Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre

Filter by industry sector:

  • (-) Remove Iron Ore filter Iron Ore
  • Infrastructure (5) Apply Infrastructure filter

Filter by current status:

  • Ministerial Statement published (10) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (3) Apply Decision on whether to assess has been published filter
  • Assessment has been terminated under s40A of the EP Act (1) Apply Assessment has been terminated under s40A of the EP Act filter
  • Environmental Review document open for public submissions (1) Apply Environmental Review document open for public submissions filter
  • Environmental Scoping Document approved (1) Apply Environmental Scoping Document approved filter
  • Public Environmental Review period closed (1) Apply Public Environmental Review period closed filter

Filter by relevant environmental factors:

  • (-) Remove Air Quality filter Air Quality
  • (-) Remove Social Surroundings filter Social Surroundings
  • (-) Remove Terrestrial Fauna filter Terrestrial Fauna
  • Flora and Vegetation (17) Apply Flora and Vegetation filter
  • Inland Waters Environmental Quality (9) Apply Inland Waters Environmental Quality filter
  • Subterranean Fauna (9) Apply Subterranean Fauna filter
  • Hydrological Processes (8) Apply Hydrological Processes filter
  • Inland Waters (5) Apply Inland Waters filter
  • Greenhouse Gas Emissions (4) Apply Greenhouse Gas Emissions filter
  • Terrestrial Environmental Quality (4) Apply Terrestrial Environmental Quality filter
  • Landforms (2) Apply Landforms filter
  • Benthic Communities and Habitats (1) Apply Benthic Communities and Habitats filter
  • Coastal Processes (1) Apply Coastal Processes filter
  • Marine Environmental Quality (1) Apply Marine Environmental Quality filter
  • Marine Fauna (1) Apply Marine Fauna filter
  • People (1) Apply People filter

Filter by Proponent:

  • Hamersley Iron Pty Limited (2) Apply Hamersley Iron Pty Limited filter
  • API Management Pty Limited (1) Apply API Management Pty Limited filter
  • Atlas Iron Pty Ltd (1) Apply Atlas Iron Pty Ltd filter
  • BHP Billiton Iron Ore Pty Ltd (1) Apply BHP Billiton Iron Ore Pty Ltd filter
  • BHP Iron Ore Pty Ltd (1) Apply BHP Iron Ore Pty Ltd filter
  • BHP Iron Ore Pty Ltd. (1) Apply BHP Iron Ore Pty Ltd. filter
  • FI Joint Venture Pty Ltd (FIJV) (1) Apply FI Joint Venture Pty Ltd (FIJV) filter
  • Fortescue Metals Group Limited (1) Apply Fortescue Metals Group Limited filter
  • Fortescue Metals Group Ltd (1) Apply Fortescue Metals Group Ltd filter
  • Grange Resources Limited (1) Apply Grange Resources Limited filter
  • Grange Resources Ltd (1) Apply Grange Resources Ltd filter
  • Hamersley Iron Pty Ltd (1) Apply Hamersley Iron Pty Ltd filter
  • Hancock Prospecting Pty Ltd (1) Apply Hancock Prospecting Pty Ltd filter
  • Murchison Metals Ltd (1) Apply Murchison Metals Ltd filter
  • Port Hedland Green Steel Pty Ltd (1) Apply Port Hedland Green Steel Pty Ltd filter
  • Robe River Mining Co. Pty. Ltd (1) Apply Robe River Mining Co. Pty. Ltd filter

Filter by region:

  • Pilbara (13) Apply Pilbara filter
  • Great Southern (2) Apply Great Southern filter
  • Mid West (2) Apply Mid West filter

Filter by last updated:

