Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • EPA Board Meetings
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • Iron Ore (4) Apply Iron Ore filter
  • Oil and gas (3) Apply Oil and gas filter
  • Sand, rock, gravel and clay (3) Apply Sand, rock, gravel and clay filter
  • Bauxite (2) Apply Bauxite filter
  • Industrial (2) Apply Industrial filter
  • Utilities (2) Apply Utilities filter
  • Gold (1) Apply Gold filter
  • Infrastructure (1) Apply Infrastructure filter
  • Potash (1) Apply Potash filter
  • Power generation (1) Apply Power generation filter
  • Rare earth elements (1) Apply Rare earth elements filter

Filter by current status:

  • Decision on whether to assess has been published (5) Apply Decision on whether to assess has been published filter
  • Environmental Scoping Document approved (5) Apply Environmental Scoping Document approved filter
  • Ministerial Statement published (4) Apply Ministerial Statement published filter
  • Assessment on Proponent Information – public submission period closed (2) Apply Assessment on Proponent Information – public submission period closed filter
  • Assessment has been terminated under s40A of the EP Act (1) Apply Assessment has been terminated under s40A of the EP Act filter
  • Environmental Scoping Document - public submission period closed (1) Apply Environmental Scoping Document - public submission period closed filter
  • Public Environmental Review document in preparation (1) Apply Public Environmental Review document in preparation filter
  • Public Environmental Review period closed (1) Apply Public Environmental Review period closed filter

Filter by preliminary environmental factors:

  • (-) Remove Air Quality filter Air Quality
  • (-) Remove Inland Waters filter Inland Waters
  • (-) Remove Terrestrial Fauna filter Terrestrial Fauna
  • Flora and Vegetation (20) Apply Flora and Vegetation filter
  • Social Surroundings (19) Apply Social Surroundings filter
  • Terrestrial Environmental Quality (10) Apply Terrestrial Environmental Quality filter
  • Greehouse Gas Emissions (9) Apply Greehouse Gas Emissions filter
  • Subterranean Fauna (6) Apply Subterranean Fauna filter
  • Human Health (3) Apply Human Health filter
  • Benthic Communities and Habitats (2) Apply Benthic Communities and Habitats filter
  • Coastal Processes (2) Apply Coastal Processes filter
  • Marine Environmental Quality (2) Apply Marine Environmental Quality filter
  • Landforms (1) Apply Landforms filter
  • Marine Fauna (1) Apply Marine Fauna filter

Filter by Proponent:

  • AGI Operations Pty Limited (1) Apply AGI Operations Pty Limited filter
  • Alcoa of Australia Limited (1) Apply Alcoa of Australia Limited filter
  • Bennett Resources Pty Ltd (1) Apply Bennett Resources Pty Ltd filter
  • GrainCorp Liquid Terminals Australia Pty Ltd (1) Apply GrainCorp Liquid Terminals Australia Pty Ltd filter
  • Grange Resources Ltd (1) Apply Grange Resources Ltd filter
  • Hamersley Iron Pty Limited (1) Apply Hamersley Iron Pty Limited filter
  • Hancock Prospecting Pty Ltd (1) Apply Hancock Prospecting Pty Ltd filter
  • Hanson Construction Materials Pty Ltd (1) Apply Hanson Construction Materials Pty Ltd filter
  • Kalgoorlie Consolidated Gold Mines Pty Ltd (1) Apply Kalgoorlie Consolidated Gold Mines Pty Ltd filter
  • Lynas Kalgoorlie Pty Ltd (1) Apply Lynas Kalgoorlie Pty Ltd filter
  • Main Roads Western Australia (1) Apply Main Roads Western Australia filter
  • Murchison Hydrogen Renewables Pty Ltd as trustee for Murchison Hydrogen Renewables Project Trust (1) Apply Murchison Hydrogen Renewables Pty Ltd as trustee for Murchison Hydrogen Renewables Project Trust filter
  • Piper Preston Pty Ltd (1) Apply Piper Preston Pty Ltd filter
  • Roy Hill Iron Ore Pty Ltd (1) Apply Roy Hill Iron Ore Pty Ltd filter
  • South32 Worsley Alumina Pty Ltd (1) Apply South32 Worsley Alumina Pty Ltd filter
  • VBX Limited (1) Apply VBX Limited filter
  • VRX Silica Limited (1) Apply VRX Silica Limited filter
  • VRX Silica Ltd (1) Apply VRX Silica Ltd filter
  • Western Australian Land Authority (trading as DevelopmentWA) (1) Apply Western Australian Land Authority (trading as DevelopmentWA) filter

Filter by region:

  • Mid West (5) Apply Mid West filter
  • Pilbara (4) Apply Pilbara filter
  • Kimberley (3) Apply Kimberley filter
  • Goldfields Esperance (2) Apply Goldfields Esperance filter
  • Peel (2) Apply Peel filter
  • Perth (2) Apply Perth filter
  • Great Southern (1) Apply Great Southern filter
  • South West (1) Apply South West filter

