This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: October 25, 2024
VRX Silica Ltd propose to develop a silica sand mine in the Geraldton Sandplain bioregion of Western Australia, approximately 270 km north of Perth. The proposal would include a total disturbance of 412.2 hectares of native vegetation and will involve sequential mining of sand 8 – 15 metres below the soil surface. Vegetation and topsoil will be relocated to rehabilitation areas using the Vegetation Direct Transfer method. Mining will be undertaken in sections by removing blocks (typically 150m... Read more...Last updated: October 7, 2024
Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to twenty wells in a region of the Canning Basin that has been previously surveyed and explored for petroleum purposes. The proposal is... Read more...Last updated: October 4, 2024
The Proposal is located 210 km south of Port Hedland and 180 km north west of Newman in the Pilbara region of Western Australia. The proposal is located within a 40,653 ha Development Envelope and will require clearing of no more than 9,628 ha of native vegetation. The proposal includes, but is not limited to, the following: - The development of a series of above and below water table mine pits; - Ore processing facility; - Groundwater abstraction for water supply (for the mine and all... Read more...Last updated: September 27, 2024
The Utah Point Berth Project consists of two separate stages: Stage A: Dredging and Reclamation; and Stage B: Construction and Operation. Stage A, dredging and reclamation works for the UPBP was approved by the Minister for Environment as an amendment to the existing Fortescue Metals Group (FMG) approval and managed according to the approved conditions. The works for Stage A have been successfully completed. The EPA determined that Stage B, the construction and ongoing operation of stockyard... Read more...Last updated: September 5, 2024
The Brockman Syncline proposal is located approximately 60 km west-north west of Tom Price, in the central Pilbara region of Western Australia. The proposal includes up to 9,977 ha of native vegetation clearing to support the development of new and above and below water table mining areas in order to sustain mining at three existing operations; Nammuldi-Silvergrass Brockman 2 Brockman 4 The proposal includes, but is not limited to the following: Dewatering and surplus water management,... Read more...Last updated: August 2, 2024
The Proposal will use combined onshore wind and solar energy of approximately 5.2 gigawatt (GW) capacity to produce green hydrogen which will be converted to an estimated 2 Million tonnes per annum (Mtpa) of green ammonia for export to emerging green energy markets. The Proposal is located within the Shire of Northampton, Western Australia (WA), approximately 20 km north of Kalbarri. The Proposal comprises the following major components: a wind and solar farm with a combined installed capacity... Read more...Last updated: July 29, 2024
South32 Worsley Alumina Pty Ltd currently operates the Boddington Bauxite Mine (located approximately 5km south-west of Boddington), Worsley Refinery (located approximately 15 km north-west of Collie) and port operations at the Bunbury Port. The new proposal is for the: · expansion of the existing mining area and incorporation of new mining areas; · development of a bauxite transport corridor; · development of a contingency mining area and maintenance work at the Refinery; and · development of... Read more...Last updated: July 8, 2024
AGI Operations Pty Limited propose to construct and operate a gas processing plant and pipeline associated with the development of the West Erregulla gas field, located approximately 230 kilometres (km) north-east of Perth, and 50 km south-east of Dongara, Western Australia. The processing plant will process gas produced from third party owned upstream wells. The processed gas will then be transported via a new interconnecting pipeline to the Dampier to Bunbury Natural Gas Pipeline (DBNGP). The... Read more...Last updated: June 19, 2024
FI Joint Venture Pty Ltd is proposing to construct and operate a magnetite iron ore project, with mining, processing and associated infrastructure. The proposed mine is located approximately 225 kilometres (km) east-northeast of Geraldton and 15 km northeast of Yalgoo within the Shire of Yalgoo. The proposal includes a magnetite slurry pipeline and a water pipeline to Geraldton Port and a gas supply pipeline from the Dampier to Bunbury Natural Gas Pipeline network. Mining of the magnetite will... Read more...Last updated: April 24, 2024
