This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 19, 2024
FI Joint Venture Pty Ltd is proposing to construct and operate a magnetite iron ore project, with mining, processing and associated infrastructure. The proposed mine is located approximately 225 kilometres (km) east-northeast of Geraldton and 15 km northeast of Yalgoo within the Shire of Yalgoo. The proposal includes a magnetite slurry pipeline and a water pipeline to Geraldton Port and a gas supply pipeline from the Dampier to Bunbury Natural Gas Pipeline network. Mining of the magnetite will... Read more...Last updated: February 12, 2009
The proposal is to develop an iron ore (haematite) mine at Jack Hills approximately 100 km west of Meekatharra. The project will have a lifespan of approximately seven years (five years of mining, two years of closure activities) and will be a contract mining operation. The project will consist of an open cut mine with one pit up to 140 metres deep (approximately 41.2 MT of ore and waste rock). The floor of the pit will be above the watertable and the pit will not be backfilled. Product will be... Read more...Last updated: December 12, 1997
The proposal is to establish the Geraldton Steel Plant (GSP) at Oakajee, 23km north of Geraldton. The GSP will be located within the planned Oakajee Industrial Estate in the Shire of Chapman Valley. The proposal will consist of the following main components: a pellet plant in which the majority of iron ore is converted to pellets suitable for direct reduction; two direct reduction plants for the reduction of pelletised iron ore to direct reduced iron; three electric arc furnaces and tlu·ee... Read more...Last updated: October 13, 1997
The proposal is to to increase the production of Kingstream Resources' recently assessed Mid West Iron & Steel Project Geraldton Steel Plant (GSP), at the Narngulu Industrial Estate south-east of Geraldton, from 1.0 Mt/a to 2.4 Mt/a. Changes are also proposed to the product, specifically that slab steel be produced rather than rolled coil, with resulting changes in the requirement for major plant. Read more...Last updated: April 19, 1996
The proposal is for the establishment of an iron ore mine at Tallering Peak, 70km north of Mullewa; transport of iron ore by road and rail to the GSP at Narngulu Industrial Estate near Geraldton; and transport of steel product by road from Narngulu to the Port of Geraldton for export. Read more...