Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions
      • Ministerial Statements
      • Ministerial decisions (s45(8))

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chairman's Determinations

    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidelines for planners and developers
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • Infrastructure (8) Apply Infrastructure filter
  • Iron Ore (6) Apply Iron Ore filter
  • Sand, rock, gravel and clay (4) Apply Sand, rock, gravel and clay filter
  • Industrial (3) Apply Industrial filter
  • Mineral sands (3) Apply Mineral sands filter
  • Oil and gas (3) Apply Oil and gas filter
  • Waste management (3) Apply Waste management filter
  • Land use (1) Apply Land use filter
  • Nickel (1) Apply Nickel filter
  • Potash (1) Apply Potash filter
  • Power generation (1) Apply Power generation filter
  • Salt (1) Apply Salt filter
  • Utilities (1) Apply Utilities filter

Filter by current status:

  • Ministerial Statement published (19) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (10) Apply Decision on whether to assess has been published filter
  • Environmental Scoping Document approved (3) Apply Environmental Scoping Document approved filter
  • Assessment has been terminated under s40A of the EP Act (1) Apply Assessment has been terminated under s40A of the EP Act filter
  • EPA Report and Recommendations released - not appealable (1) Apply EPA Report and Recommendations released - not appealable filter

Filter by preliminary environmental factors:

  • (-) Remove Social Surroundings filter Social Surroundings
  • Flora and Vegetation (24) Apply Flora and Vegetation filter
  • Terrestrial Fauna (20) Apply Terrestrial Fauna filter
  • Inland Waters Environmental Quality (14) Apply Inland Waters Environmental Quality filter
  • Air Quality (13) Apply Air Quality filter
  • Hydrological Processes (13) Apply Hydrological Processes filter
  • Terrestrial Environmental Quality (8) Apply Terrestrial Environmental Quality filter
  • Inland Waters (7) Apply Inland Waters filter
  • Marine Environmental Quality (4) Apply Marine Environmental Quality filter
  • Subterranean Fauna (4) Apply Subterranean Fauna filter
  • Marine Fauna (3) Apply Marine Fauna filter
  • Benthic Communities and Habitats (2) Apply Benthic Communities and Habitats filter
  • Landforms (2) Apply Landforms filter
  • Coastal Processes (1) Apply Coastal Processes filter
  • Human Health (1) Apply Human Health filter

Filter by Proponent:

  • Fortescue Metals Group Limited (2) Apply Fortescue Metals Group Limited filter
  • Keysbrook Leucoxene Pty Ltd (2) Apply Keysbrook Leucoxene Pty Ltd filter
  • BC Pilbara Iron Ore Pty Ltd (1) Apply BC Pilbara Iron Ore Pty Ltd filter
  • Brikmakers (BGC Australia Pty Ltd) (1) Apply Brikmakers (BGC Australia Pty Ltd) filter
  • City of Busselton (1) Apply City of Busselton filter
  • Cleanaway Solid Waste Pty Ltd (1) Apply Cleanaway Solid Waste Pty Ltd filter
  • Commissioner of Main Roads (1) Apply Commissioner of Main Roads filter
  • DDG Operations Pty Ltd (1) Apply DDG Operations Pty Ltd filter
  • Doyles Lime Services Pty Ltd (1) Apply Doyles Lime Services Pty Ltd filter
  • Fortescue Metals Group Ltd (1) Apply Fortescue Metals Group Ltd filter
  • Image Resources NL (1) Apply Image Resources NL filter
  • Italia Stone Group Pty Ltd (1) Apply Italia Stone Group Pty Ltd filter
  • Kwinana WTE Project Co Pty Ltd (1) Apply Kwinana WTE Project Co Pty Ltd filter
  • Leichhardt Industrials Pty Ltd (1) Apply Leichhardt Industrials Pty Ltd filter
  • Main Roads Western Australia (1) Apply Main Roads Western Australia filter
  • Metropolitan Redevelopment Authority (1) Apply Metropolitan Redevelopment Authority filter
  • Mineral Resources Limited (1) Apply Mineral Resources Limited filter
  • MRC Graphite Pty Ltd (1) Apply MRC Graphite Pty Ltd filter
  • New Energy Corporation Pty Ltd (1) Apply New Energy Corporation Pty Ltd filter
  • Phoenix Energy Australia Pty Ltd (1) Apply Phoenix Energy Australia Pty Ltd filter
  • Pilbara Energy Company Pty Ltd (1) Apply Pilbara Energy Company Pty Ltd filter
  • Questdale Holdings Pty Ltd (1) Apply Questdale Holdings Pty Ltd filter
  • Ravensthorpe Nickel Operations Pty Ltd (1) Apply Ravensthorpe Nickel Operations Pty Ltd filter
  • Robe River Mining Co. Pty. Ltd (1) Apply Robe River Mining Co. Pty. Ltd filter
  • Salt Lake Potash Limited (1) Apply Salt Lake Potash Limited filter
  • Sinosteel Midwest Corporation Limited (1) Apply Sinosteel Midwest Corporation Limited filter
  • SITA Australia Pty Ltd (1) Apply SITA Australia Pty Ltd filter
  • Subsea 7 Australia Contracting PTY LTD (1) Apply Subsea 7 Australia Contracting PTY LTD filter
  • The Department of Agriculture and Food (1) Apply The Department of Agriculture and Food filter
  • Wasterock Pty Ltd; Hazelland Pty Ltd (1) Apply Wasterock Pty Ltd; Hazelland Pty Ltd filter
  • Wesfarmers LPG Pty Ltd (1) Apply Wesfarmers LPG Pty Ltd filter
  • Woodside Energy Ltd (1) Apply Woodside Energy Ltd filter
  • Yara Pilbara Nitrates Pty Ltd (1) Apply Yara Pilbara Nitrates Pty Ltd filter