  • 2023 (6) Apply 2023 filter
  • 2022 (1) Apply 2022 filter
  • 2021 (1) Apply 2021 filter
  • 2020 (2) Apply 2020 filter
  • 2019 (1) Apply 2019 filter
  • 2016 (1) Apply 2016 filter
  • 2015 (1) Apply 2015 filter
  • 2012 (1) Apply 2012 filter
  • 2011 (1) Apply 2011 filter
  • 2009 (1) Apply 2009 filter
  • 2003 (1) Apply 2003 filter
  1. Home
  2. Proposal search
  3. Air Quality
  4. Iron Ore
  5. Social Surroundings
  6. Terrestrial Fauna

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Eliwana Iron Ore Mine

Last updated: November 6, 2023

Fortescue Metals Group Ltd proposes to develop the Eliwana Mine Project in the Pilbara region of Western Australia. The Eliwana Mine Project Area is located approximately 90 km west-northwest of Tom Price. Over the life of the mine, the average annual production rate is estimated at 30 Mtpa but infrastructure will be constructed to reflect peaks in the annual production rate up to 50 Mtpa. The estimated mine life is 24 years. The proposal involves the clearing of up to 8,560 ha of native... Read more...

Port Hedland Green Steel Project - Stage 1

Last updated: October 23, 2023

Port Hedland Green Steel Pty Ltd proposes to develop a large-scale downstream iron ore processing facility known as the Port Hedland Green Steel Project – Stage 1. The proposal is located in the Boodarie Strategic Industrial Area (BSIA) approximately 10 km south-west of Port Hedland in the Pilbara region. The proposal will consist of a pellet plant and a hot briquette iron (HBI) plant, consuming approximately 3 - 3.5 million tonnes per annum (Mtpa) of iron ore. Most of the pellets will be fed... Read more...

Brockman Syncline Proposal

Last updated: September 18, 2023

The Brockman Syncline proposal is located approximately 60 km west-north west of Tom Price, in the central Pilbara region of Western Australia. The proposal includes up to 9,977 ha of native vegetation clearing to support the development of new and above and below water table mining areas in order to sustain mining at three existing operations; Nammuldi-Silvergrass Brockman 2 Brockman 4 The proposal includes, but is not limited to the following: Dewatering and surplus water management,... Read more...

Newman Hub (Western Ridge) Derived Proposal

Last updated: September 8, 2023

BHP propose to expand existing mining operations at the Newman Hub in the Pilbara, approximately 2 kilometres (km) southwest of Newman. The Proposal is a derived proposal for mining operations at Newman (Western Ridge) authorised by the Pilbara Expansion Strategic Proposal, Ministerial Statement 1105. The proposal is to develop four iron ore deposits to expand BHP’s Newman Hub and includes: overburden storage areas ore and topsoil stockpiles haul and access roads overland conveyor 30 million... Read more...

Ridley Magnetite Project

Last updated: June 7, 2023

The Ridley Magnetite Project (the Proposal) is located approximately 57 km east of Port Hedland. The proposal is located within a 14,181 ha Development Envelope with an indicative disturbance footprint of 7,406 ha. The proposal is for the mining and processing of iron ore to produce 3 Million tonnes per annum (Mtpa) of magnetite concentrate for export under Stage 1, with an increase to 16.5 Mtpa under Stage 2. The proposal includes a single pit (below water table), run-of-mine pad, concentrate... Read more...

Mulga Downs Iron Ore Mine

Last updated: May 26, 2023

The Proposal is located 210 km south of Port Hedland and 180 km north west of Newman in the Pilbara region of Western Australia. The proposal is located within a 40,653 ha Development Envelope and will require clearing of no more than 9,628 ha of native vegetation. The proposal includes, but is not limited to, the following: - The development of a series of above and below water table mine pits; - Ore processing facility; - Groundwater abstraction for water supply (for the mine and all... Read more...

Yogi Magnetite Project

Last updated: November 28, 2022

FI Joint Venture Pty Ltd is proposing to construct and operate a magnetite iron ore project, with mining, processing and associated infrastructure. The proposed mine is located approximately 225 kilometres (km) east-northeast of Geraldton and 15 km northeast of Yalgoo within the Shire of Yalgoo. The proposal includes a magnetite slurry pipeline and a water pipeline to Geraldton Port and a gas supply pipeline from the Dampier to Bunbury Natural Gas Pipeline network. Mining of the magnetite will... Read more...