Filter by last updated:

  • 2022 (15) Apply 2022 filter
  • 2021 (2) Apply 2021 filter
  • 2020 (3) Apply 2020 filter
  1. Home
  2. Proposal search
  3. Air Quality
  4. Inland Waters
  5. Terrestrial Fauna

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Brockman Syncline Proposal

Last updated: December 21, 2022

The Brockman Syncline proposal is located approximately 60 km west-north west of Tom Price, in the central Pilbara region of Western Australia. The proposal includes up to 9,977 ha of native vegetation clearing to support the development of new and above and below water table mining areas in order to sustain mining at three existing operations; Nammuldi-Silvergrass Brockman 2 Brockman 4 The proposal includes, but is not limited to the following: Dewatering and surplus water management,... Read more...

Fimiston Gold Mine Operations Extension (Stage 3) and Mine Closure Planning: Revised Proposal - Fimiston South Project

Last updated: December 19, 2022

Kalgoorlie Consolidated Gold Mines is seeking to expand the Fimiston Gold mine operations (Fimiston), located 600 kilometres East of Perth, and adjacent to the City of Kalgoorlie-Boulder, Western Australia. The proposal is a significant amendment to the current Fimiston Gold Mine Operations Extension (Stage 2) and Mine Closure Planning, approved under Ministerial Statement 782, operated by Kalgoorlie Consolidated Gold Mines (KCGM). The proposal is for the expansion of the Fimiston operations in... Read more...

Pinjarra Alumina Refinery Revised Proposal

Last updated: November 24, 2022

Alcoa of Australia Limited is proposing to increase production at the Pinjarra Alumina Refinery (the refinery) and increase the rate of bauxite mining at the existing Huntly Mine within Mineral Lease 1SA (ML1SA) to supply 2.5 million tonnes per annum (Mtpa) bauxite, for export to third party customers. The Proposal comprises the following components: an increase in alumina production at the refinery by 5 percent, from 5.0 Mtpa to 5.25 Mtpa; A transition of the Huntly mine into the Myara North... Read more...

Kemerton Strategic Industrial Area (KSIA)

Last updated: October 5, 2022

DevelopmentWA is seeking to develop the Kemerton Strategic Industrial Area (KSIA) for the purpose of industrial and infrastructure development as a strategic proposal. The KSIA is located within the Shire of Harvey, 17 kilometres north of Bunbury. The KSIA key characteristics are: Development of the Kemerton Strategic industry Zone (Industry Core) which is approximately 2,024 hectares (ha). There is an approximate 50-year time period for development. Ultimate land use proposed is to be heavy... Read more...

Manuwarra Red Dog Highway – Revised Proposal

Last updated: September 5, 2022

In 1998 Main Roads Western Australia (Main Roads) referred Stages 2, 3 and 4 of the Karratha – Tom Price Road, now called the Manuwarra Red Dog Highway (the Original Proposal), to the Environmental Protection Authority (EPA). The EPA assessed the Original Proposal and published EPA Report 1159. Ministerial Statement (MS) 677 was published in 2005. Construction of Stage 2 was completed in 2008. Stage 3 of the Original Proposal is currently under construction and is expected to be completed in... Read more...

Worsley Mine Expansion – Revised Proposal

Last updated: August 29, 2022

South32 Worsley Alumina Pty Ltd currently operates the Boddington Bauxite Mine (located approximately 5km south-west of Boddington), Worsley Refinery (located approximately 15 km north-west of Collie) and port operations at the Bunbury Port. The new proposal is for the: · expansion of the existing mining area and incorporation of new mining areas; · development of a bauxite transport corridor; · development of a contingency mining area and maintenance work at the Refinery; and · development of... Read more...

Mulga Downs Iron Ore Mine

Last updated: August 24, 2022

The Proposal is located 210 km south of Port Hedland and 180 km north west of Newman in the Pilbara region of Western Australia. The proposal is located within a 40,653 ha Development Envelope and will require clearing of no more than 9,628 ha of native vegetation. The proposal includes, but is not limited to, the following: - The development of a series of above and below water table mine pits; - Ore processing facility; - Groundwater abstraction for water supply (for the mine and all... Read more...

Arrowsmith Central Silica Sand Project

Last updated: June 20, 2022

The proponent (VRX Silica Ltd) proposes to develop a high-grade silica sand mine in the Geraldton Sandplain bioregion of WA, approximately 260 km north of Perth and 20km North-West of Eneabba. The proposal would include a total disturbance of 334 hectares of native vegetation. Vegetation and topsoil would be relocated to rehabilitation areas using a Vegetation Direct Transfer method (VDT). Mining is proposed to occur in blocks (150m x 150m), with up to five blocks being mined each year. The... Read more...

