This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 25, 2021
Changes to condition 5 (relating to performance review), condition 9 (relating to stack emissions), and condition 11 (relating to decommissioning), in order to contemporise the conditions of the Statement and streamline its regulatory obligations. Read more...Last updated: November 23, 2021
Changes to Schedule 1 and Condition 12 (Odour Management) of Ministerial Statement 755 in order to: • Amend a key proposal characteristic in Schedule 1 regarding venting of odours. • Review the suitability of Condition 12 in light of the proposed change to Schedule 1 and having regard to the Licence requirements under Part V of the EP Act. Read more...Last updated: October 4, 2021
The Waitsia Gas Project Stage 2 is a conventional gas proposal located approximately 16km East-South-East of the Dongara-Port Denison town sites. The proposal includes clearing of up to 17 ha of native vegetation to support the following: Construction and operation of a new gas processing plant with a maximum export capacity of 250 terajoules per day; Drilling of up to 6 new production wells to supplement the existing 2 wells; Installation of a gas gathering system comprising of flowlines and... Read more...Last updated: September 13, 2021
Alinta Energy (subsidiary of Alinta DEWAP Pty Ltd) currently owns and operates the existing Port Hedland Power Station (PHPS) located within the Boodarie Strategic Industrial Area approximately 12 km south of the Port Hedland town centre and approximately 5 km west of South Hedland, ., The Proposal utilises new technologies providing more energy efficient and reliable power to customers in the Port Hedland area. This will include the installation of a 60 Megawatts (MW) natural gas fuelled... Read more...Last updated: September 1, 2021
The proposal is an expansion of the existing Sino Iron Project approved under Ministerial Statement 635 (as amended). The proposal is required to accommodate continuation of mine operations associated with the existing two billion tonnes mining rights afforded to Sino Iron and Korean Steel in accordance with existing commercial agreements. It includes the expansion of the mine pit, waste dumps and Tailings Storage Facilities. The proposed mine pit expansion will increase in depth from 220 m to... Read more...Last updated: September 1, 2021
The proposal is for the construction and operation of a gas processing plant, onshore supply gas pipeline, onshore sales gas pipeline, and horizontal directionally drilled shore crossing. Read more...Last updated: August 9, 2021
The original proposal is for mining of silica (quartzite) rock approximately 15 kilometres north of Moora on Mining Lease M70/191, and smelting to produce silicon, employing wood, charcoal, coal and the silica mined at Moora, in the Kemerton Industrial Area approximately 20 kilometres north of Bunbury in the Shire of Harvey. This revised proposal is for an increase from the approved three submerged electric arc furnaces to four submerged electric arc furnaces at the Kemerton site, and the... Read more...Last updated: July 15, 2021
The proposal is for the construction and operation of a Lithium Hydroxide Refinery at Lot 15 Mason Road, Kwinana within the Kwinana Industrial Area, approximately 31 km south of the Perth Central Business District. The Proposal will process spodumene ore concentrate, to produce battery grade Lithium Hydroxide Monohydrate, primarily for use in Lithium ion batteries for electric vehicles. The proposal would require a total of 11.2 hectares of native vegetation clearing within a 76 hectare... Read more...Last updated: June 24, 2021
Open cut dry mining of mineral sands and the processing of mined material through primary and secondary concentration plants and dry minerals separation. It includes the construction and operation of associated infrastructure and a modification to the intersection of Brand Hwy with Wannamal Road West. Read more...Last updated: June 9, 2021
VBX Limited propose to develop a bauxite mine located approximately 15 km west of the town of Kalumburu in the Kimberley. The proposal involves the mining of bauxite in the Kimberley and the use of a conveyor to transport processed ore to a barge-loading facility in Napier Broome Sound, and then trans-shipping of ore. Read more...Last updated: April 28, 2021
Salt Lake Potash Limited propose to abstract Sulphate of Potash (SOP) rich brines to produce up to 260 kilotonnes per annum (ktpa) of SOP product. The proposal is located in and around Lake Way, approximately 25 kilometres south of Wiluna. The activities and infrastructure proposed includes evaporation ponds, brine abstraction trenches, paleochannel brine production bores, permanent brine pumps/pipework, access and infrastructure corridors and excess salt disposal areas. The proposal will cover... Read more...Last updated: April 16, 2021
Robe River Mining Co. proposes to develop the West Angelas C, D and G iron ore deposits to sustain production at the existing West Angelas iron ore operations. The proposal is located approximately 130 km northwest of Newman. Mining of the C, D and G iron ore deposits will involve the additional clearing of up to 4,310 ha of native vegetation within a mine development envelope of 26,400 ha. Mine dewatering will be required to accommodate below water table mining, requiring an additional ... Read more...Last updated: February 3, 2021
Main Roads WA is proposing to conduct works to upgrade approximately 1.5 kilometre (km) of High Street in the City of Fremantle, Western Australia. The upgrade from Stirling Highway to Carrington Street to a four lane dual carriageway is aimed at improving road safety. The works would require a total disturbance of approximately 20.1 hectares (ha), including 1.8 ha of the Fremantle Public Golf Course, Royal Fremantle Golf Club (Class A reserve) and 0.1 ha of the Fremantle Environmental Resource... Read more...Last updated: February 1, 2021
PEG proposes to construct and operate 14 new gas-fired reciprocating engines with a combined maximum installed capacity of 165 MW. It is expected the average annual throughput of the facility will be approximately 150 MW. The 165 MW power station is expected to result in 609,696 tCO2-e. The proposed PEG power station is located next to the existing Solomon power station and replaces the need for 221 MW power at Iron Bridge, which would have resulted in 1,196,423 tCO2-e. FMG have submitted a... Read more...Last updated: January 7, 2021
Alcoa of Australia have requested changes to conditions 8, 9, 10, 11 and 12 of Ministerial Statement 728 and 1069 in order to facilitate an increase in production to 3.3 million tonnes per annum (Mtpa). Read more...