West Angelas Iron Ore Project Deposits C, D and G

Last updated: April 16, 2021

Robe River Mining Co. proposes to develop the West Angelas C, D and G iron ore deposits to sustain production at the existing West Angelas iron ore operations. The proposal is located approximately 130 km northwest of Newman.   Mining of the C, D and G iron ore deposits will involve the additional clearing of up to 4,310 ha of native vegetation within a mine development envelope of 26,400 ha. Mine dewatering will be required to accommodate below water table mining, requiring an additional  ... Read more...

Albany Iron Ore Project - Southdown Magnetite Proposal (s46) [2222]

Last updated: July 23, 2020

Changes to Condition 3 in order to extend the Time Limit of Authorisation for commencement of the proposal. Read more...

Brockman Syncline 4 Iron Ore Project – Marra Mambas Proposal

Last updated: April 6, 2020

Hamersley Iron Pty Limited propose to expand its existing Brockman 4 Syncline Iron Ore Mine. The expansion would include further clearing of up to 4,800 hectares and expand its current development envelope by 2,567 hectares. Additional dewatering would also take place resulting in dewater discharge extending further along Boolgeeda Creek by nine kilometres. Read more...

Cloudbreak Life of Mine Expansion

Last updated: June 6, 2019

The proposal includes the existing Cloudbreak iron ore mine and proposed expansion. The existing mine includes open pit strip mining, backfilling of pits, progressive rehabilitation and ore processing. The expansion includes increasing ore production, development of new pits and permanent waste landforms, the development of new infrastructure, additional dewatering and water disposal activities, an upgrade of the ore processing facility. Read more...

West Pilbara Iron Ore Project Stage 1 - Mine and Rail

Last updated: February 4, 2016

The proposal is to develop eight iron ore deposits at five locations, between 35 and 85 kilometres (km) south of Pannawonica. A heavy-haulage railway approximately 285 km in length would be developed to connect the mine area with a port to be constructed at Anketell Point, 25 km north-east of Karratha. The project would produce up to 30 million tonnes per annum (Mtpa) of iron ore. Read more...

Orebody 18 Iron Ore Mine (s. 46)

Last updated: August 7, 2015

The Minister for Environment requested the EPA inquire into the matter of changing the implementation conditions relating to the Orebody 18 Iron Ore Mine proposal, particularly the matter of setting a condition on the proposal that would require environmental offsets for the clearing of native vegetation. Inquiry under s46 relating to Ministerial Statement 439 and EPA Report 840 . Read more...

Newman Satellite Development - Orebody 23

Last updated: December 4, 2012

The proposal is for mining of iron ore below the watertable from the Orebody 23 deposit on the Ophthalmia Range, including de-watering operations, approximately 13 kilometres north-east of Newman, Shire of East Pilbara. Read more...

Albany Iron Ore Project - Southdown Magnetite Proposal

Last updated: November 22, 2011

The proposal involves the construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Read more...

Jack Hills Iron Ore Project

Last updated: February 12, 2009

The proposal is to develop an iron ore (haematite) mine at Jack Hills approximately 100 km west of Meekatharra. The project will have a lifespan of approximately seven years (five years of mining, two years of closure activities) and will be a contract mining operation. The project will consist of an open cut mine with one pit up to 140 metres deep (approximately 41.2 MT of ore and waste rock). The floor of the pit will be above the watertable and the pit will not be backfilled. Product will be... Read more...

Dampier Port Upgrade to 95 Mtpa Capacity

Last updated: November 24, 2003

Proposal by Hamersley Iron to increase the capacity of its Dampier Port operations from 80 million tonnes per annum (Mtpa) (licensed capacity) to 95 Mtpa. Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2023 Government of Western Australia. All rights reserved.