Arrowsmith North Silica Sand Project

Last updated: June 14, 2022

VRX Silica Ltd propose to develop a silica sand mine in the Geraldton Sandplain bioregion of Western Australia, approximately 270 km north of Perth. The proposal would include a total disturbance of 412.2 hectares of native vegetation and will involve sequential mining of sand 8 – 15 metres below the soil surface. Vegetation and topsoil will be relocated to rehabilitation areas using the Vegetation Direct Transfer method. Mining will be undertaken in sections by removing blocks (typically 150m... Read more...

Gidgegannup Granite Quarry (S46) [2342]

Last updated: May 30, 2022

The requested change relates to condition 3 of Statement 1035 (as relevant to Statement 861) for an extension to the Time Limit for Proposal Implementation. Read more...

West Erregulla Processing Plant and Pipeline

Last updated: May 30, 2022

AGI Operations Pty Limited propose to construct and operate a gas processing plant and pipeline associated with the development of the West Erregulla gas field, located approximately 230 kilometres (km) north-east of Perth, and 50 km south-east of Dongara, Western Australia. The processing plant will process gas produced from third party owned upstream wells. The processed gas will then be transported via a new interconnecting pipeline to the Dampier to Bunbury Natural Gas Pipeline (DBNGP). The... Read more...

Revised Proposal for the Roy Hill Iron Ore Mine

Last updated: May 19, 2022

The Revised Proposal outlines a significant increase in ground disturbance to that previously approved, a revised materials management strategy, a Life of Mine water management strategy including Managed Aquifer Reinjection, a significant increase in dewatering volumes and establishment of permanent surface water diversion structures. Read more...

Murchison Hydrogen Renewables Project

Last updated: May 16, 2022

The Proposal will use combined onshore wind and solar energy of approximately 5.2 gigawatt (GW) capacity to produce green hydrogen which will be converted to an estimated 2 Million tonnes per annum (Mtpa) of green ammonia for export to emerging green energy markets. The Proposal is located within the Shire of Northampton, Western Australia (WA), approximately 20 km north of Kalbarri. The Proposal comprises the following major components: a wind and solar farm with a combined installed capacity... Read more...

Valhalla Gas Exploration and Appraisal Program

Last updated: May 6, 2022

Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to twenty wells in a region of the Canning Basin that has been previously surveyed and explored for petroleum purposes. The proposal is... Read more...

Lynas Kalgoorlie Rare Earths Processing Facility

Last updated: February 1, 2022

Lynas Kalgoorlie Pty Ltd (Lynas) propose to construct and operate a new Rare Earths Processing Facility at Lot 500 Great Eastern Highway, Yilkari and a By-product storage facility on Common Reserve 8767, Yarri Road, Parkerston in the City of Kalgoorlie-Boulder. The Rare Earths Processing Facility will process rare earth concentrate from the Mt Weld mine to produce a rare earth carbonate for export. Read more...

Wuudagu Bauxite Project

Last updated: June 9, 2021

VBX Limited propose to develop a bauxite mine located approximately 15 km west of the town of Kalumburu in the Kimberley. The proposal involves the mining of bauxite in the Kimberley and the use of a conveyor to transport processed ore to a barge-loading facility in Napier Broome Sound, and then trans-shipping of ore. Read more...

Lake Way Sulphate of Potash Project

Last updated: April 28, 2021

Salt Lake Potash Limited propose to abstract Sulphate of Potash (SOP) rich brines to produce up to 260 kilotonnes per annum (ktpa) of SOP product. The proposal is located in and around Lake Way, approximately 25 kilometres south of Wiluna. The activities and infrastructure proposed includes evaporation ponds, brine abstraction trenches, paleochannel brine production bores, permanent brine pumps/pipework, access and infrastructure corridors and excess salt disposal areas. The proposal will cover... Read more...

EP371 Laurel Gas Exploration and Appraisal Program

Last updated: December 2, 2020

Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to six wells in a region of the Canning Basin that has been previously surveyed and explored for petroleum purposes. The proposal is... Read more...

Albany Iron Ore Project - Southdown Magnetite Proposal (s46) [2222]

Last updated: July 23, 2020

Changes to Condition 3 in order to extend the Time Limit of Authorisation for commencement of the proposal. Read more...

Kwinana Bulk Liquid Terminal

Last updated: February 10, 2020

GrainCorp Liquid Terminals Australia Pty Ltd proposes to construct and operate a bulk liquids terminal at Lot 108 Kwinana Beach Road, Kwinana Beach within the Kwinana Strategic Industrial Area. The proposal would involve disturbance of approximately 2.7 hectares and site activities include the transfer and storage of bulk liquids including urea ammonium nitrate liquid fertiliser solution, tallow, vegetable and used cooking oils, industrial solvent, and caustic soda 33%. Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2023 Government of Western Australia. All rights reserved.