassessment, pursuant to the Minister's decision to remit... Read more...

Mt Keith Satellite Project

Last updated: September 16, 2020

BHP Billiton Nickel West (BHPB) proposes to develop the Mt Keith Satellite Project (the proposal), to the existing Mount Keith Mining Operations. The proposal is located approximately 80 km north of Leinster in the Shire of Leonora. The proposal includes clearing of up to 842 hectares of native vegetation (which is also fauna habitat) for two open pits, a Waste Rock Landform and a transport corridor, with minor ancillary infrastructure to support the mining process. Read more...

Smiths Beach Development (S46) [2259]

Last updated: September 14, 2020

Change to condition 2-1 in order to extend the Time Limit for substantial commencement of the proposal. Read more...

Tim's Thicket Liquid Waste Facility Upgrade

Last updated: September 10, 2020

The Tims Thicket Waste Management Facility is located approximately 15 km south of Mandurah. The Site covers an area of 28 hectares. The Site has been in operation since 1995. The proposal seeks to recommence acceptance of liquid waste at the facility by implementing a suite of improvements, including refurbishing and repurposing the existing infrastructure. The proposed design capacity is up to 6500 kL of liquid waste per year, consisting of septage and grease trap waste., s43A Change to... Read more...

Raven 2D Seismic Acquisition Survey

Last updated: September 4, 2020

Energy Resources Limited proposes to undertake a 2D onshore seismic acquisition survey to map the subsurface geology of the area, within petroleum exploration permit 432 in the Shire of Dandaragan. The proposal comprises a total of 125 line kilometres of 2D seismic lines within an area of about 122.6 km2. The proposal will require temporary disturbance of up to 40 hectares of native vegetation to create access lanes for the vibroseis trucks and light vehicles. The proposal is to be undertaken... Read more...

Keysbrook Motorsport Facility

Last updated: August 10, 2020

The proposal is to construct and operate a multi-use motorsport complex on Lot 78 Punrak Road Keysbrook, and to redirect stormwater to Lot 400 Wigg Road Keysbrook. The proposal would be used for road safety driver training, amateur car events, a go-kart track, V8 supercar events, motorbikes and world rally championships. The proposal would operate seven days a week from 8.00 am to 6.00 pm, with potential for extended hours over weekends for special events. Read more...

Roe Highway Extension (s46) [2164]

Last updated: August 6, 2020

Section 46 change to conditions - Inquire into the suitability of the implementation conditions and whether any of them should be changed. Read more...

Kimberley Marine Offloading Facility

Last updated: July 24, 2020

Kimberley Marine Support Base Pty Ltd (KMSB) are proposing to develop the Kimberley Marine Offloading Facility at the Port of Broome, approximately 200 metres south of the existing Broome Wharf. The proposal includes construction and operation of a deep-water floating wharf, along with associated onshore hardstand and terminal facilities suitable for container and general cargo stevedoring for coastal trading vessels, berthing and mooring for Cruise vessels and Roll on/Roll off ships.... Read more...

Gas Pipeline from Griffin Oilfield to Mainland Facility near Onslow (S46) [2221]

Last updated: July 23, 2020

Change to condition 1 commitment 39 of Ministerial Statement 308 in order to consider the change of distance to the nearest sensitive receptor. Read more...

Albany Iron Ore Project - Southdown Magnetite Proposal (s46) [2222]

Last updated: July 23, 2020

Changes to Condition 3 in order to extend the Time Limit of Authorisation for commencement of the proposal. Read more...

Learmonth Pipeline Fabrication Facility

Last updated: June 29, 2020

Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The onshore pipeline fabrication site and associated infrastructure includes two Bundle tracks (approximately 10 km in length) along which the Bundles will be constructed... Read more...

Oakajee Deepwater Port, Oakajee, Shire of Chapman Valley (s46) [2171]

Last updated: June 18, 2020

Inquiry under s46 into changing the conditions (extension of time limit for proposal implementation) of Ministerial Statements 469, 774, 815 and 927. Read more...

2D Seismic Acquisition Survey

Last updated: June 3, 2020

UIL Energy Ltd proposes to conduct a 2D seismic survey within exploration permits 447, 488 and 489 near the town of Badgingarra (Shire of Dandaragan). The proposal would involve clearing of up to 24 hectares of native vegetation within a proposal area of 101,813 hectares. Clearing will occur within Badgingarra National Park, Wongonderrah and Twyata Nature Reserve, unallocated Crown Land, road reserves, and private properties. Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2023 Government of Western Australia. All rights reserved.