The proposal is for the Stage 2 expansion of the Murrin Murrin Nickel-Cobalt mining and processing operation (Stage 1), 60 kilometres east of Leonora. The Stage 2 expansion includes the mining of additional ore; an expansion of the processing plant to process additional ore; and the development of additional infrastructure associated with mining and processing of the ore. Read more...Last updated: April 24, 2024
Kalgoorlie Consolidated Gold Mines is seeking to expand the Fimiston Gold mine operations (Fimiston), located 600 kilometres East of Perth, and adjacent to the City of Kalgoorlie-Boulder, Western Australia. The proposal is a significant amendment to the current Fimiston Gold Mine Operations Extension (Stage 2) and Mine Closure Planning, approved under Ministerial Statement 782, operated by Kalgoorlie Consolidated Gold Mines (KCGM). The proposal is for the expansion of the Fimiston operations in... Read more...Last updated: April 22, 2024
Chalice Mining Limited proposes development of the Gonneville Nickel-Copper-Platinum Group Element (PGE) Project. The proposal is located within the Wheatbelt Region, approximately 70km north-east of Perth, 25 km west of Toodyay and 25 km south-east of Bindoon. The proposal comprises of a mine site including an open mine pit and/or underground mine and infrastructure corridor options for water and power supply. Road and/or existing rail infrastructure will be utilised in transporting supplies... Read more...Last updated: April 17, 2024
The Western Australian Water Corporation is proposing to construct the Alkimos Seawater Desalination Plant (ASDP) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The ASDP Proposal will be located within the Alkimos Water Precinct (Lot 1050 Marmion Avenue), approximately 40 km north of the Perth, within the northwest corridor, north of Quinns Rock beach and south of Yanchep beach.... Read more...Last updated: April 16, 2024
The Waitsia Gas Project Stage 2 is a conventional gas proposal located approximately 16km East-South-East of the Dongara-Port Denison town sites. The proposal includes clearing of up to 17 ha of native vegetation to support the following: Construction and operation of a new gas processing plant with a maximum export capacity of 250 terajoules per day; Drilling of up to 6 new production wells to supplement the existing 2 wells; Installation of a gas gathering system comprising of flowlines and... Read more...Last updated: April 2, 2024
DevelopmentWA is seeking to develop the Kemerton Strategic Industrial Area (KSIA) for the purpose of industrial and infrastructure development as a strategic proposal. The KSIA is located within the Shire of Harvey, 17 kilometres north of Bunbury. The KSIA key characteristics are: Development of the Kemerton Strategic industry Zone (Industry Core) which is approximately 2,024 hectares (ha). There is an approximate 50-year time period for development. Ultimate land use proposed is to be heavy... Read more...Last updated: March 14, 2024
Caravel Minerals Limited is seeking to develop the Caravel Copper Project, located in the Western Australian (WA) Wheatbelt approximately 150 km north of Perth. The Proposal will produce copper concentrate, which will be transported to port by road. The Proposal includes mine pits, waste rock landforms, tailings storage, ore processing and transfer infrastructure and associated infrastructure such as workshops, laydown areas, landfill, communications, offices, ablutions, wastewater treatment,... Read more...Last updated: March 7, 2024
The proposal is to expand CSBP's Kwinana Ammonium Nitrate Production Facility (ANPF) by incorporating additional components into the existing facility and re-engineering (debottlenecking) some existing components in order to increase ammonium nitrate production capacity from 520,000 tpa to 936,000 tpa. Read more...Last updated: February 19, 2024
The requested change relates to condition 3 of Ministerial Statement 1056 (as relevant to Ministerial Statement 891) for an extension to the Time Limit for Proposal Implementation for the proposal approved under MS 891. With the agreement of the proponent, the Environmental Protection Authority will take no further action in relation to the s.46 inquiry into the proposed changes to condition 3 of Ministerial Statement 1056 (as relevant to Ministerial Statement 891) Read more...Last updated: February 15, 2024
Resource Group (WA) Pty Ltd proposes to construct a hard rock quarry at Lot 150 (792) Clydesdale Road, Grass valley. Holcim (Aust) Pty Ltd will be the eventual operators of the quarry. The proposal will extract, crush and screen approximately seventy thousand tonne (70,000tn) of hard rock per year with an approximate life of the quarry being 20-30 years. The proposal would require the clearing of 8.41 hectares (ha) of native vegetation and have a developmental envelope of 15.2 ha. Read more...