Filter by region:

  • Perth (11) Apply Perth filter
  • Pilbara (10) Apply Pilbara filter
  • Goldfields Esperance (4) Apply Goldfields Esperance filter
  • South West (4) Apply South West filter
  • Wheatbelt (3) Apply Wheatbelt filter
  • Mid West (2) Apply Mid West filter
  • Peel (1) Apply Peel filter

Filter by last updated:

  • (-) Remove 2019 filter 2019
  1. Home
  2. Proposal search
  3. Social Surroundings
  4. 2019

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Lots 2 and 10 Rowley Road, Mandogalup

Last updated: December 10, 2019

Questdale Holdings Pty. Ltd. (the proponent) are proposing to clear vegetation for bushfire fuel reduction and to extend an existing sand quarry extraction operation within Lots 2 and 10 Rowley Road, Mandogalup.  The proposal area consists of 43.67 hectares (ha) and is located on freehold land. The proponent proposes to extract sand at a rate of 195,000 tonnes per annum for a period of 10 years.  Excavated material will be screened prior to loading. The proponent proposes to clear approximately... Read more...

Revised Iron Valley Iron Ore Project

Last updated: November 26, 2019

The Proposal is located within the Pilbara Interim Biogeographic Regionalisation for Australia (IBRA) region and is located within the Fortescue and Hamersley IBRA subregions. The Approved Project (authorised by Ministerial Statement 933 , 1 February 2013) is an above the water table open cut mine and associated infrastructure, located on mining tenement M470/1439. This proposal is to mine below the water table. Read more...

Pluto North West Shelf Interconnector Pipeline

Last updated: November 21, 2019

The Proposal is to construct and operate the Pluto to Northwest Shelf Interconnector, a 3.3 km long, steel buried natural gas pipeline, connecting the Pluto Interconnector Compressor Station to the Karratha Gas Plant which is operated by Woodside on behalf of the North West Shelf Project participants, located on the Burrup Peninsula in the North of Western Australia. The proposal will require the clearing of an estimated 10.69 ha.3.26 ha within the Karratha Gas Plant Lease and Buffer Zone Lease... Read more...

Tonkin Highway, Guildford Road to Great Eastern Highway Upgrade

Last updated: October 28, 2019

The Commissioner of Main Roads is proposing to upgrade the section of Tonkin Highway between Guildford Road (Bayswater) and the Great Eastern Highway (Belmont). The key components of the project are: construction and operation of two new bridges over the Swan River road widening, reconfiguration, and modification of existing interchanges construction and operation of on/off ramps and collector distributor roads connectivity of the principal shared path to and along Tonkin Highway. The proposal... Read more...

Keysbrook Mineral Sands Mine

Last updated: October 14, 2019

The proposal involves the excavation and processing of a low-grade (2.7%) heavy mineral sands deposit near Keysbrook to produce 920,000 tonnes of Heavy Mineral Concentrate (HMC) over 8 years. An area of 30 hectares (ha) would be progressively mined at any time. Topsoil would be removed and stockpiled for use in rehabilitation. The ore would be excavated and unloaded into a dump hopper located on the pit floor. The ore would be conveyed to a screening plant where oversize material would be... Read more...

Technical Ammonium Nitrate Production Facility, Burrup Peninsula, Shire of Roebourne, Ministerial Statement 870 (s46) [2166]

Last updated: September 18, 2019

Inquire into and report on the matter of changing implementation condition 5-1: Air Quality in Ministerial Statement 870 for the above proposal to protect rock art. Read more...

Sand and Clay Extraction, 1728 Great Northern Highway, Bullsbrook

Last updated: September 2, 2019

Brikmakers (BGC Australia Pty Ltd) propose to extract clay and sand at Lots 5 and 6 (1728) Great Northern Highway, Bullsbrook. The site was historically used for the grazing of cattle. Therefore, the majority of the site has been previously cleared of vegetation. Several stands of native trees are located mostly to the west of Lot 5 and to the north of Lot 6. The proposal would include the clearing of 7 hectares of native vegetation and excavation of up to 26 metres in depth. Read more...

Hard Rock Quarry, Lot 800 Pruden Road, Whitby

Last updated: August 29, 2019

Italia Stone Group proposes to develop a hard rock quarry at Lot 800 Pruden Road Whitby, approximately 3.5 kilometres east of Mundijong in the Shire of Serpentine-Jarrahdale. The proposed quarry is on freehold land and is for the extraction of 50,000 to 100,000 tonnes of hard rock per annum for a period of 20 years. The material will be extracted by drill and blast methods and hauled by truck to a processing area for crushing and stockpiling on site. Read more...

