This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: February 5, 2024
Province Resources Ltd propose to use combined onshore wind and solar energy to produce green hydrogen and ammonia for export to the green energy market. The proposal is distributed across 3 distinct locations within the Shire of Carnarvon, Western Australia. The proposal will comprise the following major elements: • up to 945 ha (6.8 GW) of wind turbines and up to 10,000 ha of solar arrays (5.2 GW) • a new multiuser port facility with a material offloading facility and export terminal •... Read more...Last updated: June 7, 2023
The Ridley Magnetite Project (the Proposal) is located approximately 57 km east of Port Hedland. The proposal is located within a 14,181 ha Development Envelope with an indicative disturbance footprint of 7,406 ha. The proposal is for the mining and processing of iron ore to produce 3 Million tonnes per annum (Mtpa) of magnetite concentrate for export under Stage 1, with an increase to 16.5 Mtpa under Stage 2. The proposal includes a single pit (below water table), run-of-mine pad, concentrate... Read more...Last updated: May 16, 2022
The Proposal will use combined onshore wind and solar energy of approximately 5.2 gigawatt (GW) capacity to produce green hydrogen which will be converted to an estimated 2 Million tonnes per annum (Mtpa) of green ammonia for export to emerging green energy markets. The Proposal is located within the Shire of Northampton, Western Australia (WA), approximately 20 km north of Kalbarri. The Proposal comprises the following major components: a wind and solar farm with a combined installed capacity... Read more...Last updated: January 24, 2022
Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. The EPA considered the Study of the Cumulative Impacts of Air Emissions in the Murujuga Airshed in its assessment of the Perdaman Urea Project. Read more...Last updated: June 9, 2021
VBX Limited propose to develop a bauxite mine located approximately 15 km west of the town of Kalumburu in the Kimberley. The proposal involves the mining of bauxite in the Kimberley and the use of a conveyor to transport processed ore to a barge-loading facility in Napier Broome Sound, and then trans-shipping of ore. Read more...Last updated: June 18, 2020
Inquiry under s46 into changing the conditions (extension of time limit for proposal implementation) of Ministerial Statements 469, 774, 815 and 927. Read more...Last updated: June 11, 2018
The proposal is for the construction and operation of a technical ammonium nitrate production facility (TANPF) on Site D within the King Bay/Hearson Cove Industrial Estate on the Burrup Peninsula. The proposal is located approximately 13 kilometres north-west of Karratha. Read more...Last updated: December 21, 2016
Note: In the matter of The Wilderness Society of WA (Inc) –v- Minister for Environment [2013] WASC, the Supreme Court of Western Australia found the Minister’s agreement decision invalid because the EPA’s decision to report was invalid., The proposal is a strategic environmental assessment for a common user LNG hub precinct for future Browse Basin gas processing in the Kimberley Region. Read more...Last updated: April 30, 2015
To expand the liquefied natural gas (LNG) production capacity of the existing proposal from 15 million tonnes per annum (Mtpa) to 20 Mtpa (nominal). Read more...Last updated: January 22, 2013
The proposal is for the construction of a deepwater port. Inquiry under s46 regarding changing condition 9 of Ministerial Statement 469 . Read more...Last updated: December 1, 2009
The proposal is to construct a deepwater port to service fully loaded Panamax sized vessels (65 000 DWT) at Oakajee, approximately 23 kilometres north of Geraldton. Three site locations (north, south and central) and two different design options (inshore and off-shore) were considered in developing the proposal. The design option favoured by the proponent is an in-shore port design at the northern sector. The port study area is approximately 23 kilometres north of Geraldton. The port will... Read more...