Mesa A Hub Revised Proposal

Last updated: August 21, 2019

Robe River Mining Co Pty Ltd is seeking to extend the existing Mesa A / Warramboo Iron Ore Mining Project by extending the existing mining operation and developing four new nearby deposits. The proposal is 43 kilometres west of Pannawonica in the Pilbara Region. The proposal would require an additional 3000 hectares of clearing of native vegetation, with some below water table mining. A water supply would also be required and discharge of any excess water to Warramboo Creek. Read more...

Eliwana Iron Ore Mine

Last updated: August 14, 2019

Fortescue Metals Group Ltd proposes to develop the Eliwana Mine Project in the Pilbara region of Western Australia. The Eliwana Mine Project Area is located approximately 90 km west-northwest of Tom Price. Over the life of the mine, the average annual production rate is estimated at 30 Mtpa but infrastructure will be constructed to reflect peaks in the annual production rate up to 50 Mtpa. The estimated mine life is 24 years. The proposal involves the clearing of up to 8,560 ha of native... Read more...

Eliwana Railway Project

Last updated: August 14, 2019

Fortescue Metals Group Limited proposes to build a 120 km railway linking their existing Solomon Mine with their proposed Eliwana Iron Ore Mine, located 90 km west-northwest of Tom Price (Shire of Ashburton). The eastern section of the proposed Eliwana Railway Project development envelope is adjacent to Karijini National Park. Proposed Infrastructure within the Rail Development Envelope includes: Railway and associated embankment; Rail loop; Crossing/passing loops; Railway overpass; Train... Read more...

Boonanarring Mineral Sands Mine

Last updated: August 6, 2019

Open cut dry mining of mineral sands and the processing of mined material through primary and secondary concentration plants and dry minerals separation. It includes the construction and operation of associated infrastructure and a modification to the intersection of Brand Hwy with Wannamal Road West. Read more...

Cleanaway Banksia Road Landfill – New Tailings Storage Cell

Last updated: July 8, 2019

The proposal involves the construction and commissioning of a new tailings storage cell (Cell 12A) for the storage of lithium processing tailings at the Banksia Road Waste Management Facility (Banksia Road WMF) located at Lot 2 on Plan 65861, Crooked Brook in Western Australia (WA). It is proposed that Cell 12A will have the capacity to contain approximately 522,000 tonnes of tailings. Read more...

Pluto LNG Development (Site B Option), Burrup Peninsula

Last updated: July 1, 2019

The construction of facilities for the development of the Pluto Gas Field on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on the Burrup Peninsula. Extensive dredging will be undertaken adjacent to the export facility. Read more...

Remediation of Midland Railway Workshops site (s46)

Last updated: June 28, 2019

Read more...

Eramurra Industrial Salt Project

Last updated: June 24, 2019

Leichhardt Industrials Pty Ltd (Leichhardt) is seeking to develop a salt production and export operation in the Cape Preston East area, approximately 55 kilometres (km) westsouth-west of Karratha in Western Australia (WA). The proposal will utilise seawater and evaporation to produce concentrated salt products for export. The proposal includes the development of a series of concentrator and crystalliser ponds, processing plant, product pipeline and offshore export facility (offshore pylon wharf... Read more...

Lake Way SOP Demonstration Plant

Last updated: June 24, 2019

Salt Lake Potash proposes to develop the Lake Way SOP Demonstration Plant. The proposal is ocated in and around Lake Way, approximately 25 kilometres south of Wiluna. The proposal will extract and evaporate natural brines to produce up to 50,000 tonnes per year of Sulphate of Potash (SOP). The activities and infrastructure include: On-playa infrastructure – brine extraction trenches; pond infrastructure; and associated pipework. Off-playa infrastructure – processing plant, process water... Read more...

Weld Range Iron Ore Project (S46) [2205]

Last updated: June 21, 2019

Read more...

Cloudbreak Life of Mine Expansion

Last updated: June 6, 2019

The proposal includes the existing Cloudbreak iron ore mine and proposed expansion. The existing mine includes open pit strip mining, backfilling of pits, progressive rehabilitation and ore processing. The expansion includes increasing ore production, development of new pits and permanent waste landforms, the development of new infrastructure, additional dewatering and water disposal activities, an upgrade of the ore processing facility. Read more...

Ravensthorpe Nickel Project (s46)

Last updated: May 23, 2019

Inquiry under s46 into the request for a number of substantial changes to the Ravensthorpe Nickel Project, located approximately 35 km east of Ravensthorpe, the subject of Ministerial Statement 509 . In summary, the proposed changes include: mining of additional ore reserves contained within the Shoemaker-Levy and Hale-Bopp deposits and a resulting increase in clearing within the Bandalup Corridor; changes to the processing of ore and the final product: a) deletion of nickel electrowinning,... Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
+618 6364 7000
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2021 Government of Western Australia. All rights reserved.